Environmental Impacts Statements; Notice of Availability, 5439 [2013-01586]
Download as PDF
Federal Register / Vol. 78, No. 17 / Friday, January 25, 2013 / Notices
the INFB. Congress, in the Explanatory
Statement accompanying the House
Appropriations Committee Print (which
in this Act was given the same effect as
a joint explanatory statement), noted
that the INFB freed up DOE’s LEU setaside, and recommended DOE also
‘‘allow U.S. interests to purchase
uranium fuel from the Reliable Fuel
Supply [now the AFS] in the event of
supply disruption.’’ (H. Approp. Cmte.
Print at 592.)
The sale of LEU from the AFS will be
conducted consistent with applicable
law, the policies and guidance in the
‘‘Secretary of Energy’s 2008 Policy
Statement on Management of
Department of Energy’s Excess Uranium
Inventory’’ (March 11, 2008), and the
DOE Excess Uranium Inventory
Management Plan.
Issued in Washington, DC, on January 15,
2013.
Andrew Bieniawski,
Acting Principal Assistant Deputy
Administrator, Defense Nuclear
Nonproliferation, National Nuclear Security
Administration, U.S. Department of Energy.
[FR Doc. 2013–01525 Filed 1–24–13; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9007–3]
Environmental Impacts Statements;
Notice of Availability
mstockstill on DSK4VPTVN1PROD with
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 01/14/2013 Through 01/18/2013
Pursuant to 40 CFR 1506.9
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
SUPPLEMENTARY INFORMATION: As of
October 1, 2012, EPA will not accept
paper copies or CDs of EISs for filing
purposes; all submissions on or after
October 1, 2012 must be made through
e-NEPA.
While this system eliminates the need
to submit paper or CD copies to EPA to
meet filing requirements, electronic
submission does not change
requirements for distribution of EISs for
public review and comment. To begin
VerDate Mar<15>2010
18:39 Jan 24, 2013
Jkt 229001
using e-NEPA, you must first register
with EPA’s electronic reporting site—
https://cdx.epa.gov/epa_home.asp
EIS No. 20130009, Final EIS, NPS, HI,
Hawaii Volcanoes National Park
Project, Protecting and Restoring
Native Ecosystems by Managing NonNative Ungulates, Hawaii County, HI,
Review Period Ends: 02/25/2013,
Contact: Rhonda Loh 808–986–6098.
EIS No. 20130010, Draft EIS, BLM, CO,
Grand Junction Field Office Resource
Management Plan, Mesa, Garfield,
Montrose and Rio Blanco Counties,
CO, Comment Period Ends: 04/25/
2013, Contact: Collin Ewing 970–244–
3627.
EIS No. 20130011, Draft EIS, NPS, TX,
Lake Meredith National Recreation
Area, Off-Road Management Plan, TX,
Comment Period Ends: 03/26/2013,
Contact: Arlene Wimer 806–857–
0300.
EIS No. 20130012, Draft EIS, USFS, MT,
Blackfoot Travel Plan, Lincoln Ranger
District, Helena National Forest,
Lewis and Clark and Powell Counties,
MT, Comment Period Ends: 03/11/
2013, Contact: Amber Kamps 406–
362–7002.
EIS No. 20130013, Final EIS, USFS, ID,
Scriver Creek Integrated Restoration
Project, Emmett Ranger District, Boise
National Forest, Boise and Valley
Counties, ID, Review Period Ends: 03/
12/2013, Contact: Randal Hayman
208–373–4157.
EIS No. 20130014, Final EIS, FHWA, 00,
Illiana Corridor Project Tier One
Transportation System Improvements,
Will and Kankakee Counties, IL and
Lake County, IN, Contact: J. Michael
Bowen 217–492–4600.
EIS No. 20130015, Draft Supplement,
FHWA, CA, Mid County Parkway, a
new Freeway from the City of Perris
to the City of San Jacinto, Riverside
County, CA, Comment Period Ends:
03/11/2013, Contact: Larry Vinzant
916–498–5040.
Amended Notices
EIS No. 20090231, Draft EIS, BIA, CA,
Point Molate Mixed-Use Tribal
Destination Resort and Casino,
Proposed Project is to Strengthen the
Tribal Government and Improve the
Social Economic Status, Guidiville
Band of Pomo Indian of the Guidiville
Rancheria (Tribe), City of Richmond,
Contra Costa County, CA, Comment
Period Ends: 10/23/2009, Contact:
Larry Blevin 916–978–6037. Revision
to FR Notice Published 10/09/2009;
The U.S. Department of the Interior’s
Bureau of Indian Affairs has Officially
Cancelled the above project.
EIS No. 20120369, Draft EIS, NOAA,
CA, Authorization of Incidental Take
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
5439
and Implementation of the
Mendocino Redwood Habitat
Conservation Plan/Natural
Community Conservation and Timber
Management Plan, Mendocino
County, CA, Comment Period Ends:
04/22/2013, Contact: Eric Shott 707–
575–6089. Revision to FR Notice
Published 11/23/2012; Extending
Comment Period from 02/21/2013 to
04/22/2013.
EIS No. 20120383, Draft EIS, USACE,
CA, Gregory Canyon Landfill,
Application for Permit Authorizing
Discharge of Fill in U.S. Waters, San
Diego County, CA, Comment Period
Ends: 04/15/2013, Contact: William
H. Miller 602–230–6954. Revision to
FR Notice Published 11/23/2012;
Extending Comment Period from 02/
21/2013 to 04/22/2013.
