Combined Notice of Filings #1, 8121-8122 [2013-02496]
Download as PDF
Federal Register / Vol. 78, No. 24 / Tuesday, February 5, 2013 / Notices
Demarcation Agreement to be effective
12/28/2012.
Filed Date: 1/28/13.
Accession Number: 20130128–5234.
Comments Due: 5 p.m. ET 2/19/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 29, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–02494 Filed 2–4–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
tkelley on DSK3SPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2566–004;
ER10–1760–004.
Applicants: Duke Energy Carolinas,
LLC, Carolina Power & Light Company.
Description: Notice of Change in
Status filing of Duke Energy Carolinas,
LLC, et al.
Filed Date: 1/29/13.
Accession Number: 20130129–5121.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–736–001.
Applicants: Niagara Mohawk Power
Corporation, New York Independent
System Operator, Inc.
Description: Niagara Mohawk Power
Corporation submits tariff filing per
35.17(b): Correction to LGIA No. 1145
between National Grid and AG Energy
to be effective 6/8/2012.
Filed Date: 1/29/13.
Accession Number: 20130129–5128.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–739–000;
ER13–739–001.
VerDate Mar<15>2010
17:18 Feb 04, 2013
Jkt 229001
Applicants: Texpo Power, LP.
Description: Texpo Power, LP submits
second supplemental submission to the
January 10 and 23, 2013 filings.
Filed Date: 1/29/13.
Accession Number: 20130129–5108.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–740–000;
ER13–740–001.
Applicants: EnerPenn USA LLC.
Description: EnerPenn USA LLC
submits second supplemental
submission to the January 10 and 23,
2013 filings.
Filed Date: 1/29/13.
Accession Number: 20130129–5109.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–814–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Notice of CancellationOriginal SA No. 2858 in Dkt No. ER11–
3515–000 to be effective 12/31/2012.
Filed Date: 1/29/13.
Accession Number: 20130129–5032.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–815–000.
Applicants: Tiverton Power Inc.
Description: Tiverton Power Inc.
submits tariff filing per 35.13(a)(2)(iii:
Notice of Succession to be effective 1/
18/2013.
Filed Date: 1/29/13.
Accession Number: 20130129–5044.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–816–000.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
L.L.C. submits tariff filing per
35.13(a)(2)(iii: Original Service
Agreement No. 3480; Queue No. W1–
107 to be effective 1/3/2013.
Filed Date: 1/29/13.
Accession Number: 20130129–5051.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–817–000.
Applicants: MATL LLP.
Description: MATL LLP submits tariff
filing per 35.1: MATL Enbridge Baseline
Filing to be effective 1/29/2013.
Filed Date: 1/29/13.
Accession Number: 20130129–5052.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–818–000.
Applicants: Niagara Mohawk Power
Corporation, New York Independent
System Operator, Inc.
Description: Niagara Mohawk Power
Corporation submits tariff filing per
35.13(a)(2)(iii: Cost Reimbursement
Agreement No. 1951 NYPA/NiMo re: mv
trnsmssn fclts to be effective 11/9/2012.
Filed Date: 1/29/13.
Accession Number: 20130129–5084.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–819–000.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
8121
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits tariff filing per
35.13(a)(2)(iii: Revised Added Facilities
Rate for Tie-Line Agreements to be
effective 1/1/2013.
Filed Date: 1/29/13.
Accession Number: 20130129–5088.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–820–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits tariff filing per
35.13(a)(2)(iii: Revisions to Attachment
AO—Agreement Establishing External
Generation to be effective 3/30/2013.
Filed Date: 1/29/13.
Accession Number: 20130129–5091.
Comments Due: 5 p.m. ET 2/19/13.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA12–4–000.
Applicants: Spring Canyon Energy
LLC, Judith Gap Energy LLC, Invenergy
TN LLC, Wolverine Creek Energy LLC,
Grays Harbor Energy LLC, Forward
Energy LLC, Willow Creek Energy LLC,
Sheldon Energy LLC, Hardee Power
Partners Limited, Spindle Hill Energy
LLC, Invenergy Cannon Falls LLC,
Beech Ridge Energy LLC, Grand Ridge
Energy LLC, Grand Ridge Energy II LLC,
Grand Ridge Energy III LLC, Grand
Ridge Energy IV LLC, Grand Ridge
Energy V LLC, Vantage Wind Energy
LLC, Stony Creek Energy LLC, Gratiot
County Wind LLC, Gratiot County Wind
II LLC, Bishop Hill Energy LLC, Bishop
Hill Energy III LLC and California Ridge
Wind Energy LLC.
Description: Generation Site Report
Fourth Quarter 2012 of Spring Canyon
Energy LLC, et al.
Filed Date: 1/29/13.
