Cancellation of the Notice of Intent To Prepare a Draft and Final Supplemental Environmental Impact Statement for Reach 1A on the Herbert Hoover Dike Major Rehabilitation Project, Martin and Palm Beach Counties, 8118-8119 [2013-02459]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
8118
Federal Register / Vol. 78, No. 24 / Tuesday, February 5, 2013 / Notices
statutory or regulatory violation by
Whalen or any admission by Whalen of
the accuracy of any allegations made by
staff.
16. Upon provisional acceptance of
the Agreement by the Commission, the
Agreement shall be placed on the public
record and published in the Federal
Register in accordance with the
procedures set forth in 16 C.F.R.
§ 1118.20(e). If the Commission does not
receive any written request not to accept
the Agreement within fifteen (15)
calendar days, the Agreement shall be
deemed finally accepted on the 16th
calendar day after the date it is
published in the Federal Register, in
accordance with 16 C.F.R. § 1118.20(f).
17. Upon the Commission’s final
acceptance of the Agreement and
issuance of the final Order, Whalen
knowingly, voluntarily and completely
waives any rights it may have in this
matter to the following: (i) an
administrative or judicial hearing; (ii)
judicial review or other challenge or
contest of the Commission’s actions; (iii)
a determination by the Commission as
to whether Whalen failed to comply
with the CPSA and the underlying
regulations; (iv) a statement of findings
of fact and conclusions of law; and (v)
any claims under the Equal Access to
Justice Act.
18. The Commission may publicize
the terms of the Agreement and the
Order.
19. The Agreement and the Order
shall apply to and be binding upon
Whalen and each of its successors and/
or assigns.
20. The Commission issues the Order
under the provisions of the CPSA, and
a violation of the Order may subject
Whalen and each of its successors and/
or assigns to appropriate legal action.
21. The Agreement may be used in
interpreting the Order. Understandings,
agreements, representations or
interpretations apart from those
contained in the Agreement and the
Order may not be used to vary or
contradict their terms. The Agreement
shall not be waived, amended, modified
or otherwise altered without written
agreement thereto executed by the party
against whom such waiver, amendment,
modification or alteration is sought to be
enforced.
22. If any provision of the Agreement
or the Order is held to be illegal, invalid
or unenforceable under present or future
laws effective during the terms of the
Agreement and the Order, such
provision shall be fully severable. The
balance of the Agreement and the Order
shall remain in full force and effect,
unless the Commission and Whalen
agree that severing the provision
VerDate Mar<15>2010
17:18 Feb 04, 2013
Jkt 229001
materially affects the purpose of the
Agreement and the Order.
Dated: January 1, 2013.
WHALEN FURNITURE MANUFACTURING,
INC.
By:
Kenneth J. Whalen,
President, Whalen Furniture Manufacturing,
Inc., 1578 Air Wing Road, San Diego, CA
92154.
Dated: January 1, 2013.
By:
Sheila A. Millar, Esquire.
Keller and Heckman, LLP,
1001 G Street, NW., Washington, DC 20001,
Counsel for Whalen Furniture
Manufacturing, Inc.
U.S. CONSUMER PRODUCT SAFETY
COMMISSION STAFF
Mary T. Boyle,
Acting General Counsel.
William J. Moore, Jr.,
Trial Attorney, Division of Compliance,
Office of the General Counsel.
Dated: January 3, 2013.
By:
Mary B. Murphy,
Assistant General Counsel, Division of
Compliance, Office of the General Counsel.
UNITED STATES OF AMERICA
CONSUMER PRODUCT SAFETY
COMMISSION
In the Matter of: WHALEN FURNITURE
MANUFACTURING, INC. d/b/a Bayside
Furnishings
CPSC Docket No.: 13–C0003
ORDER
Upon consideration of the Settlement
Agreement entered into between
Whalen Furniture Manufacturing, Inc.
