Combined Notice of Filings, 8119-8120 [2013-02493]
Download as PDF
Federal Register / Vol. 78, No. 24 / Tuesday, February 5, 2013 / Notices
Dated: January 16, 2013.
Eric P. Summa,
Chief, Environmental Branch.
DEPARTMENT OF DEFENSE
DEPARTMENT OF DEFENSE
Department of the Army; Corps of
Engineers
Cancellation of the Notice of Intent To
Prepare a Draft and Final Supplemental
Environmental Impact Statement for
Reach 1B, C, and D on the Herbert
Hoover Dike Major Rehabilitation
Project, Martin and Palm Beach
Counties
Department of the Army, U.S.
Army Corps of Engineers, DOD.
AGENCY:
Notice; cancellation.
The Jacksonville District, U.S.
Army Corps of Engineers (USACE)
hereby cancels its Notice of Intent (NOI)
to prepare a Supplemental
Environmental Impact Statement (SEIS)
for Reach 1B, C, and D on the HHD
Major Rehabilitation Project, as
published in the Federal Register, July
28, 2009 (74 FR 37190). The
cancellation of the subject SEIS is
necessitated due to a change in scope of
the rehabilitation project. The initial
focus of the HHD Major Rehabilitation
Report (MRR) from 2000 divided the
143 miles dike into eight Reaches with
the initial focus on Reach 1. This Reach
by Reach approach is being replaced
with a system-wide risk reduction
approach as required for safety
modifications to dams.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Questions may be forwarded to Ms.
Angela Dunn, Environmental Branch,
Planning Division, Jacksonville District,
Corps of Engineers, Post Office Box
4970, Jacksonville, FL 32232–0019,
Phone: 904–232–2108.
The
supplemental MRR will be replaced
with a system-wide Dam Safety
Modification (DSM) Report.
Environmental documentation will be
prepared and coordinated in
conjunction with the system wide DSM
Report as required by the National
Environmental Policy Act.
tkelley on DSK3SPTVN1PROD with NOTICES
SUPPLEMENTARY INFORMATION:
Federal Energy Regulatory
Commission
Cancellation of the Notice of Intent To
Prepare a Draft and Final Supplemental
Environmental Impact Statement for
Reaches 2 and 3 on the Herbert Hoover
Dike Major Rehabilitation Project, Palm
Beach and Glades Counties, FL
BILLING CODE 3720–58–P
DEPARTMENT OF ENERGY
Department of the Army; Corps of
Engineers
[FR Doc. 2013–02459 Filed 2–4–13; 8:45 am]
ACTION:
Combined Notice of Filings
Department of the Army, U.S.
Army Corps of Engineers, DOD.
Docket Numbers: RP13–459–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: 4Q 2012 Penalty Credit
Revenue Report.
Filed Date: 1/22/13.
Accession Number: 20130122–5241.
Comments Due: 5 p.m. ET 2/4/13.
Docket Numbers: RP13–473–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: Secondary Scheduling
Priorities to be effective 4/1/2013.
Filed Date: 1/24/13.
Accession Number: 20130124–5072.
Comments Due: 5 p.m. ET 2/5/13.
Docket Numbers: RP13–474–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: 01/24/13 Negotiated
Rates—Sequent Energy Management
(HUB) 3075–89 to be effective 1/23/
2013.
Filed Date: 1/24/13.
Accession Number: 20130124–5104.
Comments Due: 5 p.m. ET 2/5/13.
Docket Numbers: RP13–475–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: 01/24/13 Negotiated
Rates—United Energy Trading (HUB)
5095–89 to be effective 1/23/2013.
Filed Date: 1/24/13.
Accession Number: 20130124–5106.
Comments Due: 5 p.m. ET 2/5/13.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
AGENCY:
ACTION:
Notice; cancellation.
The Jacksonville District, U.S.
Army Corps of Engineers (USACE)
hereby cancels its Notice of Intent (NOI)
to prepare a Supplemental
Environmental Impact Statement (SEIS)
for Reaches 2 and 3 on the HHD Major
Rehabilitation Project, as published in
the Federal Register, August 9, 2006 (71
FR 45539). The USACE issued an NOA
for the Draft SEIS on December 22, 2006
(71 FR 77013). A public meeting was
held in Clewiston on January 10, 2007
to present the Draft SEIS.
The USACE issued a second NOI,
published in the Federal Register,
August 31, 2009 (74 FR 44828), due to
a revision to the preferred alternative
discussed and coordinated in the
December 2006 Draft SEIS.
The cancellation of the subject SEIS is
necessitated due to a change in scope of
the rehabilitation project. The initial
focus of the HHD Major Rehabilitation
Report (MRR) from 2000 divided the
143 miles dike into eight Reaches with
the initial focus on Reach 1. This Reach
by Reach approach is being replaced
with a system wide risk reduction
approach as required for safety
modifications to dams.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Questions may be forwarded to Ms.