Accession Number: 20130129–5068.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: LA12–4–000.
Applicants: Iberdrola Renewables,
LLC, Atlantic Renewable Projects II
LLC, Barton Windpower LLC, Big Horn
Wind Project LLC, Big Horn II Wind
Project LLC, Blue Creek Wind Farm
LLC, Buffalo Ridge I LLC, Buffalo Ridge
II LLC, Casselman Windpower LLC,
Colorado Green Holdings LLC, Dillon
Wind LLC, Dry Lake Wind Power, LLC,
Dry Lake Wind Power II LLC, Elk River
Windfarm, LLC, Elm Creek Wind, LLC,
Elm Creek Wind II LLC, Farmers City
Wind, LLC, Flat Rock Windpower LLC,
Flat Rock Windpower II LLC, Flying
Cloud Power Partners, LLC, Groton
Wind, LLC, Hardscrabble Wind Power
LLC, Hay Canyon Wind LLC, Juniper
Canyon Wind Power LLC, Klamath
E:\FR\FM\05FEN1.SGM
05FEN1
8122
Federal Register / Vol. 78, No. 24 / Tuesday, February 5, 2013 / Notices
Energy LLC, Klamath Generation LLC,
Klondike Wind Power LLC, Klondike
Wind Power II LLC, Klondike Wind
Power III LLC, Leaning Juniper Wind
Power II LLC, Lempster Wind, LLC,
Locust Ridge Wind Farm, LLC, Locust
Ridge II, LLC, Manzana Wind LLC,
MinnDakota Wind LLC, Moraine Wind
LLC, Moraine Wind II LLC, Mountain
View Power Partners III, LLC, New
England Wind, LLC, New Harvest Wind
Project LLC, Northern Iowa Windpower
II LLC, Pebble Springs Wind LLC,
Providence Heights Wind, LLC, Rugby
Wind LLC, San Luis Solar LLC, Shiloh
I Wind Project, LLC, South Chestnut
LLC, Star Point Wind Project LLC,
Streator-Cayuga Ridge Wind Power LLC,
Trimont Wind I LLC, Twin Buttes Wind
LLC.
Description: Quarterly Land
Acquisition Report of Iberdrola
Renewables, LLC, et al.
Filed Date: 1/29/13.
Accession Number: 20130129–5089.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: LA12–4–000.
Applicants: Southern Company
Services, Inc., Alabama Power
Company, Georgia Power Company,
Gulf Power Company, Mississippi
Power Company, Southern Power
Company.
Description: Quarterly Land
Acquisition Report of Southern
Company Services, Inc.
Filed Date: 1/29/13.
Accession Number: 20130129–5090.
Comments Due: 5 p.m. ET 2/19/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 29, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
the D.C. Circuit Court ruled that budgets
in submitted SIPs cannot be used for
conformity determinations until EPA
has affirmatively found them adequate.
As a result of our finding, the State of
Connecticut can use the MOVES2010
motor vehicle emissions budgets from
the submitted plan for future conformity
determinations for the Connecticut
portion of the New York-Northern New
Jersey-Long Island, NY-NJ-CT PM2.5
area.
These motor vehicle emissions
budgets are effective February 20, 2013.
DATES:
FOR FURTHER INFORMATION CONTACT:
[FR Doc. 2013–02496 Filed 2–4–13; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–R01–OAR–2013–0020; A–1–FRL–
9776–2]
Adequacy Status of Motor Vehicle
Emission Budgets for Transportation
Conformity Purposes; Connecticut
Environmental Protection
Agency (EPA).
ACTION: Notice of adequacy.
AGENCY:
In this notice, EPA is
notifying the public that EPA has found
that the 2017 and 2025 motor vehicle
emissions budgets (MVEBs) in the June
22, 2012 Connecticut State
Implementation Plan (SIP) revision are
adequate for transportation conformity
purposes. The submittal includes
MOVES2010 motor vehicle emissions
budgets for 2017 and 2025 for the
Connecticut portion of the New YorkNorthern New Jersey-Long Island, NYNJ-CT fine particle (PM2.5)
nonattainment area. On March 2, 1999,
SUMMARY:
Donald O. Cooke, Environmental
Scientist, Air Quality Planning Unit,
U.S. Environmental Protection Agency,
EPA New England Regional Office, Five
Post Office Square, Suite 100 (CAQ),
Boston, MA 02109–3912, (617) 918–
1668, cooke.donald@epa.gov.
SUPPLEMENTARY INFORMATION:
Throughout this document, whenever
‘‘we,’’ ‘‘us’’ or ‘‘our’’ is used, we mean
EPA.
