Combined Notice of Filings #1, 4140-4141 [2013-00982]
Download as PDF
4140
Federal Register / Vol. 78, No. 13 / Friday, January 18, 2013 / Notices
• Committee reports.
• Board Member Orientation (for both
new and current members/alternates).
• Board Business, including selection
of new HAB Vice-Chair.
Public Participation: The meeting is
open to the public. The EM SSAB,
Hanford, welcomes the attendance of
the public at its advisory committee
meetings and will make every effort to
accommodate persons with physical
disabilities or special needs. If you
require special accommodations due to
a disability, please contact Tifany
Nguyen at least seven days in advance
of the meeting at the phone number
listed above. Written statements may be
filed with the Board either before or
after the meeting. Individuals who wish
to make oral statements pertaining to
agenda items should contact Tifany
Nguyen at the address or telephone
number listed above. Requests must be
received five days prior to the meeting
and reasonable provision will be made
to include the presentation in the
agenda. The Deputy Designated Federal
Officer is empowered to conduct the
meeting in a fashion that will facilitate
the orderly conduct of business.
Individuals wishing to make public
comments will be provided a maximum
of five minutes to present their
comments.
Minutes: Minutes will be available by
writing or calling Tifany Nguyen’s office
at the address or phone number listed
above. Minutes will also be available at
the following Web site: https://
www.hanford.gov/page.cfm/hab.
Issued at Washington, DC on January 14,
2013.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2013–01001 Filed 1–17–13; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Environmental Management SiteSpecific Advisory Board, Northern New
Mexico
Department of Energy.
ACTION: Notice of open meeting.
AGENCY:
This notice announces a
combined meeting of the Environmental
Monitoring, Surveillance and
Remediation Committee and Waste
Management Committee of the
Environmental Management SiteSpecific Advisory Board (EM SSAB),
Northern New Mexico (known locally as
the Northern New Mexico Citizens’
Advisory Board [NNMCAB]). The
Federal Advisory Committee Act (Pub.
L. 92–463, 86 Stat. 770) requires that
mstockstill on DSK4VPTVN1PROD with
SUMMARY:
VerDate Mar<15>2010
16:52 Jan 17, 2013
Jkt 229001
public notice of this meeting be
announced in the Federal Register.
DATES: Wednesday, February 13, 2013,
2:00 p.m.–4:00 p.m.
ADDRESSES: NNMCAB Conference
Room, 94 Cities of Gold Road, Pojoaque,
NM 87506.
FOR FURTHER INFORMATION CONTACT:
Menice Santistevan, Northern New
Mexico Citizens’ Advisory Board, 94
Cities of Gold Road, Santa Fe, NM
87506. Phone (505) 995–0393; Fax (505)
989–1752 or Email:
msantistevan@doeal.gov.
SUPPLEMENTARY INFORMATION:
Purpose of the Board: The purpose of
the Board is to make recommendations
to DOE–EM and site management in the
areas of environmental restoration,
waste management, and related
activities.
Purpose of the Environmental
Monitoring, Surveillance and
Remediation Committee (EMS&R): The
EMS&R Committee provides a citizens’
perspective to NNMCAB on current and
future environmental remediation
activities resulting from historical Los
Alamos National Laboratory operations
and, in particular, issues pertaining to
groundwater, surface water and work
required under the New Mexico
Environment Department Order on
Consent. The EMS&R Committee will
keep abreast of DOE–EM and site
programs and plans. The committee will
work with the NNMCAB to provide
assistance in determining priorities and
the best use of limited funds and time.
Formal recommendations will be
proposed when needed and, after
consideration and approval by the full
NNMCAB, may be sent to DOE–EM for
action.
Purpose of the Waste Management
(WM) Committee: The WM Committee
reviews policies, practices and
procedures, existing and proposed, so as
to provide recommendations, advice,
suggestions and opinions to the
NNMCAB regarding waste management
operations at the Los Alamos site.
