Prineville Energy Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 9687-9688 [2013-03011]

Download as PDF Federal Register / Vol. 78, No. 28 / Monday, February 11, 2013 / Notices ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERC OnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on February 22, 2013. FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on February 22, 2013. Dated: February 4, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–02932 Filed 2–8–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: February 5, 2013. Kimberly D. Bose, Secretary. [Project No. 8315–010] [FR Doc. 2013–03010 Filed 2–8–13; 8:45 am] Verso Sartell LLC, AIM Development (USA) LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. FA11–21–000] erowe on DSK2VPTVN1PROD with NOTICES North American Electric Reliability Corporation; Notice of Filing Take notice that on February 1, 2013, the North American Electric Reliability Corporation (NERC) submitted a compliance filing in accordance with the Federal Energy Regulatory Commission’s Order (FERC or Commission) in North American Electric Reliability Corporation, 141 FERC ¶ 61,086 (2012) (November 2 Order). Any person desiring to comment on this filing must file in accordance with the Commission’s Rules of Practice and Procedure. Such comments must be filed on or before the comment date. On or before the comment date, it is not necessary to serve comments on persons other than the Applicant. The Commission encourages electronic submission of comments in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the comments to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email 14:26 Feb 08, 2013 electronically, documents may be paperfiled. To paper-file, an original plus seven copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project can be viewed or printed on the eLibrary link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–8315) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Dated: February 5, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–03008 Filed 2–8–13; 8:45 am] VerDate Mar<15>2010 Jkt 229001 9687 BILLING CODE 6717–01–P On January 31, 2013, Verso Sartell LLC (transferor) and the AIM Development (USA) LLC (transferee) filed an application for the transfer of license for the Sartell Dam Project (FERC No. 8315), located on the Mississippi River in Stearns and Benton counties, Minnesota. Applicants seek Commission approval to transfer the license for the Sartell Dam Project from the transferor to the transferee. The project is currently not producing power due to the permanent closure of the Sartell Paper Mill; which was the sole recipient of project power. Transferee plans to return ability of the project to provide consumable electricity. Applicants’ Contact: Transferor: Mr. Robert C. Fallon, Esq., Leonard, Street & Deinard, PA, 1350 I Street NW., Suite 800, Washington, DC 20005, telephone (202) 346–6910. Transferee: Mr. Jeffrey L. McGlin, General Manager, AIM Development (USA) LLC, 433 N. Main Street, Kimberly, WI 54136, telephone (920) 470–1061. FERC Contact: Patricia W. Gillis (202) 502–8735, patricia.gillis@ferc.gov. Deadline for filing comments and motions to intervene: 15 days from the issuance date of this notice. Comments and motions to intervene may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1) and the instructions on the Commission’s Web site under https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. If unable to be filed Federal Energy Regulatory Commission PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY [Project No. 14453–000] Prineville Energy Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 31, 2012, Prineville Energy Storage, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Prineville Pumped Storage Project (project) to be located on Prineville Reservoir, near Prineville in Crook County, Oregon. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 40-foot-high, 6,580foot-long upper concrete-faced rockfill or roller-compacted concrete dam; (2) an upper reservoir with surface area of 57 acres, storage capacity of 2,260 acre-feet, and maximum pool elevation of 3,920 feet mean sea level (msl); (3) a 245-foothigh, 800-foot-long lower earthfill dam; (4) a lower reservoir with surface area of 3,030 acres, storage capacity of 154,700 acre-feet, and maximum pool elevation of 3,234 feet msl; (5) two, 10-footdiameter, 2,630-foot-long buried or semi-buried steel headrace conduits; (6) a 150-foot-long, 40-foot-wide, 100-foothigh underground powerhouse E:\FR\FM\11FEN1.SGM 11FEN1 erowe on DSK2VPTVN1PROD with NOTICES 9688 Federal Register / Vol. 78, No. 28 / Monday, February 11, 2013 / Notices containing three reversible pumpturbines with total installed capacity of 150 megawatts; (7) two, 11-footdiameter, 600-foot-long buried steel tailrace conduits; (8) a 15.6 to 16.2 mile, 115-kilovolt overhead transmission line extending from the powerhouse to either: (i) the Pacific Direct Current Intertie (PDCI) line and then running parallel to the PDCI to the Ponderosa substation, or (ii) the Bonneville Power Administration (BPA) existing transmission line corridor and then running parallel to the BPA line to the Ponderosa substation; and (9) appurtenant facilities. The estimated annual generation of the project would be 394 gigawatt-hours. Applicant Contact: Mr. Matthew Shapiro, Chief Executive Officer, Prineville Energy Storage, LLC, 1210 W. Franklin Street, Ste. 2, Boise, Idaho 83702; phone: (208) 246–9925. FERC Contact: John Matkowski; phone: (202) 502–8576. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14453) in the docket number field to access the document. For assistance, contact FERC Online Support. VerDate Mar<15>2010 14:26 Feb 08, 2013 Jkt 229001 Dated: February 5, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–03011 Filed 2–8–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Docket No. ER13–367–000, Southwest Power Pool, Inc. For more information, contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 288–6738 or Luciano.Lima@ferc.gov. Dated: February 4, 2013. Kimberly D. Bose, Secretary. Federal Energy Regulatory Commission [FR Doc. 2013–02931 Filed 2–8–13; 8:45 am] Notice of Commission Staff Attendance BILLING CODE 6717–01–P The Federal Energy Regulatory Commission hereby gives notice that members of the Commission’s staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP Seams FERC Order 1000 Task Force Meeting—February 5, 2013 The above-referenced meeting will be a teleconference and is open to the public. Further information may be found at www.spp.org. The discussions at the meeting described above may address matters at issue in the following proceedings: Docket No. ER09–35–001, Tallgrass Transmission, LLC Docket No. ER09–36–001, Prairie Wind Transmission, LLC Docket No. ER09–548–001, ITC Great Plains, LLC Docket No. ER09–659–002, Southwest Power Pool, Inc. Docket No. ER11–4105–000, Southwest Power Pool, Inc. Docket No. EL11–34–001, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–1401–000, Southwest Power Pool, Inc. Docket No. ER12–1402–000, Southwest Power Pool, Inc. Docket No. ER12–1415–000, Southwest Power Pool, Inc. Docket No. ER12–1460–000, Southwest Power Pool, Inc. Docket No. ER12–1586–000 et al., Southwest Power Pool, Inc. Docket No. ER12–1610–000, Southwest Power Pool, Inc. Docket No. ER12–1772–000, Southwest Power Pool, Inc. Docket No. ER12–2366–000, Southwest Power Pool, Inc. Docket No. EL12–2–000, Southwest Power Pool, Inc. Docket No. EL12–60–000, Southwest Power Pool, Inc., et al. Docket No. ER12–2387–000 et al., Southwest Power Pool, Inc. Docket No. ER13–366–000, Southwest Power Pool, Inc. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2010–0539; FRL–9377–9] Pesticides; Draft Guidance for Pesticide Registrants on Antimicrobial Pesticide Products With Mold-Related Label Claims; Notice of Availability; Extension of Comment Period Environmental Protection Agency (EPA). ACTION: Notice; extension of comment period. AGENCY: EPA issued a draft Pesticide Registration (PR) notice in the Federal Register issue of December 12, 2012, requesting comments on Guidance for Antimicrobial Pesticide Products with Mold-Related Label Claims. This document extends the comment period for 60 days, from February 11, 2013 to April 12, 2013. DATES: Comments, identified by docket identification (ID) number EPA–HQ– OPP–2010–0539 must be received on or before April 12, 2013. ADDRESSES: Follow the detailed instructions as provided under ADDRESSES in the Federal Register document of December 12, 2012. FOR FURTHER INFORMATION CONTACT: Melba S. Morrow, Antimicrobials Division (7510P), Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Ave. NW., Washington, DC 20460–0001; telephone number: (703) 308–2716; email address: morrow.melba@epa.gov. SUPPLEMENTARY INFORMATION: This document extends the public comment period established in the Federal Register issue of December 12, 2012 (77 FR 74003) (FRL–9362–3). In that document, EPA requested comment on a draft PR notice that provided guidance for antimicrobial pesticide products with mold-related claims. In response to comments from stakesholders requesting additional time to comment, EPA is hereby extending the comment period. The comment period, which was SUMMARY: E:\FR\FM\11FEN1.SGM 11FEN1