Today’s notice is simply an
announcement of a finding that we have
already made. EPA New England sent a
letter to Connecticut Department of
Energy and Environmental Protection
on January 8, 2013, stating that the 2017
and 2025 MOVES2010 motor vehicle
emissions budgets in the June 22, 2012
State Implementation Plan (SIP) are
adequate for transportation conformity
purposes. This finding will also be
announced on EPA’s conformity Web
site: https://www.epa.gov/otaq/state
resources/transconf/adequacy.htm,
(once there, click on ‘‘What SIP
submissions has EPA already found
adequate or inadequate?’’). The
adequate motor vehicle emissions
budgets (MVEBs) are provided in the
following table:
ADEQUATE MOTOR VEHICLE EMISSIONS BUDGETS
Direct PM2.5
(tons per year)
tkelley on DSK3SPTVN1PROD with NOTICES
Year 2017 MVEBs for the Connecticut Portion of the New York-Northern New Jersey-Long Island,
NY-NJ-CT 1997 annual PM2.5 and 2006 24-hour PM2.5 Area ...............................................................
Year 2025 MVEBs for the Connecticut Portion of the New York-Northern New Jersey-Long Island,
NY-NJ-CT 1997 annual PM2.5 and 2006 24-hour PM2.5 Area ...............................................................
Transportation conformity is required
by section 176(c) of the Clean Air Act.
EPA’s conformity rule requires that
transportation plans, programs, and
projects conform to state air quality
implementation plans and establishes
the criteria and procedures for
determining whether or not they do
conform. Conformity to a SIP means that
VerDate Mar<15>2010
17:18 Feb 04, 2013
Jkt 229001
transportation activities will not
produce new air quality violations,
worsen existing violations, or delay
timely attainment of the national
ambient air quality standards.
The criteria by which we determine
whether a SIP’s motor vehicle emission
budgets are adequate for conformity
purposes are outlined in 40 CFR
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
575.8
516
NOX
(tons per year)
12,791.8
9,728.1
93.118(e)(4). Please note that an
adequacy review is separate from EPA’s
completeness review, and it also should
not be used to prejudge EPA’s ultimate
approval of the SIP. Even if we find a
budget adequate, the SIP could later be
disapproved.
We have described our process for
determining the adequacy of submitted
E:\FR\FM\05FEN1.SGM
05FEN1
Agencies
[Federal Register Volume 78, Number 24 (Tuesday, February 5, 2013)]
[Notices]
[Pages 8121-8122]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-02496]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2566-004; ER10-1760-004.
Applicants: Duke Energy Carolinas, LLC, Carolina Power & Light
Company.
Description: Notice of Change in Status filing of Duke Energy
Carolinas, LLC, et al.
Filed Date: 1/29/13.
Accession Number: 20130129-5121.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13-736-001.
Applicants: Niagara Mohawk Power Corporation, New York Independent
System Operator, Inc.
Description: Niagara Mohawk Power Corporation submits tariff filing
per 35.17(b): Correction to LGIA No. 1145 between National Grid and AG
Energy to be effective 6/8/2012.
Filed Date: 1/29/13.
Accession Number: 20130129-5128.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13-739-000; ER13-739-001.
Applicants: Texpo Power, LP.
Description: Texpo Power, LP submits second supplemental submission
to the January 10 and 23, 2013 filings.
Filed Date: 1/29/13.
Accession Number: 20130129-5108.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13-740-000; ER13-740-001.
Applicants: EnerPenn USA LLC.
Description: EnerPenn USA LLC submits second supplemental
submission to the January 10 and 23, 2013 filings.
Filed Date: 1/29/13.
Accession Number: 20130129-5109.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13-814-000.
Applicants: PJM Interconnection, L.L.C.
Description: Notice of Cancellation-Original SA No. 2858 in Dkt No.
ER11-3515-000 to be effective 12/31/2012.
Filed Date: 1/29/13.
Accession Number: 20130129-5032.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13-815-000.
Applicants: Tiverton Power Inc.
Description: Tiverton Power Inc. submits tariff filing per
35.13(a)(2)(iii: Notice of Succession to be effective 1/18/2013.
Filed Date: 1/29/13.
Accession Number: 20130129-5044.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13-816-000.
Applicants: PJM Interconnection, L.L.C.
Description: PJM Interconnection, L.L.C. submits tariff filing per
35.13(a)(2)(iii: Original Service Agreement No. 3480; Queue No. W1-107
to be effective 1/3/2013.
Filed Date: 1/29/13.
Accession Number: 20130129-5051.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13-817-000.
Applicants: MATL LLP.
Description: MATL LLP submits tariff filing per 35.1: MATL Enbridge
Baseline Filing to be effective 1/29/2013.
Filed Date: 1/29/13.
Accession Number: 20130129-5052.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13-818-000.
Applicants: Niagara Mohawk Power Corporation, New York Independent
System Operator, Inc.
