Algonquin Power Company; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 6318 [2013-01923]
Download as PDF
6318
Federal Register / Vol. 78, No. 20 / Wednesday, January 30, 2013 / Notices
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: January 23, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–01922 Filed 1–29–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2593–030 and 2823–019]
mstockstill on DSK4VPTVN1PROD with
Algonquin Power Company; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
and Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 2593–030 and 2823–
019.
c. Date Filed: November 29, 2012.
d. Submitted By: Algonquin Power
Company.
e. Name of Project: Upper Beaver
Falls Hydroelectric Project (P–2593–
030) and Lower Beaver Falls
Hydroelectric Project (P–2823–019).
f. Location: The Upper and Lower
Beaver Falls Hydroelectric Projects are
located on the Beaver River in the
Towns of Croghan and New Bremen in
Lewis County, New York. The projects
do not affect federal lands.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations
h. Potential Applicant Contact: Mr.
Armando Sanchez, Algonquin Power
Company, 2845 Bristol Circle, Oakville,
Ontario, Canada, L6H 7H7; (905) 465–
4555; or email at armando.
sanchez@algonquinpower.com.
i. FERC Contact: Andy Bernick at
(202) 502–8660 or email at andrew.
bernick@ferc.gov.
j. Algonquin Power Company filed a
request to use the Traditional Licensing
Process for both projects on November
29, 2012. Algonquin Power Company
provided public notice of the request on
December 19, 2012. In a letter dated
January 23, 2013, the Director of the
Division of Hydropower Licensing
approved the request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or NOAA
VerDate Mar<15>2010
20:43 Jan 29, 2013
Jkt 229001
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50 CFR
Part 402; and (b) the New York State
Historic Preservation Officer, as
required by section 106, National
Historical Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Algonquin Power Company as the
Commission’s non-federal
representative for carrying out informal
consultation, pursuant to section 7 of
the Endangered Species Act, and section
106 of the National Historic
Preservation Act.
m. Algonquin Power Company filed a
combined Pre-Application Document
(PAD) for both projects with the
Commission, including a proposed
process plan and schedule, pursuant to
18 CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number (P–2593–
030 or P–2823–019), excluding the last
three digits in the docket number field
to access the document. For assistance,
contact FERC Online Support at FERC
OnlineSupport@ferc.gov or toll free at
1–866–208–3676, or for TTY, (202) 502–
8659. A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project Nos. 2593–030
and 2823–019. Pursuant to 18 CFR 16.8,
16.9, and 16.10 each application for a
new license and any competing license
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
All applications for license for these
projects must be filed by December 31,
2015.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: January 23, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–01923 Filed 1–29–13; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR13–22–000]
SourceGas Distribution LLC; Notice of
Petition for Rate Approval
Take notice that on January 15, 2013,
SourceGas Distribution LLC (SourceGas)
filed a rate election pursuant to section
284.123(b)(1) of the Commissions
regulations. SourceGas states the rate
election for transportation service is
based on rates for comparable service on
file with the Public Service Commission
of Wyoming, as more fully detailed in
the petition.
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on Wednesday, January 30, 2013.
E:\FR\FM\30JAN1.SGM
30JAN1
Agencies
[Federal Register Volume 78, Number 20 (Wednesday, January 30, 2013)]
[Notices]
[Page 6318]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-01923]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 2593-030 and 2823-019]
Algonquin Power Company; Notice of Intent To File License
Application, Filing of Pre-Application Document, and Approving Use of
the Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 2593-030 and 2823-019.
c. Date Filed: November 29, 2012.
d. Submitted By: Algonquin Power Company.
e. Name of Project: Upper Beaver Falls Hydroelectric Project (P-
2593-030) and Lower Beaver Falls Hydroelectric Project (P-2823-019).
f. Location: The Upper and Lower Beaver Falls Hydroelectric
Projects are located on the Beaver River in the Towns of Croghan and
New Bremen in Lewis County, New York. The projects do not affect
federal lands.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations
h. Potential Applicant Contact: Mr. Armando Sanchez, Algonquin
Power Company, 2845 Bristol Circle, Oakville, Ontario, Canada, L6H 7H7;
(905) 465-4555; or email at armando.sanchez@algonquinpower.com.
i. FERC Contact: Andy Bernick at (202) 502-8660 or email at
andrew.bernick@ferc.gov.
j. Algonquin Power Company filed a request to use the Traditional
Licensing Process for both projects on November 29, 2012. Algonquin
Power Company provided public notice of the request on December 19,
2012. In a letter dated January 23, 2013, the Director of the Division
of Hydropower Licensing approved the request to use the Traditional
Licensing Process.
k. With this notice, we are initiating informal consultation with:
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under
section 7 of the Endangered Species Act and the joint agency
regulations thereunder at 50 CFR Part 402; and (b) the New York State
Historic Preservation Officer, as required by section 106, National
Historical Preservation Act, and the implementing regulations of the
Advisory Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Algonquin Power Company as
the Commission's non-federal representative for carrying out informal
consultation, pursuant to section 7 of the Endangered Species Act, and
section 106 of the National Historic Preservation Act.
m. Algonquin Power Company filed a combined Pre-Application
Document (PAD) for both projects with the Commission, including a
proposed process plan and schedule, pursuant to 18 CFR 5.6 of the
Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number (P-2593-030 or P-2823-019), excluding the last three digits in
the docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a new license for Project Nos. 2593-030 and 2823-019.
Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new
license and any competing license applications must be filed with the
Commission at least 24 months prior to the expiration of the existing
license. All applications for license for these projects must be filed
by December 31, 2015.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: January 23, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-01923 Filed 1-29-13; 8:45 am]
BILLING CODE 6717-01-P