Cancellation of the Notice of Intent To Prepare a Draft and Final Supplemental Environmental Impact Statement for Reaches 2 and 3 on the Herbert Hoover Dike Major Rehabilitation Project, Palm Beach and Glades Counties, FL, 8119 [2013-02458]
Download as PDF
Federal Register / Vol. 78, No. 24 / Tuesday, February 5, 2013 / Notices
Dated: January 16, 2013.
Eric P. Summa,
Chief, Environmental Branch.
DEPARTMENT OF DEFENSE
DEPARTMENT OF DEFENSE
Department of the Army; Corps of
Engineers
Cancellation of the Notice of Intent To
Prepare a Draft and Final Supplemental
Environmental Impact Statement for
Reach 1B, C, and D on the Herbert
Hoover Dike Major Rehabilitation
Project, Martin and Palm Beach
Counties
Department of the Army, U.S.
Army Corps of Engineers, DOD.
AGENCY:
Notice; cancellation.
The Jacksonville District, U.S.
Army Corps of Engineers (USACE)
hereby cancels its Notice of Intent (NOI)
to prepare a Supplemental
Environmental Impact Statement (SEIS)
for Reach 1B, C, and D on the HHD
Major Rehabilitation Project, as
published in the Federal Register, July
28, 2009 (74 FR 37190). The
cancellation of the subject SEIS is
necessitated due to a change in scope of
the rehabilitation project. The initial
focus of the HHD Major Rehabilitation
Report (MRR) from 2000 divided the
143 miles dike into eight Reaches with
the initial focus on Reach 1. This Reach
by Reach approach is being replaced
with a system-wide risk reduction
approach as required for safety
modifications to dams.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Questions may be forwarded to Ms.
Angela Dunn, Environmental Branch,
Planning Division, Jacksonville District,
Corps of Engineers, Post Office Box
4970, Jacksonville, FL 32232–0019,
Phone: 904–232–2108.
The
supplemental MRR will be replaced
with a system-wide Dam Safety
Modification (DSM) Report.
Environmental documentation will be
prepared and coordinated in
conjunction with the system wide DSM
Report as required by the National
Environmental Policy Act.
tkelley on DSK3SPTVN1PROD with NOTICES
SUPPLEMENTARY INFORMATION:
Federal Energy Regulatory
Commission
Cancellation of the Notice of Intent To
Prepare a Draft and Final Supplemental
Environmental Impact Statement for
Reaches 2 and 3 on the Herbert Hoover
Dike Major Rehabilitation Project, Palm
Beach and Glades Counties, FL
BILLING CODE 3720–58–P
DEPARTMENT OF ENERGY
Department of the Army; Corps of
Engineers
[FR Doc. 2013–02459 Filed 2–4–13; 8:45 am]
ACTION:
Combined Notice of Filings
Department of the Army, U.S.
Army Corps of Engineers, DOD.
Docket Numbers: RP13–459–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: 4Q 2012 Penalty Credit
Revenue Report.
Filed Date: 1/22/13.
Accession Number: 20130122–5241.
Comments Due: 5 p.m. ET 2/4/13.
Docket Numbers: RP13–473–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: Secondary Scheduling
Priorities to be effective 4/1/2013.
Filed Date: 1/24/13.
Accession Number: 20130124–5072.
Comments Due: 5 p.m. ET 2/5/13.
Docket Numbers: RP13–474–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: 01/24/13 Negotiated
Rates—Sequent Energy Management
(HUB) 3075–89 to be effective 1/23/
2013.
Filed Date: 1/24/13.
Accession Number: 20130124–5104.
Comments Due: 5 p.m. ET 2/5/13.
Docket Numbers: RP13–475–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: 01/24/13 Negotiated
Rates—United Energy Trading (HUB)
5095–89 to be effective 1/23/2013.
Filed Date: 1/24/13.
Accession Number: 20130124–5106.
Comments Due: 5 p.m. ET 2/5/13.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
AGENCY:
ACTION:
Notice; cancellation.
The Jacksonville District, U.S.
Army Corps of Engineers (USACE)
hereby cancels its Notice of Intent (NOI)
to prepare a Supplemental
Environmental Impact Statement (SEIS)
for Reaches 2 and 3 on the HHD Major
Rehabilitation Project, as published in
the Federal Register, August 9, 2006 (71
FR 45539). The USACE issued an NOA
for the Draft SEIS on December 22, 2006
(71 FR 77013). A public meeting was
held in Clewiston on January 10, 2007
to present the Draft SEIS.
