Download as PDF Federal Register / Vol. 78, No. 32 / Friday, February 15, 2013 / Notices electronically via the Internet (eFiling) in lieu of paper. Please refer to the Federal Energy Regulatory instructions on the Commission’s Web Commission site under https://www.ferc.gov/docsfiling/efiling.asp and filing instructions [Docket Nos. EG13–6–000, et al] in the Commission’s Regulations at 18 CFR section 385.2001(a)(1)(iii).1 To North Sky River Energy, LLC, et al; assist you with eFilings you should refer Notice of Effectiveness of Exempt to the submission guidelines document Wholesale Generator Status at https://www.ferc.gov/help/submissionguide/user-guide.pdf. In addition, Docket Nos. certain filing requirements have North Sky River Energy, LLC EG13–6–000 statutory or regulatory formatting and Black Bear SO, LLC ............. EG13–7–000 other instructions. You should refer to Black Bear Development a list of these ‘‘qualified documents’’ at Holdings, LLC ................... EG13–8–000 https://www.ferc.gov/docs-filing/efiling/ Shiloh IV Lessee, LLC .......... EG13–9–000 filing.pdf. You must include your name Grand Ridge Energy IV LLC EG13–10–000 and contact information at the end of your comments. Please include the Take notice that during the month of project number (P–8657–064) on any January 2013, the status of the abovecaptioned entities as Exempt Wholesale documents or motions filed. The Generators Companies became effective Commission strongly encourages electronic filings; otherwise, you should by operation of the Commission’s submit an original and seven copies of regulations. 18 CFR 366.7(a). its submittal to the following address: Dated: February 8, 2013. The Secretary, Federal Energy Kimberly D. Bose, Regulatory Commission, Mail Code: Secretary. DHAC, PJ–12, 888 First Street NE., [FR Doc. 2013–03500 Filed 2–14–13; 8:45 am] Washington, DC 20426 j. Description of Existing Facilities: BILLING CODE 6717–01–P The inoperative project consists of the following existing facilities: (a) A 400DEPARTMENT OF ENERGY foot-long concrete dam, varying in height from 7 feet to 9 feet; (b) a Federal Energy Regulatory reservoir with a surface area of 7 acres Commission and a storage capacity of 49 acre-feet at powerpool elevation of 12.63 feet m.s.l.; [Project No. 8657–064] (c) a powerhouse, located at the dam, containing one generating unit rated at Virginia Hydrogeneration and 150 kW; (d) a 170-foot-long canal to the Historical Society’s, L.C.; Notice of powerhouse located east of the dam; (e) Termination of License by Implied a powerhouse, located east of the dam, Surrender and Soliciting Comments, containing two generating units rated at Protests, and Motions To Intervene 300 kW each; (f) a tailrace at the Take notice that the following powerhouse east of the dam; (g) a hydroelectric proceeding has been transmission system which includes the initiated by the Commission: 2.3-kV generator leads, the 270-foota. Type of Proceeding: Termination of long, 2.3-kV transmission line from the license by implied surrender. powerhouse at the dam, and the 2.3-kV b. Project No.: 8657–064. leads and the 2.3-kV bus at the c. Date Initiated: February 8, 2013. powerhouse east of the dam, the d. Licensee: Virginia Hydrogeneration transformer, and the 130-foot-long, 13.2and Historical Society’s, L.C. kV transmission line; and (h) e. Name and Location of Project: The appurtenant facilities. Harvell Hydroelectric Project is located k. Description of Proceeding: The on Appomattox River in Dinwiddie and licensee is in violation of Standard Chesterfield counties, Virginia. Article 16 of its license, which was f. Filed Pursuant to: 18 CFR 6.4. granted on December 1, 1987 (41 FERC g. Licensee Contact Information: ¶ 62,193). The Commission’s C.D.L. Perkins c/o Bryan Brothers; 1802 regulations, 18 CFR 6.4, provides, Bayberry Court, Suite 301; Richmond, among other things, that the VA 23226. Commission may terminate a project by h. FERC Contact: Krista Sakallaris implied surrender if the licensee (202) 502–6302 or abandons or discontinues good faith Krista.Sakallaris@ferc.gov. operation of the project for a period of i. Deadline for filing comments, protests, and motions to intervene is 30 1 https://www.ferc.gov/legal/fed-sta.asp Select the days from the issuance date of this link for Code of Federal Regulations and navigate notice. Please file your submittal to § 385.2001. mstockstill on DSK4VPTVN1PROD with NOTICES DEPARTMENT OF ENERGY VerDate Mar<15>2010 19:09 Feb 14, 2013 Jkt 229001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 11169 three years. The project stopped operating prior to an August 2006 safety inspection. The most recent correspondence received from this licensee, was a Joint Offer of Settlement, dated July 22, 2005. The correspondence stated that the licensee had disconnected all electrical generating equipment from the power grid and made reasonable efforts to secure the site. The Commission did not act on the filing due to the inability to resolve issues associated with terminating the license. Since then, Commission staff inspected the project in August 2006 and again in September 2009. A project representative was not present during the inspections, and the project was locked and appeared abandoned. l. This notice is available for review and reproduction at the Commission in the Public Reference Room, Room 2A, 888 First Street NE., Washington, DC 20426. The filing may also be viewed on the Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the Docket number (P–8657–064) excluding the last three digits in the docket number field to access the notice. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call toll-free 1–866–208– 3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions To Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular proceeding. o. Filing and Service of Responsive Documents—Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) set forth in the heading the project number of the proceeding to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, E:\FR\FM\15FEN1.SGM 15FEN1

Agencies

[Federal Register Volume 78, Number 32 (Friday, February 15, 2013)]
[Notices]
[Page 11169]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-03500]



[[Page 11169]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. EG13-6-000, et al]


North Sky River Energy, LLC, et al; Notice of Effectiveness of 
Exempt Wholesale Generator Status

------------------------------------------------------------------------
                                                            Docket Nos.
------------------------------------------------------------------------
North Sky River Energy, LLC.............................      EG13-6-000
Black Bear SO, LLC......................................      EG13-7-000
Black Bear Development Holdings, LLC....................      EG13-8-000
Shiloh IV Lessee, LLC...................................      EG13-9-000
Grand Ridge Energy IV LLC...............................     EG13-10-000
------------------------------------------------------------------------

    Take notice that during the month of January 2013, the status of 
the above-captioned entities as Exempt Wholesale Generators Companies 
became effective by operation of the Commission's regulations. 18 CFR 
366.7(a).

    Dated: February 8, 2013.
Kimberly D. Bose,
Secretary.