Tentative Agenda
1. Approval of Agenda
2. Approval of Minutes of January 9,
2013
3. Old Business
4. New Business
5. Update from Executive Committee—
Carlos Valdez, Chair
6. Update from DOE—Ed Worth, Deputy
Designated Federal Officer
7. 2:45 p.m. Presentation by Andrew
Green, Los Alamos National
Security
• Air Monitoring at the Los Alamos
National Laboratory and
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Surrounding Sites
8. 3:45 p.m. Public Comment Period
9. 4:00 p.m. Adjourn
Public Participation: The NNMCAB’s
EMS&R and WM Committees welcome
the attendance of the public at their
combined committee meeting and will
make every effort to accommodate
persons with physical disabilities or
special needs. If you require special
accommodations due to a disability,
please contact Menice Santistevan at
least seven days in advance of the
meeting at the telephone number listed
above. Written statements may be filed
with the Committees either before or
after the meeting. Individuals who wish
to make oral statements pertaining to
agenda items should contact Menice
Santistevan at the address or telephone
number listed above. Requests must be
received five days prior to the meeting
and reasonable provision will be made
to include the presentation in the
agenda. The Deputy Designated Federal
Officer is empowered to conduct the
meeting in a fashion that will facilitate
the orderly conduct of business.
Individuals wishing to make public
comments will be provided a maximum
of five minutes to present their
comments.
Minutes: Minutes will be available by
writing or calling Menice Santistevan at
the address or phone number listed
above. Minutes and other Board
documents are on the Internet at:
https://www.nnmcab.energy.gov/.
Issued at Washington, DC on January 14,
2013.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2013–01038 Filed 1–17–13; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC13–49–000.
Applicants: Central Maine Power
Company, Maine Electric Power
Company.
Description: Central Maine Power
Company and Maine Electric Power
Company submit clarification to the
November 30, 2012 Application for
Authorization Under Section 203.
Filed Date: 1/4/13.
Accession Number: 20130104–5124.
Comments Due: 5 p.m. ET 1/18/13.
E:\FR\FM\18JAN1.SGM
18JAN1
mstockstill on DSK4VPTVN1PROD with
Federal Register / Vol. 78, No. 13 / Friday, January 18, 2013 / Notices
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2331–015;
ER10–2343–015; ER10–2319–014;
ER10–2320–014; ER10–2317–013;
ER10–2322–015; ER10–2324–014;
ER10–2325–013; ER10–2332–014;
ER10–2326–015; ER10–2327–016;
ER10–2328–014; ER11–4609–013;
ER10–2330–015.
Applicants: J.P. Morgan Ventures
Energy Corporation, J.P. Morgan
Commodities Canada Corporation, BE
Alabama LLC, BE Allegheny LLC, BE
CA LLC, BE Ironwood LLC, BE KJ LLC,
BE Louisiana LLC, BE Rayle LLC, Cedar
Brakes I, L.L.C., Cedar Brakes II, L.L.C.,
Central Power & Lime LLC, Triton
Power Michigan LLC, Utility Contract
Funding, L.L.C.
Description: JPMorgan Sellers Notice
of Non-Material Change in Status re:
Chisholm View Wind.
Filed Date: 1/11/13.
Accession Number: 20130111–5002.
Comments Due: 5 p.m. ET 2/1/13.
Docket Numbers: ER13–587–001.
Applicants: Carson Cogeneration
Company LP.
Description: Amended Application
for Order Accepting Initial MBR Tariff
to be effective 2/1/2013.
Filed Date: 1/10/13.
Accession Number: 20130110–5113.
Comments Due: 5 p.m. ET 1/31/13.
Docket Numbers: ER13–746–000.
Applicants: Bruce Power Inc.
Description: 2nd Revised MBR to be
effective 1/11/2013.
Filed Date: 1/10/13.
Accession Number: 20130110–5120.
Comments Due: 5 p.m. ET 1/31/13.
Docket Numbers: ER13–747–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Queue Position S–007,
S–008, S–009, S–010; Original SA No.
3479 to be effective 12/11/2012.
Filed Date: 1/10/13.
Accession Number: 20130110–5126.
Comments Due: 5 p.m. ET 1/31/13.
Docket Numbers: ER13–748–000.
Applicants: Southern California
Edison Company.
Description: Transmission
Reassignment Tariff to be effective 1/12/
2013.
Filed Date: 1/11/13.
Accession Number: 20130111–5000.
Comments Due: 5 p.m. ET 2/1/13.
Docket Number: ER13–749–000.
Applicants: Mega Energy of New
England, LLC.
Description: Mega Energy of New
England, LLC submits tariff filing per
35.12: Baseline New to be effective 3/7/
2013.
VerDate Mar<15>2010
16:52 Jan 17, 2013
Jkt 229001
Filed Date: 1/11/13.
Accession Number: 20130111–5053.
Comments Due: 5 p.m. ET 2/1/13.
Docket Numbers: ER13–750–000.
Applicants: New England Power Pool
Participants Committee, ISO New
England Inc.
Description: New England Power Pool
Participants Committee submits tariff
filing per 35.13(a)(2)(iii: Information
Policy to be effective 3/13/2013.
