Download as PDF Federal Register / Vol. 78, No. 24 / Tuesday, February 5, 2013 / Notices Dated: January 16, 2013. Eric P. Summa, Chief, Environmental Branch. DEPARTMENT OF DEFENSE DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers Cancellation of the Notice of Intent To Prepare a Draft and Final Supplemental Environmental Impact Statement for Reach 1B, C, and D on the Herbert Hoover Dike Major Rehabilitation Project, Martin and Palm Beach Counties Department of the Army, U.S. Army Corps of Engineers, DOD. AGENCY: Notice; cancellation. The Jacksonville District, U.S. Army Corps of Engineers (USACE) hereby cancels its Notice of Intent (NOI) to prepare a Supplemental Environmental Impact Statement (SEIS) for Reach 1B, C, and D on the HHD Major Rehabilitation Project, as published in the Federal Register, July 28, 2009 (74 FR 37190). The cancellation of the subject SEIS is necessitated due to a change in scope of the rehabilitation project. The initial focus of the HHD Major Rehabilitation Report (MRR) from 2000 divided the 143 miles dike into eight Reaches with the initial focus on Reach 1. This Reach by Reach approach is being replaced with a system-wide risk reduction approach as required for safety modifications to dams. SUMMARY: FOR FURTHER INFORMATION CONTACT: Questions may be forwarded to Ms. Angela Dunn, Environmental Branch, Planning Division, Jacksonville District, Corps of Engineers, Post Office Box 4970, Jacksonville, FL 32232–0019, Phone: 904–232–2108. The supplemental MRR will be replaced with a system-wide Dam Safety Modification (DSM) Report. Environmental documentation will be prepared and coordinated in conjunction with the system wide DSM Report as required by the National Environmental Policy Act. tkelley on DSK3SPTVN1PROD with NOTICES SUPPLEMENTARY INFORMATION: Federal Energy Regulatory Commission Cancellation of the Notice of Intent To Prepare a Draft and Final Supplemental Environmental Impact Statement for Reaches 2 and 3 on the Herbert Hoover Dike Major Rehabilitation Project, Palm Beach and Glades Counties, FL BILLING CODE 3720–58–P DEPARTMENT OF ENERGY Department of the Army; Corps of Engineers [FR Doc. 2013–02459 Filed 2–4–13; 8:45 am] ACTION: Combined Notice of Filings Department of the Army, U.S. Army Corps of Engineers, DOD. Docket Numbers: RP13–459–000. Applicants: Trailblazer Pipeline Company LLC. Description: 4Q 2012 Penalty Credit Revenue Report. Filed Date: 1/22/13. Accession Number: 20130122–5241. Comments Due: 5 p.m. ET 2/4/13. Docket Numbers: RP13–473–000. Applicants: Algonquin Gas Transmission, LLC. Description: Secondary Scheduling Priorities to be effective 4/1/2013. Filed Date: 1/24/13. Accession Number: 20130124–5072. Comments Due: 5 p.m. ET 2/5/13. Docket Numbers: RP13–474–000. Applicants: Iroquois Gas Transmission System, L.P. Description: 01/24/13 Negotiated Rates—Sequent Energy Management (HUB) 3075–89 to be effective 1/23/ 2013. Filed Date: 1/24/13. Accession Number: 20130124–5104. Comments Due: 5 p.m. ET 2/5/13. Docket Numbers: RP13–475–000. Applicants: Iroquois Gas Transmission System, L.P. Description: 01/24/13 Negotiated Rates—United Energy Trading (HUB) 5095–89 to be effective 1/23/2013. Filed Date: 1/24/13. Accession Number: 20130124–5106. Comments Due: 5 p.m. ET 2/5/13. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. AGENCY: ACTION: Notice; cancellation. The Jacksonville District, U.S. Army Corps of Engineers (USACE) hereby cancels its Notice of Intent (NOI) to prepare a Supplemental Environmental Impact Statement (SEIS) for Reaches 2 and 3 on the HHD Major Rehabilitation Project, as published in the Federal Register, August 9, 2006 (71 FR 45539). The USACE issued an NOA for the Draft SEIS on December 22, 2006 (71 FR 77013). A public meeting was held in Clewiston on January 10, 2007 to present the Draft SEIS. The USACE issued a second NOI, published in the Federal Register, August 31, 2009 (74 FR 44828), due to a revision to the preferred alternative discussed and coordinated in the December 2006 Draft SEIS. The cancellation of the subject SEIS is necessitated due to a change in scope of the rehabilitation project. The initial focus of the HHD Major Rehabilitation Report (MRR) from 2000 divided the 143 miles dike into eight Reaches with the initial focus on Reach 1. This Reach by Reach approach is being replaced with a system wide risk reduction approach as required for safety modifications to dams. SUMMARY: FOR FURTHER INFORMATION CONTACT: Questions may be forwarded to Ms. Angela Dunn, Environmental Branch, Planning Division, Jacksonville District, Corps of Engineers, Post Office Box 4970, Jacksonville, FL 32232–0019, Phone: 904–232–2108. The supplemental MRR will be replaced with a system wide Dam Safety Modification (DSM) Report. Environmental documentation will be prepared and coordinated in conjunction with the system wide DSM Report. SUPPLEMENTARY INFORMATION: Dated: January 16, 2013. Eric P. Summa, Chief, Environmental Branch. Dated: January 16, 2013. Eric P. Summa, Chief, Environmental Branch. [FR Doc. 2013–02460 Filed 2–4–13; 8:45 am] [FR Doc. 2013–02458 Filed 2–4–13; 8:45 am] BILLING CODE 3720–58–P BILLING CODE 3720–58–P VerDate Mar<15>2010 17:18 Feb 04, 2013 8119 Jkt 229001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Filings in Existing Proceedings Docket Numbers: RP13–110–001. Applicants: Discovery Gas Transmission LLC. Description: NAESB V2.0—2nd Compliance to be effective 12/1/2012. Filed Date: 1/24/13. Accession Number: 20130124–5100. Comments Due: 5 p.m. ET 2/5/13. Any person desiring to protest in any the above proceedings must file in E:\FR\FM\05FEN1.SGM 05FEN1 8120 Federal Register / Vol. 78, No. 24 / Tuesday, February 5, 2013 / Notices accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, and service can be found at: https:// www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated January 25, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–02493 Filed 2–4–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission tkelley on DSK3SPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2331–018; ER10–2343–018; ER10–2319–017; ER10– 2320–017; ER10–2317–016; ER10–2322– 018; ER10–2324–017; ER10–2325–016; ER10–2332–017; ER10–2326–018; ER10– 2327–019; ER10–2328–017; ER11–4609– 016; ER10–2330–018. Applicants: J.P. Morgan Ventures Energy Corporation, J.P. Morgan Commodities Canada Corporation, BE Alabama LLC, BE Allegheny LLC, BE CA LLC, BE Ironwood LLC, BE KJ LLC, BE Louisiana LLC, BE Rayle LLC, Cedar Brakes I, L.L.C., Cedar Brakes II, L.L.C., Central Power & Lime LLC, Triton Power Michigan LLC, Utility Contract Funding, L.L.C. Description: JPMorgan Sellers Notice of Non-Material Change in Status re: Canadian Hills Wind, LLC. Filed Date: 1/28/13. Accession Number: 20130128–5245. Comments Due: 5 p.m. ET 2/19/13. Docket Numbers: ER12–540–004; ER12–539–004; ER10–1414–003; ER11– 1881–005; ER10–3166–003; ER12–2159– 002; ER11–1890–005; ER11–1882–005; ER10–1821–004; ER10–1346–004; ER10– 1406–004; ER10–1348–004; ER12–2205– 003; ER11–1883–005; ER11–2534–004; ER11–1885–005; ER10–1416–004; ER11– 1892–005; ER11–1886–005; ER11–4475– 004; ER11–1893–005; ER11–1887–005; ER11–1889–005; ER11–1894–005. Applicants: APDC, Inc., Goshen Phase II LLC, Atlantic Power Energy Services VerDate Mar<15>2010 17:18 Feb 04, 2013 Jkt 229001 (US) LLC, Auburndale Power Partners, Limited Partnership, Burley Butte Wind Park, LLC, Cadillac Renewable Energy, LLC, Canadian Hills Wind, LLC, Camp Reed Wind Park, LLC, Golden Valley Wind Park, LLC, Frederickson Power LP, Lake