Dated: January 22, 2013.
Cliff Rader,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2013–01586 Filed 1–24–13; 8:45 am]
BILLING CODE 6560–50–P
EXPORT-IMPORT BANK
[Public Notice 2013–0105]
Application for Final Commitment for a
Long-Term Loan or Financial
Guarantee in Excess of $100 Million:
AP087734XX
Export-Import Bank of the
United States.
ACTION: Notice.
AGENCY:
This Notice is to inform the
public, in accordance with Section
3(c)(10) of the Charter of the ExportImport Bank of the United States (‘‘ExIm Bank’’), that Ex-Im Bank has received
an application for final commitment for
a long-term loan or financial guarantee
in excess of $100 million (as calculated
in accordance with Section 3(c)(10) of
the Charter). Comments received within
the comment period specified below
will be presented to the Ex-Im Bank
Board of Directors prior to final action
on this Transaction.
Reference: AP087734XX.
Purpose and Use: Brief description of
the purpose of the transaction:
To support the export of U.S.
manufactured commercial aircraft to
Turkey.
Brief non-proprietary description of
the anticipated use of the items being
exported:
To be used for short- and mediumhaul passenger air service within
Turkey and between Turkey and other
countries.
SUMMARY:
E:\FR\FM\25JAN1.SGM
25JAN1
Agencies
[Federal Register Volume 78, Number 17 (Friday, January 25, 2013)]
[Notices]
[Page 5439]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-01586]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9007-3]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 01/14/2013 Through 01/18/2013
Pursuant to 40 CFR 1506.9
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
SUPPLEMENTARY INFORMATION: As of October 1, 2012, EPA will not accept
paper copies or CDs of EISs for filing purposes; all submissions on or
after October 1, 2012 must be made through e-NEPA.
While this system eliminates the need to submit paper or CD copies
to EPA to meet filing requirements, electronic submission does not
change requirements for distribution of EISs for public review and
comment. To begin using e-NEPA, you must first register with EPA's
electronic reporting site--https://cdx.epa.gov/epa_home.asp
EIS No. 20130009, Final EIS, NPS, HI, Hawaii Volcanoes National Park
Project, Protecting and Restoring Native Ecosystems by Managing Non-
Native Ungulates, Hawaii County, HI, Review Period Ends: 02/25/2013,
Contact: Rhonda Loh 808-986-6098.
EIS No. 20130010, Draft EIS, BLM, CO, Grand Junction Field Office
Resource Management Plan, Mesa, Garfield, Montrose and Rio Blanco
Counties, CO, Comment Period Ends: 04/25/2013, Contact: Collin Ewing
970-244-3627.
EIS No. 20130011, Draft EIS, NPS, TX, Lake Meredith National Recreation
Area, Off-Road Management Plan, TX, Comment Period Ends: 03/26/2013,
Contact: Arlene Wimer 806-857-0300.
EIS No. 20130012, Draft EIS, USFS, MT, Blackfoot Travel Plan, Lincoln
Ranger District, Helena National Forest, Lewis and Clark and Powell
Counties, MT, Comment Period Ends: 03/11/2013, Contact: Amber Kamps
406-362-7002.
EIS No. 20130013, Final EIS, USFS, ID, Scriver Creek Integrated
Restoration Project, Emmett Ranger District, Boise National Forest,
Boise and Valley Counties, ID, Review Period Ends: 03/12/2013, Contact:
Randal Hayman 208-373-4157.
EIS No. 20130014, Final EIS, FHWA, 00, Illiana Corridor Project Tier
One Transportation System Improvements, Will and Kankakee Counties, IL
and Lake County, IN, Contact: J. Michael Bowen 217-492-4600.
EIS No. 20130015, Draft Supplement, FHWA, CA, Mid County Parkway, a new
Freeway from the City of Perris to the City of San Jacinto, Riverside
County, CA, Comment Period Ends: 03/11/2013, Contact: Larry Vinzant
916-498-5040.
Amended Notices
EIS No. 20090231, Draft EIS, BIA, CA, Point Molate Mixed-Use Tribal
Destination Resort and Casino, Proposed Project is to Strengthen the
Tribal Government and Improve the Social Economic Status, Guidiville
Band of Pomo Indian of the Guidiville Rancheria (Tribe), City of
Richmond, Contra Costa County, CA, Comment Period Ends: 10/23/2009,
Contact: Larry Blevin 916-978-6037. Revision to FR Notice Published 10/
09/2009; The U.S. Department of the Interior's Bureau of Indian Affairs
has Officially Cancelled the above project.
EIS No. 20120369, Draft EIS, NOAA, CA, Authorization of Incidental Take
and Implementation of the Mendocino Redwood Habitat Conservation Plan/
Natural Community Conservation and Timber Management Plan, Mendocino
County, CA, Comment Period Ends: 04/22/2013, Contact: Eric Shott 707-
575-6089. Revision to FR Notice Published 11/23/2012; Extending Comment
Period from 02/21/2013 to 04/22/2013.
EIS No. 20120383, Draft EIS, USACE, CA, Gregory Canyon Landfill,
Application for Permit Authorizing Discharge of Fill in U.S. Waters,
San Diego County, CA, Comment Period Ends: 04/15/2013, Contact: William
H. Miller 602-230-6954. Revision to FR Notice Published 11/23/2012;
Extending Comment Period from 02/21/2013 to 04/22/2013.
Dated: January 22, 2013.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2013-01586 Filed 1-24-13; 8:45 am]
BILLING CODE 6560-50-P