(‘‘Whalen’’), and the U.S. Consumer
Product Safety Commission
(‘‘Commission’’) staff, and the
Commission having jurisdiction over
the subject matter and over Whalen, and
it appearing that the Settlement
Agreement and the Order are in the
public interest, it is
ORDERED that the Settlement
Agreement be, and is, hereby, accepted;
and it is
FURTHER ORDERED that Whalen
shall pay a civil penalty in the amount
of seven hundred twenty-five thousand
dollars ($725,000.00) within twenty (20)
days of service of the Commission’s
final Order accepting the Settlement
Agreement. The payment shall be made
electronically to the CPSC via
www.pay.gov. Upon the failure of
Whalen to make the foregoing payment
when due, interest on the unpaid
amount shall accrue and be paid by
Whalen at the federal legal rate of
interest set forth at 28 U.S.C. § 1961(a)
and (b).
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Provisionally accepted and
provisional Order issued on the 31st day
of January, 2013.
BY ORDER OF THE COMMISSION:
Todd A. Stevenson,
Secretary, U.S. Consumer Product Safety
Commission.
[FR Doc. 2013–02442 Filed 2–4–13; 8:45 am]
BILLING CODE 6355–01–P
DEPARTMENT OF DEFENSE
Department of the Army; Corps of
Engineers
Cancellation of the Notice of Intent To
Prepare a Draft and Final Supplemental
Environmental Impact Statement for
Reach 1A on the Herbert Hoover Dike
Major Rehabilitation Project, Martin
and Palm Beach Counties
Department of the Army, U.S.
Army Corps of Engineers, DOD.
ACTION: Notice; cancellation.
AGENCY:
The Jacksonville District, U.S.
Army Corps of Engineers (USACE)
hereby cancels its Notice of Intent (NOI)
to prepare a Supplemental
Environmental Impact Statement (SEIS)
for Reach 1A on the Herbert Hoover
Dike (HHD) Major Rehabilitation
Project, as published in the Federal
Register, March 9, 2009 (74 FR 10038).
The USACE issued a Notice of
Availability (NOA) for the Draft SEIS on
June 25, 2010 (75 FR 36386). A public
meeting was held in Canal Point on July
22, 2010 to present the Draft SEIS.
The cancellation of the subject SEIS is
necessitated due to a change in scope of
the rehabilitation project. The initial
focus of the HHD Major Rehabilitation
Report (MRR) from 2000 divided the
143 miles dike into eight Reaches with
the initial focus on Reach 1. This Reach
by Reach approach is being replaced
with a system-wide risk reduction
approach as required for safety
modifications to dams.
FOR FURTHER INFORMATION CONTACT:
Questions may be forwarded to Ms.
Angela Dunn, Environmental Branch,
Planning Division, Jacksonville District,
Corps of Engineers, Post Office Box
4970, Jacksonville, FL 32232–0019,
Phone: 904–232–2108.
SUPPLEMENTARY INFORMATION: The
supplemental MRR will be replaced
with a system-wide Dam Safety
Modification (DSM) Report.
Environmental documentation will be
prepared and coordinated in
conjunction with the system wide DSM
Report as required by the National
Environmental Policy Act.
SUMMARY:
E:\FR\FM\05FEN1.SGM
05FEN1
Federal Register / Vol. 78, No. 24 / Tuesday, February 5, 2013 / Notices
Dated: January 16, 2013.
Eric P. Summa,
Chief, Environmental Branch.
DEPARTMENT OF DEFENSE
DEPARTMENT OF DEFENSE
Department of the Army; Corps of
Engineers
Cancellation of the Notice of Intent To
Prepare a Draft and Final Supplemental
Environmental Impact Statement for
Reach 1B, C, and D on the Herbert
Hoover Dike Major Rehabilitation
Project, Martin and Palm Beach
Counties
Department of the Army, U.S.
Army Corps of Engineers, DOD.
AGENCY:
Notice; cancellation.