Cogen, Ltd., Manchief Power Company LLC, Meadow Creek Project Company LLC, Milner Dam Wind Park, LLC, Morris Cogeneration, LLC, Oregon Trail Wind Park, LLC, Pasco Cogen, Ltd., Payne’s Ferry Wind Park, LLC, Pilgrim Stage Station Wind Park, LLC, Rockland Wind Farm LLC, Salmon Falls Wind Park, LLC, Thousand Springs Wind Park, LLC, Tuana Gulch Wind Park, LLC, Yahoo Creek Wind Park, LLC. Description: Notice of Non-Material Change in Status of APDC, Inc., et al. Filed Date: 1/28/13. Accession Number: 20130128–5273. Comments Due: 5 p.m. ET 2/19/13. Docket Numbers: ER13–353–002. Applicants: Alcoa Power Generating Inc. Description: Executed APGI–SMT IA for eTariff to be effective 1/28/2013. Filed Date: 1/28/13. Accession Number: 20130128–5083. Comments Due: 5 p.m. ET 2/19/13. Docket Numbers: ER13–355–002. Applicants: Alcoa Power Generating Inc. Description: Executed APGI–TVA IA for eTariff to be effective 1/28/2013. Filed Date: 1/28/13. Accession Number: 20130128–5086. Comments Due: 5 p.m. ET 2/19/13. Docket Numbers: ER13–772–000. Applicants: NorthWestern Corporation. Description: SA 576—WKN Montana II LGIA—1st Revised, Amended Update to Redline to be effective N/A. Filed Date: 1/28/13. Accession Number: 20130128–5000. Comments Due: 5 p.m. ET 2/19/13. Docket Numbers: ER13–804–000. Applicants: Florida Power Corporation. Description: Revised Rate Schedule No. 218 of Florida Power Corporation to be effective 3/29/2013. Filed Date: 1/28/13. Accession Number: 20130128–5057. Comments Due: 5 p.m. ET 2/19/13. Docket Numbers: ER13–805–000. Applicants: Duke Energy Carolinas, LLC. Description: NCEMC NITSA Amendment (2013) to be effective 1/1/ 2013. Filed Date: 1/28/13. Accession Number: 20130128–5095. Comments Due: 5 p.m. ET 2/19/13. Docket Numbers: ER13–806–000. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 Applicants: PJM Interconnection, L.L.C. Description: Queue Position #W3– 032A—Original Service Agreement Nos. 3483 & 3484 to be effective 12/28/2012. Filed Date: 1/28/13. Accession Number: 20130128–5097. Comments Due: 5 p.m. ET 2/19/13. Docket Numbers: ER13–807–000. Applicants: American Transmission Systems, Incorporation, PJM Interconnection, L.L.C. Description: ATSI submits Notice of Cancellation of PJM Service Agreement No. 2814 to be effective 1/29/2013. Filed Date: 1/28/13. Accession Number: 20130128–5099. Comments Due: 5 p.m. ET 2/19/13. Docket Numbers: ER13–808–000. Applicants: PJM Interconnection, L.L.C. Description: Queue Position #X1– 108—Original Service Agreement No. 3478 to be effective 12/11/2012. Filed Date: 1/28/13. Accession Number: 20130128–5100. Comments Due: 5 p.m. ET 2/19/13. Docket Numbers: ER13–809–000. Applicants: Duke Energy Carolinas, LLC. Description: DEC OATT SA Nos. 208, 406, 447 and 448 to be effective 1/1/ 2013. Filed Date: 1/28/13. Accession Number: 20130128–5155. Comments Due: 5 p.m. ET 2/19/13. Docket Numbers: ER13–810–000. Applicants: Southern California Edison Company. Description: Amended LGIA for the El Segundo Project to be effective 1/4/ 2013. Filed Date: 1/28/13. Accession Number: 20130128–5159. Comments Due: 5 p.m. ET 2/19/13. Docket Numbers: ER13–811–000. Applicants: PacifiCorp. Description: OATT Revised Attachment S to be effective 4/1/2013. Filed Date: 1/28/13. Accession Number: 20130128–5167. Comments Due: 5 p.m. ET 2/19/13. Docket Numbers: ER13–812–000. Applicants: Meadow Creek Project Company LLC. Description: Change in Category Status in NW Region to be effective 3/ 29/2013. Filed Date: 1/28/13. Accession Number: 20130128–5204. Comments Due: 5 p.m. ET 2/19/13. Docket Numbers: ER13–813–000. Applicants: Western Massachusetts Electric Company. Description: Western Massachusetts Electric Company submits tariff filing per 35.13(a)(2)(iii: HG&E Revised Asset E:\FR\FM\05FEN1.SGM 05FEN1

