North Sky River Energy, LLC, et al; Notice of Effectiveness of Exempt Wholesale Generator Status, 11169 [2013-03500]
Download as PDF
Federal Register / Vol. 78, No. 32 / Friday, February 15, 2013 / Notices
electronically via the Internet (eFiling)
in lieu of paper. Please refer to the
Federal Energy Regulatory
instructions on the Commission’s Web
Commission
site under https://www.ferc.gov/docsfiling/efiling.asp and filing instructions
[Docket Nos. EG13–6–000, et al]
in the Commission’s Regulations at 18
CFR section 385.2001(a)(1)(iii).1 To
North Sky River Energy, LLC, et al;
assist you with eFilings you should refer
Notice of Effectiveness of Exempt
to the submission guidelines document
Wholesale Generator Status
at https://www.ferc.gov/help/submissionguide/user-guide.pdf. In addition,
Docket Nos.
certain filing requirements have
North Sky River Energy, LLC
EG13–6–000 statutory or regulatory formatting and
Black Bear SO, LLC .............
EG13–7–000 other instructions. You should refer to
Black Bear Development
a list of these ‘‘qualified documents’’ at
Holdings, LLC ...................
EG13–8–000 https://www.ferc.gov/docs-filing/efiling/
Shiloh IV Lessee, LLC ..........
EG13–9–000
filing.pdf. You must include your name
Grand Ridge Energy IV LLC
EG13–10–000
and contact information at the end of
your comments. Please include the
Take notice that during the month of
project number (P–8657–064) on any
January 2013, the status of the abovecaptioned entities as Exempt Wholesale documents or motions filed. The
Generators Companies became effective Commission strongly encourages
electronic filings; otherwise, you should
by operation of the Commission’s
submit an original and seven copies of
regulations. 18 CFR 366.7(a).
its submittal to the following address:
Dated: February 8, 2013.
The Secretary, Federal Energy
Kimberly D. Bose,
Regulatory Commission, Mail Code:
Secretary.
DHAC, PJ–12, 888 First Street NE.,
[FR Doc. 2013–03500 Filed 2–14–13; 8:45 am]
Washington, DC 20426
j. Description of Existing Facilities:
BILLING CODE 6717–01–P
The inoperative project consists of the
following existing facilities: (a) A 400DEPARTMENT OF ENERGY
foot-long concrete dam, varying in
height from 7 feet to 9 feet; (b) a
Federal Energy Regulatory
reservoir with a surface area of 7 acres
Commission
and a storage capacity of 49 acre-feet at
powerpool elevation of 12.63 feet m.s.l.;
[Project No. 8657–064]
(c) a powerhouse, located at the dam,
containing one generating unit rated at
Virginia Hydrogeneration and
150 kW; (d) a 170-foot-long canal to the
Historical Society’s, L.C.; Notice of
powerhouse located east of the dam; (e)
Termination of License by Implied
a powerhouse, located east of the dam,
Surrender and Soliciting Comments,
containing two generating units rated at
Protests, and Motions To Intervene
300 kW each; (f) a tailrace at the
Take notice that the following
powerhouse east of the dam; (g) a
hydroelectric proceeding has been
transmission system which includes the
initiated by the Commission:
2.3-kV generator leads, the 270-foota. Type of Proceeding: Termination of long, 2.3-kV transmission line from the
license by implied surrender.
powerhouse at the dam, and the 2.3-kV
b. Project No.: 8657–064.
leads and the 2.3-kV bus at the
c. Date Initiated: February 8, 2013.
powerhouse east of the dam, the
d. Licensee: Virginia Hydrogeneration
transformer, and the 130-foot-long, 13.2and Historical Society’s, L.C.
kV transmission line; and (h)
e. Name and Location of Project: The
appurtenant facilities.
Harvell Hydroelectric Project is located
k. Description of Proceeding: The
on Appomattox River in Dinwiddie and licensee is in violation of Standard
Chesterfield counties, Virginia.
Article 16 of its license, which was
f. Filed Pursuant to: 18 CFR 6.4.
granted on December 1, 1987 (41 FERC
g. Licensee Contact Information:
¶ 62,193). The Commission’s
C.D.L. Perkins c/o Bryan Brothers; 1802 regulations, 18 CFR 6.4, provides,
Bayberry Court, Suite 301; Richmond,
among other things, that the
VA 23226.
Commission may terminate a project by
h. FERC Contact: Krista Sakallaris
implied surrender if the licensee
(202) 502–6302 or
abandons or discontinues good faith
Krista.Sakallaris@ferc.gov.
operation of the project for a period of
i. Deadline for filing comments,
protests, and motions to intervene is 30
1 https://www.ferc.gov/legal/fed-sta.asp Select the
days from the issuance date of this
link for Code of Federal Regulations and navigate
notice. Please file your submittal
to § 385.2001.
mstockstill on DSK4VPTVN1PROD with NOTICES
DEPARTMENT OF ENERGY
VerDate Mar<15>2010
19:09 Feb 14, 2013
Jkt 229001
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
11169
three years. The project stopped
operating prior to an August 2006 safety
inspection.
The most recent correspondence
received from this licensee, was a Joint
Offer of Settlement, dated July 22, 2005.
The correspondence stated that the
licensee had disconnected all electrical
generating equipment from the power
grid and made reasonable efforts to
secure the site. The Commission did not
act on the filing due to the inability to
resolve issues associated with
terminating the license. Since then,
Commission staff inspected the project
in August 2006 and again in September
2009. A project representative was not
present during the inspections, and the
project was locked and appeared
abandoned.
l. This notice is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the Docket number (P–8657–064)
excluding the last three digits in the
docket number field to access the
notice. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
and 385.214. In determining the
appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular proceeding.
o. Filing and Service of Responsive
Documents—Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE,’’ as
applicable; (2) set forth in the heading
the project number of the proceeding to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person commenting,
E:\FR\FM\15FEN1.SGM
15FEN1
Agencies
[Federal Register Volume 78, Number 32 (Friday, February 15, 2013)]
[Notices]
[Page 11169]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-03500]
[[Page 11169]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EG13-6-000, et al]
North Sky River Energy, LLC, et al; Notice of Effectiveness of
Exempt Wholesale Generator Status
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
North Sky River Energy, LLC............................. EG13-6-000
Black Bear SO, LLC...................................... EG13-7-000
Black Bear Development Holdings, LLC.................... EG13-8-000
Shiloh IV Lessee, LLC................................... EG13-9-000
Grand Ridge Energy IV LLC............................... EG13-10-000
------------------------------------------------------------------------
Take notice that during the month of January 2013, the status of
the above-captioned entities as Exempt Wholesale Generators Companies
became effective by operation of the Commission's regulations. 18 CFR
366.7(a).
Dated: February 8, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-03500 Filed 2-14-13; 8:45 am]