The Jacksonville District, U.S.
Army Corps of Engineers (USACE)
hereby cancels its Notice of Intent (NOI)
to prepare a Supplemental
Environmental Impact Statement (SEIS)
for Reach 1B, C, and D on the HHD
Major Rehabilitation Project, as
published in the Federal Register, July
28, 2009 (74 FR 37190). The
cancellation of the subject SEIS is
necessitated due to a change in scope of
the rehabilitation project. The initial
focus of the HHD Major Rehabilitation
Report (MRR) from 2000 divided the
143 miles dike into eight Reaches with
the initial focus on Reach 1. This Reach
by Reach approach is being replaced
with a system-wide risk reduction
approach as required for safety
modifications to dams.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Questions may be forwarded to Ms.
Angela Dunn, Environmental Branch,
Planning Division, Jacksonville District,
Corps of Engineers, Post Office Box
4970, Jacksonville, FL 32232–0019,
Phone: 904–232–2108.
The
supplemental MRR will be replaced
with a system-wide Dam Safety
Modification (DSM) Report.
Environmental documentation will be
prepared and coordinated in
conjunction with the system wide DSM
Report as required by the National
Environmental Policy Act.
tkelley on DSK3SPTVN1PROD with NOTICES
SUPPLEMENTARY INFORMATION:
Federal Energy Regulatory
Commission
Cancellation of the Notice of Intent To
Prepare a Draft and Final Supplemental
Environmental Impact Statement for
Reaches 2 and 3 on the Herbert Hoover
Dike Major Rehabilitation Project, Palm
Beach and Glades Counties, FL
BILLING CODE 3720–58–P
DEPARTMENT OF ENERGY
Department of the Army; Corps of
Engineers
[FR Doc. 2013–02459 Filed 2–4–13; 8:45 am]
ACTION:
Combined Notice of Filings
Department of the Army, U.S.
Army Corps of Engineers, DOD.
Docket Numbers: RP13–459–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: 4Q 2012 Penalty Credit
Revenue Report.
Filed Date: 1/22/13.
Accession Number: 20130122–5241.
Comments Due: 5 p.m. ET 2/4/13.
Docket Numbers: RP13–473–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: Secondary Scheduling
Priorities to be effective 4/1/2013.
Filed Date: 1/24/13.
Accession Number: 20130124–5072.
Comments Due: 5 p.m. ET 2/5/13.
Docket Numbers: RP13–474–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: 01/24/13 Negotiated
Rates—Sequent Energy Management
(HUB) 3075–89 to be effective 1/23/
2013.
Filed Date: 1/24/13.
Accession Number: 20130124–5104.
Comments Due: 5 p.m. ET 2/5/13.
Docket Numbers: RP13–475–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: 01/24/13 Negotiated
Rates—United Energy Trading (HUB)
5095–89 to be effective 1/23/2013.
Filed Date: 1/24/13.
Accession Number: 20130124–5106.
Comments Due: 5 p.m. ET 2/5/13.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
AGENCY:
ACTION:
Notice; cancellation.
The Jacksonville District, U.S.
Army Corps of Engineers (USACE)
hereby cancels its Notice of Intent (NOI)
to prepare a Supplemental
Environmental Impact Statement (SEIS)
for Reaches 2 and 3 on the HHD Major
Rehabilitation Project, as published in
the Federal Register, August 9, 2006 (71
FR 45539). The USACE issued an NOA
for the Draft SEIS on December 22, 2006
(71 FR 77013). A public meeting was
held in Clewiston on January 10, 2007
to present the Draft SEIS.
The USACE issued a second NOI,
published in the Federal Register,
August 31, 2009 (74 FR 44828), due to
a revision to the preferred alternative
discussed and coordinated in the
December 2006 Draft SEIS.
