Milestone
Target date
Modified 4(e) and Fishway Prescriptions ..............................................................................................................
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: January 25, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–02241 Filed 2–1–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2785–081]
mstockstill on DSK4VPTVN1PROD with NOTICES
Boyce Hydro Power, LLC; Notice of
Application Accepted for Filing,
Soliciting Motions To Intervene,
Protests, and Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
to License.
b. Project No: 2785–081.
c. Date Filed: September 11, 2012.
d. Applicant: Boyce Hydro Power,
LLC.
e. Name of Project: Sanford
Hydroelectric Project.
f. Location: On the Tittabawassee
River in Midland County, Michigan.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Lee W. Mueller,
Boyce Hydro Power, LLC, 6000 S. M–30,
Edenville, MI 48620, (989) 689–3161.
i. FERC Contact: B. Peter Yarrington,
(202) 502–6129 or
peter.yarrington@ferc.gov.
j. Deadline for filing motions to
intervene, protests, and comments is 15
days from the issuance date of this
notice.
All documents may be filed
electronically via the Internet. See 18
CFR 85.2001(a)(1)(iii) and the
instructions on the Commission’s Web
VerDate Mar<15>2010
19:26 Feb 01, 2013
Jkt 229001
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
Please include the project number (P–
2785–081) on any motions, protests, or
comments filed.
k. Description of Application: The
licensee proposes to replace one of the
project’s three existing turbine/generator
units with a new unit. The project’s
maximum hydraulic capacity would
remain the same but the new unit would
be able to operate over a greater range
of flows and the licensee intends to
release the required minimum flow
through this unit rather than over the
spillway. The proposal would raise the
project’s total installed capacity from
3,300 to 3,600 kilowatts.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call (866) 208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Motions to Intervene, Protests, and
Comments: Anyone may submit a
motion to intervene, protest, or
comments in accordance with the
requirements of Rules of Practice and
PO 00000
Frm 00033
Fmt 4703
Sfmt 9990
Wednesday, October 23, 2013.
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any motions to
intervene, protests, or comments must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must: (1) Bear in
all capital letters the title ‘‘MOTION TO
INTERVENE,’’ ‘‘PROTEST,’’ or
‘‘COMMENTS’’ as applicable; (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
intervening, protesting, or commenting;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All motions to
intervene, protests, or comments must
set forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). All motions to
intervene, protests, or comments should
relate to project works which are the
subject of the application. Agencies may
obtain copies of the application directly
from the applicant. A copy of any
motion to intervene or protest must be
served upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and 18
CFR 385.2010.
Dated: January 24, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–02250 Filed 2–1–13; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\04FEN1.SGM
04FEN1
Agencies
[Federal Register Volume 78, Number 23 (Monday, February 4, 2013)]
[Notices]
[Page 7770]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-02250]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2785-081]
Boyce Hydro Power, LLC; Notice of Application Accepted for
Filing, Soliciting Motions To Intervene, Protests, and Comments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment to License.
b. Project No: 2785-081.
c. Date Filed: September 11, 2012.
d. Applicant: Boyce Hydro Power, LLC.
e. Name of Project: Sanford Hydroelectric Project.
f. Location: On the Tittabawassee River in Midland County,
Michigan.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Lee W. Mueller, Boyce Hydro Power, LLC, 6000
S. M-30, Edenville, MI 48620, (989) 689-3161.
i. FERC Contact: B. Peter Yarrington, (202) 502-6129 or
peter.yarrington@ferc.gov.
j. Deadline for filing motions to intervene, protests, and comments
is 15 days from the issuance date of this notice.
All documents may be filed electronically via the Internet. See 18
CFR 85.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: The Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments.
Please include the project number (P-2785-081) on any motions,
protests, or comments filed.
k. Description of Application: The licensee proposes to replace one
of the project's three existing turbine/generator units with a new
unit. The project's maximum hydraulic capacity would remain the same
but the new unit would be able to operate over a greater range of flows
and the licensee intends to release the required minimum flow through
this unit rather than over the spillway. The proposal would raise the
project's total installed capacity from 3,300 to 3,600 kilowatts.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call (866) 208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Motions to Intervene, Protests, and Comments: Anyone may submit
a motion to intervene, protest, or comments in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any motions to intervene,
protests, or comments must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must: (1)
Bear in all capital letters the title ``MOTION TO INTERVENE,''
``PROTEST,'' or ``COMMENTS'' as applicable; (2) set forth in the
heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person intervening, protesting, or
commenting; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All motions to intervene, protests, or
comments must set forth their evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b). All motions to intervene,
protests, or comments should relate to project works which are the
subject of the application. Agencies may obtain copies of the
application directly from the applicant. A copy of any motion to
intervene or protest must be served upon each representative of the
applicant specified in the particular application. If an intervener
files comments or documents with the Commission relating to the merits
of an issue that may affect the responsibilities of a particular
resource agency, they must also serve a copy of the document on that
resource agency. A copy of all other filings in reference to this
application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 18 CFR 385.2010.
Dated: January 24, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-02250 Filed 2-1-13; 8:45 am]
BILLING CODE 6717-01-P