Description: Niagara Mohawk Power Corporation submits tariff filing
per 35.13(a)(2)(iii: Cost Reimbursement Agreement No. 1951 NYPA/NiMo
re: mv trnsmssn fclts to be effective 11/9/2012.
Filed Date: 1/29/13.
Accession Number: 20130129-5084.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13-819-000.
Applicants: Southern California Edison Company.
Description: Southern California Edison Company submits tariff
filing per 35.13(a)(2)(iii: Revised Added Facilities Rate for Tie-Line
Agreements to be effective 1/1/2013.
Filed Date: 1/29/13.
Accession Number: 20130129-5088.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13-820-000.
Applicants: Southwest Power Pool, Inc.
Description: Southwest Power Pool, Inc. submits tariff filing per
35.13(a)(2)(iii: Revisions to Attachment AO--Agreement Establishing
External Generation to be effective 3/30/2013.
Filed Date: 1/29/13.
Accession Number: 20130129-5091.
Comments Due: 5 p.m. ET 2/19/13.
Take notice that the Commission received the following land
acquisition reports:
Docket Numbers: LA12-4-000.
Applicants: Spring Canyon Energy LLC, Judith Gap Energy LLC,
Invenergy TN LLC, Wolverine Creek Energy LLC, Grays Harbor Energy LLC,
Forward Energy LLC, Willow Creek Energy LLC, Sheldon Energy LLC, Hardee
Power Partners Limited, Spindle Hill Energy LLC, Invenergy Cannon Falls
LLC, Beech Ridge Energy LLC, Grand Ridge Energy LLC, Grand Ridge Energy
II LLC, Grand Ridge Energy III LLC, Grand Ridge Energy IV LLC, Grand
Ridge Energy V LLC, Vantage Wind Energy LLC, Stony Creek Energy LLC,
Gratiot County Wind LLC, Gratiot County Wind II LLC, Bishop Hill Energy
LLC, Bishop Hill Energy III LLC and California Ridge Wind Energy LLC.
Description: Generation Site Report Fourth Quarter 2012 of Spring
Canyon Energy LLC, et al.
Filed Date: 1/29/13.
Accession Number: 20130129-5068.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: LA12-4-000.
Applicants: Iberdrola Renewables, LLC, Atlantic Renewable Projects
II LLC, Barton Windpower LLC, Big Horn Wind Project LLC, Big Horn II
Wind Project LLC, Blue Creek Wind Farm LLC, Buffalo Ridge I LLC,
Buffalo Ridge II LLC, Casselman Windpower LLC, Colorado Green Holdings
LLC, Dillon Wind LLC, Dry Lake Wind Power, LLC, Dry Lake Wind Power II
LLC, Elk River Windfarm, LLC, Elm Creek Wind, LLC, Elm Creek Wind II
LLC, Farmers City Wind, LLC, Flat Rock Windpower LLC, Flat Rock
Windpower II LLC, Flying Cloud Power Partners, LLC, Groton Wind, LLC,
Hardscrabble Wind Power LLC, Hay Canyon Wind LLC, Juniper Canyon Wind
Power LLC, Klamath
[[Page 8122]]
Energy LLC, Klamath Generation LLC, Klondike Wind Power LLC, Klondike
Wind Power II LLC, Klondike Wind Power III LLC, Leaning Juniper Wind
Power II LLC, Lempster Wind, LLC, Locust Ridge Wind Farm, LLC, Locust
Ridge II, LLC, Manzana Wind LLC, MinnDakota Wind LLC, Moraine Wind LLC,
Moraine Wind II LLC, Mountain View Power Partners III, LLC, New England
Wind, LLC, New Harvest Wind Project LLC, Northern Iowa Windpower II
LLC, Pebble Springs Wind LLC, Providence Heights Wind, LLC, Rugby Wind
LLC, San Luis Solar LLC, Shiloh I Wind Project, LLC, South Chestnut
LLC, Star Point Wind Project LLC, Streator-Cayuga Ridge Wind Power LLC,
Trimont Wind I LLC, Twin Buttes Wind LLC.
Description: Quarterly Land Acquisition Report of Iberdrola
Renewables, LLC, et al.
Filed Date: 1/29/13.
Accession Number: 20130129-5089.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: LA12-4-000.
Applicants: Southern Company Services, Inc., Alabama Power Company,
Georgia Power Company, Gulf Power Company, Mississippi Power Company,
Southern Power Company.
Description: Quarterly Land Acquisition Report of Southern Company
Services, Inc.
Filed Date: 1/29/13.
Accession Number: 20130129-5090.
Comments Due: 5 p.m. ET 2/19/13.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 29, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-02496 Filed 2-4-13; 8:45 am]
BILLING CODE 6717-01-P