The cancellation of the subject SEIS is
necessitated due to a change in scope of
the rehabilitation project. The initial
focus of the HHD Major Rehabilitation
Report (MRR) from 2000 divided the
143 miles dike into eight Reaches with
the initial focus on Reach 1. This Reach
by Reach approach is being replaced
with a system wide risk reduction
approach as required for safety
modifications to dams.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Questions may be forwarded to Ms.
Angela Dunn, Environmental Branch,
Planning Division, Jacksonville District,
Corps of Engineers, Post Office Box
4970, Jacksonville, FL 32232–0019,
Phone: 904–232–2108.
The
supplemental MRR will be replaced
with a system wide Dam Safety
Modification (DSM) Report.
Environmental documentation will be
prepared and coordinated in
conjunction with the system wide DSM
Report.
SUPPLEMENTARY INFORMATION:
Dated: January 16, 2013.
Eric P. Summa,
Chief, Environmental Branch.
Dated: January 16, 2013.
Eric P. Summa,
Chief, Environmental Branch.
[FR Doc. 2013–02460 Filed 2–4–13; 8:45 am]
[FR Doc. 2013–02458 Filed 2–4–13; 8:45 am]
BILLING CODE 3720–58–P
BILLING CODE 3720–58–P
VerDate Mar<15>2010
17:18 Feb 04, 2013
8119
Jkt 229001
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Filings in Existing Proceedings
Docket Numbers: RP13–110–001.
Applicants: Discovery Gas
Transmission LLC.
Description: NAESB V2.0—2nd
Compliance to be effective 12/1/2012.
Filed Date: 1/24/13.
Accession Number: 20130124–5100.
Comments Due: 5 p.m. ET 2/5/13.
Any person desiring to protest in any
the above proceedings must file in
E:\FR\FM\05FEN1.SGM
05FEN1
Agencies
[Federal Register Volume 78, Number 24 (Tuesday, February 5, 2013)]
[Notices]
[Pages 8118-8119]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-02459]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army; Corps of Engineers
Cancellation of the Notice of Intent To Prepare a Draft and Final
Supplemental Environmental Impact Statement for Reach 1A on the Herbert
Hoover Dike Major Rehabilitation Project, Martin and Palm Beach
Counties
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DOD.
ACTION: Notice; cancellation.
-----------------------------------------------------------------------
SUMMARY: The Jacksonville District, U.S. Army Corps of Engineers
(USACE) hereby cancels its Notice of Intent (NOI) to prepare a
Supplemental Environmental Impact Statement (SEIS) for Reach 1A on the
Herbert Hoover Dike (HHD) Major Rehabilitation Project, as published in
the Federal Register, March 9, 2009 (74 FR 10038).
The USACE issued a Notice of Availability (NOA) for the Draft SEIS
on June 25, 2010 (75 FR 36386). A public meeting was held in Canal
Point on July 22, 2010 to present the Draft SEIS.
The cancellation of the subject SEIS is necessitated due to a
change in scope of the rehabilitation project. The initial focus of the
HHD Major Rehabilitation Report (MRR) from 2000 divided the 143 miles
dike into eight Reaches with the initial focus on Reach 1. This Reach
by Reach approach is being replaced with a system-wide risk reduction
approach as required for safety modifications to dams.
FOR FURTHER INFORMATION CONTACT: Questions may be forwarded to Ms.
Angela Dunn, Environmental Branch, Planning Division, Jacksonville
District, Corps of Engineers, Post Office Box 4970, Jacksonville, FL
32232-0019, Phone: 904-232-2108.
SUPPLEMENTARY INFORMATION: The supplemental MRR will be replaced with a
system-wide Dam Safety Modification (DSM) Report. Environmental
documentation will be prepared and coordinated in conjunction with the
system wide DSM Report as required by the National Environmental Policy
Act.
[[Page 8119]]
Dated: January 16, 2013.
Eric P. Summa,
Chief, Environmental Branch.
[FR Doc. 2013-02459 Filed 2-4-13; 8:45 am]
BILLING CODE 3720-58-P