Angela Dunn, Environmental Branch,
Planning Division, Jacksonville District,
Corps of Engineers, Post Office Box
4970, Jacksonville, FL 32232–0019,
Phone: 904–232–2108.
The
supplemental MRR will be replaced
with a system wide Dam Safety
Modification (DSM) Report.
Environmental documentation will be
prepared and coordinated in
conjunction with the system wide DSM
Report.
SUPPLEMENTARY INFORMATION:
Dated: January 16, 2013.
Eric P. Summa,
Chief, Environmental Branch.
Dated: January 16, 2013.
Eric P. Summa,
Chief, Environmental Branch.
[FR Doc. 2013–02460 Filed 2–4–13; 8:45 am]
[FR Doc. 2013–02458 Filed 2–4–13; 8:45 am]
BILLING CODE 3720–58–P
BILLING CODE 3720–58–P
VerDate Mar<15>2010
17:18 Feb 04, 2013
8119
Jkt 229001
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Filings in Existing Proceedings
Docket Numbers: RP13–110–001.
Applicants: Discovery Gas
Transmission LLC.
Description: NAESB V2.0—2nd
Compliance to be effective 12/1/2012.
Filed Date: 1/24/13.
Accession Number: 20130124–5100.
Comments Due: 5 p.m. ET 2/5/13.
Any person desiring to protest in any
the above proceedings must file in
E:\FR\FM\05FEN1.SGM
05FEN1
8120
Federal Register / Vol. 78, No. 24 / Tuesday, February 5, 2013 / Notices
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated January 25, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–02493 Filed 2–4–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
tkelley on DSK3SPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2331–018;
ER10–2343–018; ER10–2319–017; ER10–
2320–017; ER10–2317–016; ER10–2322–
018; ER10–2324–017; ER10–2325–016;
ER10–2332–017; ER10–2326–018; ER10–
2327–019; ER10–2328–017; ER11–4609–
016; ER10–2330–018.
Applicants: J.P. Morgan Ventures
Energy Corporation, J.P. Morgan
Commodities Canada Corporation, BE
Alabama LLC, BE Allegheny LLC, BE
CA LLC, BE Ironwood LLC, BE KJ LLC,
BE Louisiana LLC, BE Rayle LLC, Cedar
Brakes I, L.L.C., Cedar Brakes II, L.L.C.,
Central Power & Lime LLC, Triton
Power Michigan LLC, Utility Contract
Funding, L.L.C.
Description: JPMorgan Sellers Notice
of Non-Material Change in Status re:
Canadian Hills Wind, LLC.
Filed Date: 1/28/13.
Accession Number: 20130128–5245.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER12–540–004;
ER12–539–004; ER10–1414–003; ER11–
1881–005; ER10–3166–003; ER12–2159–
002; ER11–1890–005; ER11–1882–005;
ER10–1821–004; ER10–1346–004; ER10–
1406–004; ER10–1348–004; ER12–2205–
003; ER11–1883–005; ER11–2534–004;
ER11–1885–005; ER10–1416–004; ER11–
1892–005; ER11–1886–005; ER11–4475–
004; ER11–1893–005; ER11–1887–005;
ER11–1889–005; ER11–1894–005.
Applicants: APDC, Inc., Goshen Phase
II LLC, Atlantic Power Energy Services
VerDate Mar<15>2010
17:18 Feb 04, 2013
Jkt 229001
(US) LLC, Auburndale Power Partners,
Limited Partnership, Burley Butte Wind
Park, LLC, Cadillac Renewable Energy,
LLC, Canadian Hills Wind, LLC, Camp
Reed Wind Park, LLC, Golden Valley
Wind Park, LLC, Frederickson Power
LP, Lake Cogen, Ltd., Manchief Power
Company LLC, Meadow Creek Project
Company LLC, Milner Dam Wind Park,
LLC, Morris Cogeneration, LLC, Oregon
Trail Wind Park, LLC, Pasco Cogen,
Ltd., Payne’s Ferry Wind Park, LLC,
Pilgrim Stage Station Wind Park, LLC,
Rockland Wind Farm LLC, Salmon Falls
Wind Park, LLC, Thousand Springs
Wind Park, LLC, Tuana Gulch Wind
Park, LLC, Yahoo Creek Wind Park,
LLC.
Description: Notice of Non-Material
Change in Status of APDC, Inc., et al.
Filed Date: 1/28/13.
Accession Number: 20130128–5273.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–353–002.
Applicants: Alcoa Power Generating
Inc.
Description: Executed APGI–SMT IA
for eTariff to be effective 1/28/2013.
Filed Date: 1/28/13.
Accession Number: 20130128–5083.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–355–002.
Applicants: Alcoa Power Generating
Inc.
