Combined Notice of Filings #1, 10164-10165 [2013-03301]
Download as PDF
10164
Federal Register / Vol. 78, No. 30 / Wednesday, February 13, 2013 / Notices
comment. DOE prepared the Draft HTF
3116 Basis Document pursuant to
section 3116(a) of the Ronald W. Reagan
National Defense Authorization Act for
Fiscal Year 2005 (NDAA), which
provides that the Secretary of Energy
may, in consultation with the U.S.
Nuclear Regulatory Commission (NRC),
determine that certain waste from
reprocessing of spent nuclear fuel is not
high-level radioactive waste if the
provisions set forth in section 3116(a)
are satisfied. To make this
determination, the Secretary of Energy
must determine that the waste in the
HTF: (1) Does not require permanent
isolation in a deep geologic repository
for spent fuel or high-level radioactive
waste; (2) has had highly radioactive
radionuclides removed to the maximum
extent practical; and (3)(A) does not
exceed concentration limits for Class C
low-level waste and will be disposed of
in compliance with the performance
objectives in 10 CFR Part 61, Subpart C
and pursuant to a State approved
closure plan or State-issued permit; or
(3)(B) exceeds concentration limits for
Class C low-level waste but will be
disposed of in compliance with the
performance objectives of 10 CFR Part
61, Subpart C; pursuant to a State
approved closure plan or State-issued
permit; and pursuant to plans
developed by DOE in consultation with
the NRC. Although not required by the
NDAA, DOE is making the Draft HTF
3116 Basis Document available for
public comment. The Draft HTF 3116
Basis Document demonstrates that the
cleaned and stabilized HTF tanks,
ancillary structures and their stabilized
residuals at HTF closure meet the public
dose limits and other criteria in section
3116. DOE is consulting with the NRC
and will consider public comments
before preparing a final HTF 3116 Basis
Document and issuing a Secretarial
determination under section 3116.
The comment period will end on
May 1, 2013. Comments received after
this date will be considered to the
extent practicable.
DATES:
The Draft HTF Section 3116
Basis document is available on the
Internet at https://sro.srs.gov/
f_htankfarmsdocuments.htm.
Written comments on the draft HTF
Section 3116 Basis document may be
submitted by U.S. mail to the following
address: Ms. Sherri Ross, DOE–SR,
Building 704–S, Room 43, U.S.
Department of Energy, Savannah River
Operations Office, Aiken, SC 29802
(ATTN: H-Tank Farm Draft Basis).
Alternatively, comments may also be
filed electronically by email to
mstockstill on DSK4VPTVN1PROD with NOTICES
ADDRESSES:
VerDate Mar<15>2010
17:21 Feb 12, 2013
Jkt 229001
sherri.ross@srs.gov, or by Fax at (803)
208–7414.
SUPPLEMENTARY INFORMATION: The HTF
is a 45-acre site, located at the Savannah
River Site (SRS) near Aiken, South
Carolina. The HTF consists of 29
underground radioactive waste storage
tanks and supporting ancillary
structures. The major HTF ancillary
structures are three evaporator systems,
transfer lines, eight diversion boxes, one
catch tank, a concentrate transfer
system, ten pump pits, nine pump
tanks, and eleven valve boxes. There are
four waste tank types (Type I, II, III/IIIA,
and IV) in HTF with operating
capacities ranging from 750,000 gallons
to 1,300,000 gallons. The waste tanks
have varying degrees of secondary
containment and in-tank structural
features such as cooling coils and
columns. All HTF waste tanks are
constructed of carbon steel. The HTF
tanks and ancillary structures contain,
in part, waste from the prior
reprocessing of spent nuclear fuel, and
from various SRS production,
processing and laboratory facilities.
DOE is in the process of closing the
HTF and is engaged in an expansive
campaign to clean, stabilize, and close
the tanks and ancillary structures in the
HTF, using a process that includes
removing bulk waste from tanks and
applicable ancillary structures, followed
by deployment of tested technologies to
remove the majority of the remaining
waste. After completing cleaning
operations, a small amount of residual
radioactive waste will remain in the
tanks and ancillary structures. DOE
plans to stabilize the residuals in the
tanks and certain ancillary structures in
place with grout, followed by a closure
cap system for the HTF. Tank waste
storage and removal operations in the
HTF are governed by a South Carolina
Department of Health and
Environmental Control (SCDHEC)
industrial wastewater operating permit.