Agencies

[Federal Register Volume 78, Number 24 (Tuesday, February 5, 2013)]
[Notices]
[Pages 8119-8120]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-02493]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP13-459-000.
    Applicants: Trailblazer Pipeline Company LLC.
    Description: 4Q 2012 Penalty Credit Revenue Report.
    Filed Date: 1/22/13.
    Accession Number: 20130122-5241.
    Comments Due: 5 p.m. ET 2/4/13.

    Docket Numbers: RP13-473-000.
    Applicants: Algonquin Gas Transmission, LLC.
    Description: Secondary Scheduling Priorities to be effective 4/1/
2013.
    Filed Date: 1/24/13.
    Accession Number: 20130124-5072.
    Comments Due: 5 p.m. ET 2/5/13.

    Docket Numbers: RP13-474-000.
    Applicants: Iroquois Gas Transmission System, L.P.
    Description: 01/24/13 Negotiated Rates--Sequent Energy Management 
(HUB) 3075-89 to be effective 1/23/2013.
    Filed Date: 1/24/13.
    Accession Number: 20130124-5104.
    Comments Due: 5 p.m. ET 2/5/13.

    Docket Numbers: RP13-475-000.
    Applicants: Iroquois Gas Transmission System, L.P.
    Description: 01/24/13 Negotiated Rates--United Energy Trading (HUB) 
5095-89 to be effective 1/23/2013.
    Filed Date: 1/24/13.
    Accession Number: 20130124-5106.
    Comments Due: 5 p.m. ET 2/5/13.

    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.

Filings in Existing Proceedings

    Docket Numbers: RP13-110-001.
    Applicants: Discovery Gas Transmission LLC.
    Description: NAESB V2.0--2nd Compliance to be effective 12/1/2012.
    Filed Date: 1/24/13.
    Accession Number: 20130124-5100.
    Comments Due: 5 p.m. ET 2/5/13.

    Any person desiring to protest in any the above proceedings must 
file in

[[Page 8120]]

accordance with Rule 211 of the Commission's Regulations (18 CFR 
385.211) on or before 5:00 p.m. Eastern time on the specified comment 
date.
    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, and service can be found at: 
https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other 
information, call (866) 208-3676 (toll free). For TTY, call (202) 502-
8659.

    Dated January 25, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-02493 Filed 2-4-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.