Description: Executed APGI–TVA IA
for eTariff to be effective 1/28/2013.
Filed Date: 1/28/13.
Accession Number: 20130128–5086.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–772–000.
Applicants: NorthWestern
Corporation.
Description: SA 576—WKN Montana
II LGIA—1st Revised, Amended Update
to Redline to be effective N/A.
Filed Date: 1/28/13.
Accession Number: 20130128–5000.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–804–000.
Applicants: Florida Power
Corporation.
Description: Revised Rate Schedule
No. 218 of Florida Power Corporation to
be effective 3/29/2013.
Filed Date: 1/28/13.
Accession Number: 20130128–5057.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–805–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: NCEMC NITSA
Amendment (2013) to be effective 1/1/
2013.
Filed Date: 1/28/13.
Accession Number: 20130128–5095.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–806–000.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Applicants: PJM Interconnection,
L.L.C.
Description: Queue Position #W3–
032A—Original Service Agreement Nos.
3483 & 3484 to be effective 12/28/2012.
Filed Date: 1/28/13.
Accession Number: 20130128–5097.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–807–000.
Applicants: American Transmission
Systems, Incorporation, PJM
Interconnection, L.L.C.
Description: ATSI submits Notice of
Cancellation of PJM Service Agreement
No. 2814 to be effective 1/29/2013.
Filed Date: 1/28/13.
Accession Number: 20130128–5099.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–808–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Queue Position #X1–
108—Original Service Agreement No.
3478 to be effective 12/11/2012.
Filed Date: 1/28/13.
Accession Number: 20130128–5100.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–809–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: DEC OATT SA Nos. 208,
406, 447 and 448 to be effective 1/1/
2013.
Filed Date: 1/28/13.
Accession Number: 20130128–5155.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–810–000.
Applicants: Southern California
Edison Company.
Description: Amended LGIA for the El
Segundo Project to be effective 1/4/
2013.
Filed Date: 1/28/13.
Accession Number: 20130128–5159.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–811–000.
Applicants: PacifiCorp.
Description: OATT Revised
Attachment S to be effective 4/1/2013.
Filed Date: 1/28/13.
Accession Number: 20130128–5167.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–812–000.
Applicants: Meadow Creek Project
Company LLC.
Description: Change in Category
Status in NW Region to be effective 3/
29/2013.
Filed Date: 1/28/13.
Accession Number: 20130128–5204.
Comments Due: 5 p.m. ET 2/19/13.
Docket Numbers: ER13–813–000.
Applicants: Western Massachusetts
Electric Company.
Description: Western Massachusetts
Electric Company submits tariff filing
per 35.13(a)(2)(iii: HG&E Revised Asset
E:\FR\FM\05FEN1.SGM
05FEN1
Agencies
[Federal Register Volume 78, Number 24 (Tuesday, February 5, 2013)]
[Notices]
[Pages 8119-8120]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-02493]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP13-459-000.
Applicants: Trailblazer Pipeline Company LLC.
Description: 4Q 2012 Penalty Credit Revenue Report.
Filed Date: 1/22/13.
Accession Number: 20130122-5241.
Comments Due: 5 p.m. ET 2/4/13.
Docket Numbers: RP13-473-000.
Applicants: Algonquin Gas Transmission, LLC.
Description: Secondary Scheduling Priorities to be effective 4/1/
2013.
Filed Date: 1/24/13.
Accession Number: 20130124-5072.
Comments Due: 5 p.m. ET 2/5/13.
Docket Numbers: RP13-474-000.
Applicants: Iroquois Gas Transmission System, L.P.
Description: 01/24/13 Negotiated Rates--Sequent Energy Management
(HUB) 3075-89 to be effective 1/23/2013.
Filed Date: 1/24/13.
Accession Number: 20130124-5104.
Comments Due: 5 p.m. ET 2/5/13.
Docket Numbers: RP13-475-000.
Applicants: Iroquois Gas Transmission System, L.P.
Description: 01/24/13 Negotiated Rates--United Energy Trading (HUB)
5095-89 to be effective 1/23/2013.
Filed Date: 1/24/13.
Accession Number: 20130124-5106.
Comments Due: 5 p.m. ET 2/5/13.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP13-110-001.
Applicants: Discovery Gas Transmission LLC.
Description: NAESB V2.0--2nd Compliance to be effective 12/1/2012.
Filed Date: 1/24/13.
Accession Number: 20130124-5100.
Comments Due: 5 p.m. ET 2/5/13.
Any person desiring to protest in any the above proceedings must
file in
[[Page 8120]]
accordance with Rule 211 of the Commission's Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern time on the specified comment
date.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, and service can be found at:
https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other
information, call (866) 208-3676 (toll free). For TTY, call (202) 502-
8659.
Dated January 25, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-02493 Filed 2-4-13; 8:45 am]
BILLING CODE 6717-01-P