Removal of tanks from service and
stabilization of the HTF waste tanks and
ancillary structures will be carried out
pursuant to a State-approved closure
plan, the Industrial Wastewater General
Closure Plan for H-Area Waste Tank
Systems. Specific Closure Modules for
each tank or ancillary structure or
groupings of tanks and ancillary
structures will be developed and
submitted to SCDHEC for approval.
After SCDHEC approval of the specific
and final closure configuration
documentation and grouting, the
applicable tank or ancillary structure
will be removed from the State’s
industrial wastewater permit. Where
appropriate, the Draft HTF 3116 Basis
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Document draws upon DOE’s
experience in cleaning and closing tanks
at the similar F-Area Tank Farm at SRS,
for which the Secretary of Energy issued
a Section 3116 Determination in March
2012.
As demonstrated and documented in
the Draft HTF 3116 Basis Document, the
stabilized HTF tanks, ancillary
structures and residuals at closure meet
the public dose performance objective
and other criteria set forth in section
3116(a) of the NDAA. DOE is consulting
with the NRC pursuant to section 3116,
and will consider this consultation as
well as public comments before
preparing a final HTF 3116 Basis
Document. DOE anticipates that the
final HTF 3116 Basis Document will
serve as a predicate for the Secretary to
determine whether or not the stabilized
HTF tanks, ancillary structures and
residuals at closure meet the criteria in
section 3116(a), are not high-level
radioactive waste, and may be disposed
of in place as low-level waste.
Issued in Washington, DC, on February 6,
2013.
Mark A. Gilbertson,
Deputy Assistant Secretary for Site
Restoration.
[FR Doc. 2013–03305 Filed 2–12–13; 8:45 am]
BILLING CODE P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–1643–001.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
submits Order No. 755 Regulation Mkt.
Compliance Changes to be effective 12/
31/9998.
Filed Date: 2/6/13.
Accession Number: 20130206–5047.
Comments Due: 5 p.m. e.t. 2/27/13.
Docket Numbers: ER12–2277–003.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits 2013–02–05 SA 2457 G631–2–
3 Term to be effective 4/6/2013.
Filed Date: 2/5/13.
Accession Number: 20130205–5158.
Comments Due: 5 p.m. e.t. 2/26/13.
Docket Numbers: ER13–886–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
E:\FR\FM\13FEN1.SGM
13FEN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 30 / Wednesday, February 13, 2013 / Notices
submits tariff filing per 35.13(a)(2)(iii:
02–05–2013 SA 2456 Termination
Emmet Cty Energy-ITC to be effective 4/
6/2013.
Filed Date: 2/5/13.
Accession Number: 20130205–5156.
Comments Due: 5 p.m. e.t. 2/26/13.
Docket Numbers: ER13–887–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Request for Limited
Waiver of PJM Interconnection, L.L.C.
Filed Date: 2/6/13.
Accession Number: 20130206–5015.
Comments Due: 5 p.m. e.t. 2/27/13.
Docket Numbers: ER13–888–000.
Applicants: Niagara Mohawk Power
Corporation, New York Independent
System Operator, Inc.
Description: Niagara Mohawk Power
Corporation submits tariff filing per
35.13(a)(2)(iii: NYISO filing of
Agreement No. 1953 between National
Grid and Erie Blvd. Hydropowr to be
effective 11/9/2012.
Filed Date: 2/6/13.
Accession Number: 20130206–5040.
Comments Due: 5 p.m. e.t. 2/27/13.
Docket Numbers: ER13–889–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii:
02–05–2013 SA 2509 ITC-Tuscola Wind
E&P to be effective 2/7/2013.
Filed Date: 2/6/13.
Accession Number: 20130206–5044.
Comments Due: 5 p.m. e.t. 2/27/13.
Docket Numbers: ER13–890–000.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
L.L.C. submits Notice of Cancellation of
Original Service Agreement No. 3259 to
be effective 1/4/2013.
