Eastern Hydroelectric Corporation; Notice Rejecting Request for Rehearing, 6319 [2013-01914]
Download as PDF
Federal Register / Vol. 78, No. 20 / Wednesday, January 30, 2013 / Notices
Dated: January 17, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–01912 Filed 1–29–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD13–4–000]
mstockstill on DSK4VPTVN1PROD with
Notice of Availability of the Report:
Recommended Parameters for Solid
Flame Models for Land Based
Liquefied Natural Gas Spills
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a report, in
the above-referenced docket, examining
potential changes to LNGFIRE3, the
solid flame model required by the U.S.
Department of Transportation’s
regulations at Title 49, Code of Federal
Regulations (CFR), Part 193 for
predicting radiant heat from liquefied
natural gas (LNG) pool fires on land.
The report investigates the effects of
matching both individual modeling
parameters/correlations to measured
experimental data and overall radiant
heat predictions to measured results
from field experiments. The review
specifically addresses experimental data
from the Phoenix large scale LNG fire
tests on water conducted by Sandia
National Laboratories between 2008 and
2011 and from the Montoir large scale
LNG fire test over land conducted by
Gaz de France in 1989. FERC staff
concludes that LNGFIRE3, as currently
prescribed by 49 CFR part 193, is
appropriate for modeling thermal
radiation from LNG pool fires on land
and is suitable for use in siting on-shore
LNG facilities. The report is available
for public viewing on the FERC’s Web
site (www.ferc.gov) using the eLibrary
link.
Any person wishing to comment on
the report may do so. The comment
period is 30 days and ends on February
22, 2013. For your convenience, there
are three methods you can use to file
your comments with the Commission.
In all instances, please reference the
docket number (AD13–4–000) with your
submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
VerDate Mar<15>2010
20:43 Jan 29, 2013
Jkt 229001
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(2) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
The study, as well as any comments
received, will be considered by FERC
staff during preparation of the
environmental assessments or
environmental impact statements
produced for LNG project applications
filed with the Commission.
Information about this document is
available from the Commission’s Office
of External Affairs, at (866) 208–FERC,
or on the FERC Web site (www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General
Search,’’ and enter the docket number
excluding the last three digits in the
Docket Number field (i.e., AD13–4). Be
sure you have selected an appropriate
date range. For assistance, please
contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/
esubscribenow.htm.
Dated: January 23, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–01924 Filed 1–29–13; 8:45 am]
BILLING CODE 6717–01–P
6319
Corporation’s (Eastern Hydroelectric)
East Juliette Project No. 7019, located on
the Ocmulgee River in East Juliette,
Jones County, Georgia.1 On January 11,
2013, Eastern Hydroelectric filed a
request for rehearing of Commission
staff’s order.
Pursuant to section 313(a) of the
Federal Power Act (FPA),2 an aggrieved
party must file a request for rehearing
within thirty days after the issuance of
a Commission decision, in this case no
later than January 7, 2013.3 Because the
30-day rehearing deadline is statutorily
based, it cannot be extended, and the
request for rehearing filed by petitioner
must be rejected as untimely.4
Furthermore, petitioner’s failure to file a
timely request for rehearing constitutes
acceptance of Commission staff’s order.5
This notice constitutes final agency
action. Requests for rehearing by the
Commission of this rejection must be
filed within 30 days of the date of
issuance of this notice pursuant to
section 313(a) of the Federal Power Act,
16 U.S.C. 825l (2006), and section
385.713 of the Commission’s
regulations, 18 CFR 385.713 (2012).
Dated: January 17, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–01914 Filed 1–29–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–54–000]
ANR Pipeline Company; Notice of
Request Under Blanket Authorization
Take notice that on January 18, 2013,
ANR Pipeline Company (ANR), 717
Texas Street, Houston, Texas 77002–
2761, filed in Docket No. CP13–54–000,
an application pursuant to sections
157.205 and 157.216(b) of the
Commission’s Regulations under the
Natural Gas Act (NGA) as amended,
requesting authorization to abandon an
11,000 rated horsepower compressor
unit and appurtenances, located on
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7019–068]
Eastern Hydroelectric Corporation;
Notice Rejecting Request for
Rehearing
On December 7, 2012, Commission
staff issued an order amending license
Article 401 for Eastern Hydroelectric
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
1 Eastern Hydroelectric Corp., 141 FERC ¶ 62,176
(2012).
2 16 U.S.C. 825l (2006).
3 See 18 CFR 385.2007 (2012) (stating that if the
last day of any time period is a Sunday, the period
does not end until the close of the Commission’s
business on the next business day).
4 In addition, the pleading as filed is deficient,
and subject to dismissal, because it failed to include
a Statement of Issues, as required by section
385.713(c)(2) of the Commission’s regulations, 18
CFR 385.713(c)(2) (2012).
5 See Eastern Hydroelectric, 141 FERC ¶ 62,176
(2012) at Ordering Paragraph (I).
E:\FR\FM\30JAN1.SGM
30JAN1
Agencies
[Federal Register Volume 78, Number 20 (Wednesday, January 30, 2013)]
[Notices]
[Page 6319]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-01914]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7019-068]
Eastern Hydroelectric Corporation; Notice Rejecting Request for
Rehearing
On December 7, 2012, Commission staff issued an order amending
license Article 401 for Eastern Hydroelectric Corporation's (Eastern
Hydroelectric) East Juliette Project No. 7019, located on the Ocmulgee
River in East Juliette, Jones County, Georgia.\1\ On January 11, 2013,
Eastern Hydroelectric filed a request for rehearing of Commission
staff's order.
---------------------------------------------------------------------------
\1\ Eastern Hydroelectric Corp., 141 FERC ] 62,176 (2012).
---------------------------------------------------------------------------
Pursuant to section 313(a) of the Federal Power Act (FPA),\2\ an
aggrieved party must file a request for rehearing within thirty days
after the issuance of a Commission decision, in this case no later than
January 7, 2013.\3\ Because the 30-day rehearing deadline is
statutorily based, it cannot be extended, and the request for rehearing
filed by petitioner must be rejected as untimely.\4\ Furthermore,
petitioner's failure to file a timely request for rehearing constitutes
acceptance of Commission staff's order.\5\
---------------------------------------------------------------------------
\2\ 16 U.S.C. 825l (2006).
\3\ See 18 CFR 385.2007 (2012) (stating that if the last day of
any time period is a Sunday, the period does not end until the close
of the Commission's business on the next business day).
\4\ In addition, the pleading as filed is deficient, and subject
to dismissal, because it failed to include a Statement of Issues, as
required by section 385.713(c)(2) of the Commission's regulations,
18 CFR 385.713(c)(2) (2012).
\5\ See Eastern Hydroelectric, 141 FERC ] 62,176 (2012) at
Ordering Paragraph (I).
---------------------------------------------------------------------------
This notice constitutes final agency action. Requests for rehearing
by the Commission of this rejection must be filed within 30 days of the
date of issuance of this notice pursuant to section 313(a) of the
Federal Power Act, 16 U.S.C. 825l (2006), and section 385.713 of the
Commission's regulations, 18 CFR 385.713 (2012).
Dated: January 17, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-01914 Filed 1-29-13; 8:45 am]
BILLING CODE 6717-01-P