Agencies

[Federal Register Volume 78, Number 28 (Monday, February 11, 2013)]
[Notices]
[Pages 9687-9688]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-03011]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14453-000]


Prineville Energy Storage, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On August 31, 2012, Prineville Energy Storage, LLC, filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Prineville Pumped Storage Project (project) to be located on Prineville 
Reservoir, near Prineville in Crook County, Oregon. The sole purpose of 
a preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of the following: (1) A 40-foot-
high, 6,580-foot-long upper concrete-faced rockfill or roller-compacted 
concrete dam; (2) an upper reservoir with surface area of 57 acres, 
storage capacity of 2,260 acre-feet, and maximum pool elevation of 
3,920 feet mean sea level (msl); (3) a 245-foot-high, 800-foot-long 
lower earthfill dam; (4) a lower reservoir with surface area of 3,030 
acres, storage capacity of 154,700 acre-feet, and maximum pool 
elevation of 3,234 feet msl; (5) two, 10-foot-diameter, 2,630-foot-long 
buried or semi-buried steel headrace conduits; (6) a 150-foot-long, 40-
foot-wide, 100-foot-high underground powerhouse

[[Page 9688]]

containing three reversible pump-turbines with total installed capacity 
of 150 megawatts; (7) two, 11-foot-diameter, 600-foot-long buried steel 
tailrace conduits; (8) a 15.6 to 16.2 mile, 115-kilovolt overhead 
transmission line extending from the powerhouse to either: (i) the 
Pacific Direct Current Intertie (PDCI) line and then running parallel 
to the PDCI to the Ponderosa substation, or (ii) the Bonneville Power 
Administration (BPA) existing transmission line corridor and then 
running parallel to the BPA line to the Ponderosa substation; and (9) 
appurtenant facilities. The estimated annual generation of the project 
would be 394 gigawatt-hours.
    Applicant Contact: Mr. Matthew Shapiro, Chief Executive Officer, 
Prineville Energy Storage, LLC, 1210 W. Franklin Street, Ste. 2, Boise, 
Idaho 83702; phone: (208) 246-9925.
    FERC Contact: John Matkowski; phone: (202) 502-8576.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14453) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: February 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-03011 Filed 2-8-13; 8:45 am]
BILLING CODE 6717-01-P