Filed Date: 2/6/13.
Accession Number: 20130206–5049.
Comments Due: 5 p.m. e.t. 2/27/13.
Docket Numbers: ER13–891–000.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
L.L.C. submits tariff filing per
35.13(a)(2)(iii: Non-Queue 69 Safe
Harbor ISA—Original Service
Agreement No. 3504 to be effective 1/7/
2013.
Filed Date: 2/6/13.
Accession Number: 20130206–5050.
Comments Due: 5 p.m. e.t. 2/27/13.
Docket Numbers: ER13–892–000.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
L.L.C. submits Notice of Cancellation of
Original SA No. 2711 in Dkt No. ER11–
2707–000 to be effective 1/10/2013.
VerDate Mar<15>2010
17:21 Feb 12, 2013
Jkt 229001
Filed Date: 2/6/13.
Accession Number: 20130206–5055.
Comments Due: 5 p.m. e.t. 2/27/13.
Docket Numbers: ER13–893–000.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
L.L.C. submits Notice of Cancellation of
Original SA No. 3149 -Docket No.
ER12–518–000 to be effective 1/10/
2013.
Filed Date: 2/6/13.
Accession Number: 20130206–5056.
Comments Due: 5 p.m. e.t 2/27/13.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES13–17–000.
Applicants: Northern Maine
Independent System Administrator, Inc.
Description: Application of Northern
Maine Independent System
Administrator, Inc. for Authorization to
Issue Securities Pursuant to Section 204
of the Federal Power Act.
Filed Date: 2/5/13.
Accession Number: 20130205–5178.
Comments Due: 5 p.m. e.t. 2/26/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 6, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–03301 Filed 2–12–13; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Frm 00039
Fmt 4703
Sfmt 4703
Filings Instituting Proceedings
Docket Numbers: RP13–540–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: Revisions to FM, Waiver
and Indemnification Sections to be
effective 3/6/2013.
Filed Date: 2/4/13.
Accession Number: 20130204–5130.
Comments Due: 5 p.m. e.t. 2/19/13.
Docket Numbers: RP13–541–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: 02/04/13 Negotiated
Rates—JP Morgan Ventures Corp
(HUB)—6025–89 to be effective 2/2/
2013.
Filed Date: 2/4/13.
Accession Number: 20130204–5134.
Comments Due: 5 p.m. e.t. 2/19/13.
Docket Numbers: RP13–542–000.
Applicants: Equitrans, L.P.
Description: Equitrans, L.P. submits
Petition for partial waiver of tariff to
defer Pipeline Safety Cost Tracker
update filing.
Filed Date: 2/5/13.
Accession Number: 20130205–5067.
Comments Due: 5 p.m. e.t. 2/8/13.
Docket Numbers: RP13–543–000.
Applicants: White River Hub, LLC.
Description: Sec. 6.18 Request to
Acquire Released Capacity to be
effective 3/11/2013.
Filed Date: 2/5/13.
Accession Number: 20130205–5091.
Comments Due: 5 p.m. e.t. 2/19/13.
Docket Numbers: RP13–544–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: 02/05/13 Negotiated
Rates—Sequent Energy Management
(HUB)—3075–89 to be effective 2/4/
2013.
Filed Date: 2/5/13.
Accession Number: 20130205–5094.
Comments Due: 5 p.m. e.t. 2/19/13.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
DEPARTMENT OF ENERGY
PO 00000
10165
Docket Numbers: RP13–124–003.
Applicants: Hardy Storage Company,
LLC.
Description: NAESB 2.0 Compliance
to be effective 12/1/2012.
Filed Date: 2/4/13.
Accession Number: 20130204–5137.
Comments Due: 5 p.m. e.t. 2/19/13.
E:\FR\FM\13FEN1.SGM
13FEN1
Agencies
[Federal Register Volume 78, Number 30 (Wednesday, February 13, 2013)]
[Notices]
[Pages 10164-10165]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-03301]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER12-1643-001.
Applicants: ISO New England Inc.
Description: ISO New England Inc. submits Order No. 755 Regulation
Mkt. Compliance Changes to be effective 12/31/9998.
