Cancellation of the Notice of Intent To Prepare a Draft and Final Supplemental Environmental Impact Statement for Reach 1B, C, and D on the Herbert Hoover Dike Major Rehabilitation Project, Martin and Palm Beach Counties, 8119 [2013-02460]

Download as PDF Federal Register / Vol. 78, No. 24 / Tuesday, February 5, 2013 / Notices Dated: January 16, 2013. Eric P. Summa, Chief, Environmental Branch. DEPARTMENT OF DEFENSE DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers Cancellation of the Notice of Intent To Prepare a Draft and Final Supplemental Environmental Impact Statement for Reach 1B, C, and D on the Herbert Hoover Dike Major Rehabilitation Project, Martin and Palm Beach Counties Department of the Army, U.S. Army Corps of Engineers, DOD. AGENCY: Notice; cancellation. The Jacksonville District, U.S. Army Corps of Engineers (USACE) hereby cancels its Notice of Intent (NOI) to prepare a Supplemental Environmental Impact Statement (SEIS) for Reach 1B, C, and D on the HHD Major Rehabilitation Project, as published in the Federal Register, July 28, 2009 (74 FR 37190). The cancellation of the subject SEIS is necessitated due to a change in scope of the rehabilitation project. The initial focus of the HHD Major Rehabilitation Report (MRR) from 2000 divided the 143 miles dike into eight Reaches with the initial focus on Reach 1. This Reach by Reach approach is being replaced with a system-wide risk reduction approach as required for safety modifications to dams. SUMMARY: FOR FURTHER INFORMATION CONTACT: Questions may be forwarded to Ms. Angela Dunn, Environmental Branch, Planning Division, Jacksonville District, Corps of Engineers, Post Office Box 4970, Jacksonville, FL 32232–0019, Phone: 904–232–2108. The supplemental MRR will be replaced with a system-wide Dam Safety Modification (DSM) Report. Environmental documentation will be prepared and coordinated in conjunction with the system wide DSM Report as required by the National Environmental Policy Act. tkelley on DSK3SPTVN1PROD with NOTICES SUPPLEMENTARY INFORMATION: Federal Energy Regulatory Commission Cancellation of the Notice of Intent To Prepare a Draft and Final Supplemental Environmental Impact Statement for Reaches 2 and 3 on the Herbert Hoover Dike Major Rehabilitation Project, Palm Beach and Glades Counties, FL BILLING CODE 3720–58–P DEPARTMENT OF ENERGY Department of the Army; Corps of Engineers [FR Doc. 2013–02459 Filed 2–4–13; 8:45 am] ACTION: Combined Notice of Filings Department of the Army, U.S. Army Corps of Engineers, DOD. Docket Numbers: RP13–459–000. Applicants: Trailblazer Pipeline Company LLC. Description: 4Q 2012 Penalty Credit Revenue Report. Filed Date: 1/22/13. Accession Number: 20130122–5241. Comments Due: 5 p.m. ET 2/4/13. Docket Numbers: RP13–473–000. Applicants: Algonquin Gas Transmission, LLC. Description: Secondary Scheduling Priorities to be effective 4/1/2013. Filed Date: 1/24/13. Accession Number: 20130124–5072. Comments Due: 5 p.m. ET 2/5/13. Docket Numbers: RP13–474–000. Applicants: Iroquois Gas Transmission System, L.P. Description: 01/24/13 Negotiated Rates—Sequent Energy Management (HUB) 3075–89 to be effective 1/23/ 2013. Filed Date: 1/24/13. Accession Number: 20130124–5104. Comments Due: 5 p.m. ET 2/5/13. Docket Numbers: RP13–475–000. Applicants: Iroquois Gas Transmission System, L.P. Description: 01/24/13 Negotiated Rates—United Energy Trading (HUB) 5095–89 to be effective 1/23/2013. Filed Date: 1/24/13. Accession Number: 20130124–5106. Comments Due: 5 p.m. ET 2/5/13. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. AGENCY: ACTION: Notice; cancellation. The Jacksonville District, U.S. Army Corps of Engineers (USACE) hereby cancels its Notice of Intent (NOI) to prepare a Supplemental Environmental Impact Statement (SEIS) for Reaches 2 and 3 on the HHD Major Rehabilitation Project, as published in the Federal Register, August 9, 2006 (71 FR 45539). The USACE issued an NOA for the Draft SEIS on December 22, 2006 (71 FR 77013). A public meeting was held in Clewiston on January 10, 2007 to present the Draft SEIS. The USACE issued a second NOI, published in the Federal Register, August 31, 2009 (74 FR 44828), due to a revision to the preferred alternative discussed and coordinated in the December 2006 Draft SEIS. The cancellation of the subject SEIS is necessitated due to a change in scope of the rehabilitation project. The initial focus of the HHD Major Rehabilitation Report (MRR) from 2000 divided the 143 miles dike into eight Reaches with the initial focus on Reach 1. This Reach by Reach approach is being replaced with a system wide risk reduction approach as required for safety modifications to dams. SUMMARY: FOR FURTHER INFORMATION CONTACT: Questions may be forwarded to Ms. Angela Dunn, Environmental Branch, Planning Division, Jacksonville District, Corps of Engineers, Post Office Box 4970, Jacksonville, FL 32232–0019, Phone: 904–232–2108. The supplemental MRR will be replaced with a system wide Dam Safety Modification (DSM) Report. Environmental documentation will be prepared and coordinated in conjunction with the system wide DSM Report. SUPPLEMENTARY INFORMATION: Dated: January 16, 2013. Eric P. Summa, Chief, Environmental Branch. Dated: January 16, 2013. Eric P. Summa, Chief, Environmental Branch. [FR Doc. 2013–02460 Filed 2–4–13; 8:45 am] [FR Doc. 2013–02458 Filed 2–4–13; 8:45 am] BILLING CODE 3720–58–P BILLING CODE 3720–58–P VerDate Mar<15>2010 17:18 Feb 04, 2013 8119 Jkt 229001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Filings in Existing Proceedings Docket Numbers: RP13–110–001. Applicants: Discovery Gas Transmission LLC. Description: NAESB V2.0—2nd Compliance to be effective 12/1/2012. Filed Date: 1/24/13. Accession Number: 20130124–5100. Comments Due: 5 p.m. ET 2/5/13. Any person desiring to protest in any the above proceedings must file in E:\FR\FM\05FEN1.SGM 05FEN1