The USACE issued a second NOI,
published in the Federal Register,
August 31, 2009 (74 FR 44828), due to
a revision to the preferred alternative
discussed and coordinated in the
December 2006 Draft SEIS.
The cancellation of the subject SEIS is
necessitated due to a change in scope of
the rehabilitation project. The initial
focus of the HHD Major Rehabilitation
Report (MRR) from 2000 divided the
143 miles dike into eight Reaches with
the initial focus on Reach 1. This Reach
by Reach approach is being replaced
with a system wide risk reduction
approach as required for safety
modifications to dams.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Questions may be forwarded to Ms.
Angela Dunn, Environmental Branch,
Planning Division, Jacksonville District,
Corps of Engineers, Post Office Box
4970, Jacksonville, FL 32232–0019,
Phone: 904–232–2108.
The
supplemental MRR will be replaced
with a system wide Dam Safety
Modification (DSM) Report.
Environmental documentation will be
prepared and coordinated in
conjunction with the system wide DSM
Report.
SUPPLEMENTARY INFORMATION:
Dated: January 16, 2013.
Eric P. Summa,
Chief, Environmental Branch.
Dated: January 16, 2013.
Eric P. Summa,
Chief, Environmental Branch.
[FR Doc. 2013–02460 Filed 2–4–13; 8:45 am]
[FR Doc. 2013–02458 Filed 2–4–13; 8:45 am]
BILLING CODE 3720–58–P
BILLING CODE 3720–58–P
VerDate Mar<15>2010
17:18 Feb 04, 2013
8119
Jkt 229001
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Filings in Existing Proceedings
Docket Numbers: RP13–110–001.
Applicants: Discovery Gas
Transmission LLC.
Description: NAESB V2.0—2nd
Compliance to be effective 12/1/2012.
Filed Date: 1/24/13.
Accession Number: 20130124–5100.
Comments Due: 5 p.m. ET 2/5/13.
Any person desiring to protest in any
the above proceedings must file in
E:\FR\FM\05FEN1.SGM
05FEN1
Agencies
[Federal Register Volume 78, Number 24 (Tuesday, February 5, 2013)]
[Notices]
[Page 8119]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-02458]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army; Corps of Engineers
Cancellation of the Notice of Intent To Prepare a Draft and Final
Supplemental Environmental Impact Statement for Reaches 2 and 3 on the
Herbert Hoover Dike Major Rehabilitation Project, Palm Beach and Glades
Counties, FL
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DOD.
ACTION: Notice; cancellation.
-----------------------------------------------------------------------
SUMMARY: The Jacksonville District, U.S. Army Corps of Engineers
(USACE) hereby cancels its Notice of Intent (NOI) to prepare a
Supplemental Environmental Impact Statement (SEIS) for Reaches 2 and 3
on the HHD Major Rehabilitation Project, as published in the Federal
Register, August 9, 2006 (71 FR 45539). The USACE issued an NOA for the
Draft SEIS on December 22, 2006 (71 FR 77013). A public meeting was
held in Clewiston on January 10, 2007 to present the Draft SEIS.
The USACE issued a second NOI, published in the Federal Register,
August 31, 2009 (74 FR 44828), due to a revision to the preferred
alternative discussed and coordinated in the December 2006 Draft SEIS.
The cancellation of the subject SEIS is necessitated due to a
change in scope of the rehabilitation project. The initial focus of the
HHD Major Rehabilitation Report (MRR) from 2000 divided the 143 miles
dike into eight Reaches with the initial focus on Reach 1. This Reach
by Reach approach is being replaced with a system wide risk reduction
approach as required for safety modifications to dams.
FOR FURTHER INFORMATION CONTACT: Questions may be forwarded to Ms.
Angela Dunn, Environmental Branch, Planning Division, Jacksonville
District, Corps of Engineers, Post Office Box 4970, Jacksonville, FL
32232-0019, Phone: 904-232-2108.
SUPPLEMENTARY INFORMATION: The supplemental MRR will be replaced with a
system wide Dam Safety Modification (DSM) Report. Environmental
documentation will be prepared and coordinated in conjunction with the
system wide DSM Report.
Dated: January 16, 2013.
Eric P. Summa,
Chief, Environmental Branch.
[FR Doc. 2013-02458 Filed 2-4-13; 8:45 am]