Filed Date: 2/6/13.
Accession Number: 20130206-5047.
Comments Due: 5 p.m. e.t. 2/27/13.
Docket Numbers: ER12-2277-003.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: Midwest Independent Transmission System Operator, Inc.
submits 2013-02-05 SA 2457 G631-2-3 Term to be effective 4/6/2013.
Filed Date: 2/5/13.
Accession Number: 20130205-5158.
Comments Due: 5 p.m. e.t. 2/26/13.
Docket Numbers: ER13-886-000.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: Midwest Independent Transmission System Operator, Inc.
[[Page 10165]]
submits tariff filing per 35.13(a)(2)(iii: 02-05-2013 SA 2456
Termination Emmet Cty Energy-ITC to be effective 4/6/2013.
Filed Date: 2/5/13.
Accession Number: 20130205-5156.
Comments Due: 5 p.m. e.t. 2/26/13.
Docket Numbers: ER13-887-000.
Applicants: PJM Interconnection, L.L.C.
Description: Request for Limited Waiver of PJM Interconnection,
L.L.C.
Filed Date: 2/6/13.
Accession Number: 20130206-5015.
Comments Due: 5 p.m. e.t. 2/27/13.
Docket Numbers: ER13-888-000.
Applicants: Niagara Mohawk Power Corporation, New York Independent
System Operator, Inc.
Description: Niagara Mohawk Power Corporation submits tariff filing
per 35.13(a)(2)(iii: NYISO filing of Agreement No. 1953 between
National Grid and Erie Blvd. Hydropowr to be effective 11/9/2012.
Filed Date: 2/6/13.
Accession Number: 20130206-5040.
Comments Due: 5 p.m. e.t. 2/27/13.
Docket Numbers: ER13-889-000.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: Midwest Independent Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii: 02-05-2013 SA 2509 ITC-
Tuscola Wind E&P to be effective 2/7/2013.
Filed Date: 2/6/13.
Accession Number: 20130206-5044.
Comments Due: 5 p.m. e.t. 2/27/13.
Docket Numbers: ER13-890-000.
Applicants: PJM Interconnection, L.L.C.
Description: PJM Interconnection, L.L.C. submits Notice of
Cancellation of Original Service Agreement No. 3259 to be effective 1/
4/2013.
Filed Date: 2/6/13.
Accession Number: 20130206-5049.
Comments Due: 5 p.m. e.t. 2/27/13.
Docket Numbers: ER13-891-000.
Applicants: PJM Interconnection, L.L.C.
Description: PJM Interconnection, L.L.C. submits tariff filing per
35.13(a)(2)(iii: Non-Queue 69 Safe Harbor ISA--Original Service
Agreement No. 3504 to be effective 1/7/2013.
Filed Date: 2/6/13.
Accession Number: 20130206-5050.
Comments Due: 5 p.m. e.t. 2/27/13.
Docket Numbers: ER13-892-000.
Applicants: PJM Interconnection, L.L.C.
Description: PJM Interconnection, L.L.C. submits Notice of
Cancellation of Original SA No. 2711 in Dkt No. ER11-2707-000 to be
effective 1/10/2013.
Filed Date: 2/6/13.
Accession Number: 20130206-5055.
Comments Due: 5 p.m. e.t. 2/27/13.
Docket Numbers: ER13-893-000.
Applicants: PJM Interconnection, L.L.C.
Description: PJM Interconnection, L.L.C. submits Notice of
Cancellation of Original SA No. 3149 -Docket No. ER12-518-000 to be
effective 1/10/2013.
Filed Date: 2/6/13.
Accession Number: 20130206-5056.
Comments Due: 5 p.m. e.t 2/27/13.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES13-17-000.
Applicants: Northern Maine Independent System Administrator, Inc.
Description: Application of Northern Maine Independent System
Administrator, Inc. for Authorization to Issue Securities Pursuant to
Section 204 of the Federal Power Act.
Filed Date: 2/5/13.
Accession Number: 20130205-5178.
Comments Due: 5 p.m. e.t. 2/26/13.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 6, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-03301 Filed 2-12-13; 8:45 am]
BILLING CODE 6717-01-P