Agencies

[Federal Register Volume 78, Number 24 (Tuesday, February 5, 2013)]
[Notices]
[Page 8119]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-02460]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army; Corps of Engineers


Cancellation of the Notice of Intent To Prepare a Draft and Final 
Supplemental Environmental Impact Statement for Reach 1B, C, and D on 
the Herbert Hoover Dike Major Rehabilitation Project, Martin and Palm 
Beach Counties

AGENCY: Department of the Army, U.S. Army Corps of Engineers, DOD.

ACTION: Notice; cancellation.

-----------------------------------------------------------------------

SUMMARY: The Jacksonville District, U.S. Army Corps of Engineers 
(USACE) hereby cancels its Notice of Intent (NOI) to prepare a 
Supplemental Environmental Impact Statement (SEIS) for Reach 1B, C, and 
D on the HHD Major Rehabilitation Project, as published in the Federal 
Register, July 28, 2009 (74 FR 37190). The cancellation of the subject 
SEIS is necessitated due to a change in scope of the rehabilitation 
project. The initial focus of the HHD Major Rehabilitation Report (MRR) 
from 2000 divided the 143 miles dike into eight Reaches with the 
initial focus on Reach 1. This Reach by Reach approach is being 
replaced with a system-wide risk reduction approach as required for 
safety modifications to dams.

FOR FURTHER INFORMATION CONTACT: Questions may be forwarded to Ms. 
Angela Dunn, Environmental Branch, Planning Division, Jacksonville 
District, Corps of Engineers, Post Office Box 4970, Jacksonville, FL 
32232-0019, Phone: 904-232-2108.

SUPPLEMENTARY INFORMATION: The supplemental MRR will be replaced with a 
system-wide Dam Safety Modification (DSM) Report. Environmental 
documentation will be prepared and coordinated in conjunction with the 
system wide DSM Report as required by the National Environmental Policy 
Act.

     Dated: January 16, 2013.
Eric P. Summa,
Chief, Environmental Branch.
[FR Doc. 2013-02460 Filed 2-4-13; 8:45 am]
BILLING CODE 3720-58-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.