Filed Date: 1/11/13.
Accession Number: 20130111–5054.
Comments Due: 5 p.m. ET 2/1/13.
Docket Numbers: ER13–751–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: 2013–01–11 MDU
Attachment O and GG to be effective 1/
1/2013.
Filed Date: 1/11/13.
Accession Number: 20130111–5115.
Comments Due: 5 p.m. ET 2/1/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 11, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–00982 Filed 1–17–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–277–001.
Applicants: DTE Electric Company.
Description: Deficiency Filing to be
effective 1/1/2013.
Filed Date: 1/10/13.
Accession Number: 20130110–5035.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
4141
Comments Due: 5 p.m. ET 1/31/13.
Docket Numbers: ER13–737–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Notice of Cancellation of
Second Revised SA Nos. 3154 and
3155—ER12–2503–000 to be effective
11/27/2012.
Filed Date: 1/10/13.
Accession Number: 20130110–5025.
Comments Due: 5 p.m. ET 1/31/13.
Docket Numbers: ER13–738–000.
Applicants: DTE Electric Company.
Description: Notice of Succession to
be effective 1/1/2013.
Filed Date: 1/10/13.
Accession Number: 20130110–5044.
Comments Due: 5 p.m. ET 1/31/13.
Docket Numbers: ER13–739–000.
Applicants: Texpo Power, LP.
Description: New filing 1 to be
effective 1/11/2013.
Filed Date: 1/10/13.
Accession Number: 20130110–5045.
Comments Due: 5 p.m. ET 1/31/13.
Docket Numbers: ER13–740–000.
Applicants: EnerPenn USA LLC.
Description: New Filing 1 to be
effective 1/11/2013.
Filed Date: 1/10/13.
Accession Number: 20130110–5046.
Comments Due: 5 p.m. ET 1/31/13.
Docket Numbers: ER13–741–000.
Applicants: Bangor Hydro Electric
Company, ISO New England Inc.
Description: Bangor Hydro Electric
Company submits tariff filing per
35.13(a)(2)(iii: Oakfield Large Generator
Interconnection Agreement to be
effective 3/2/2013.
Filed Date: 1/10/13.
Accession Number: 20130110–5055.
Comments Due: 5 p.m. ET 1/31/13.
Docket Numbers: ER13–742–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits tariff filing per
35.13(a)(2)(iii: 2513 Generation Energy,
Inc. GIA to be effective 12/14/2012.
Filed Date: 1/10/13.
Accession Number: 20130110–5058.
Comments Due: 5 p.m. ET 1/31/13.
Docket Numbers: ER13–743–000.
Applicants: PacifiCorp.
Description: PacifiCorp submits tariff
filing per 35.15: Termination of BPA
Umpqua Business Center Construction
Agreement to be effective 3/14/2013.
Filed Date: 1/10/13.
Accession Number: 20130110–5060.
Comments Due: 5 p.m. ET 1/31/13.
Docket Numbers: ER13–744–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits tariff filing per
E:\FR\FM\18JAN1.SGM
18JAN1
Agencies
[Federal Register Volume 78, Number 13 (Friday, January 18, 2013)]
[Notices]
[Pages 4140-4141]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-00982]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC13-49-000.
Applicants: Central Maine Power Company, Maine Electric Power
Company.
Description: Central Maine Power Company and Maine Electric Power
Company submit clarification to the November 30, 2012 Application for
Authorization Under Section 203.
Filed Date: 1/4/13.
Accession Number: 20130104-5124.
Comments Due: 5 p.m. ET 1/18/13.
[[Page 4141]]
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2331-015; ER10-2343-015; ER10-2319-014; ER10-
2320-014; ER10-2317-013; ER10-2322-015; ER10-2324-014; ER10-2325-013;
ER10-2332-014; ER10-2326-015; ER10-2327-016; ER10-2328-014; ER11-4609-
013; ER10-2330-015.
Applicants: J.P. Morgan Ventures Energy Corporation, J.P. Morgan
Commodities Canada Corporation, BE Alabama LLC, BE Allegheny LLC, BE CA
LLC, BE Ironwood LLC, BE KJ LLC, BE Louisiana LLC, BE Rayle LLC, Cedar
Brakes I, L.L.C., Cedar Brakes II, L.L.C., Central Power & Lime LLC,
Triton Power Michigan LLC, Utility Contract Funding, L.L.C.
Description: JPMorgan Sellers Notice of Non-Material Change in
Status re: Chisholm View Wind.
Filed Date: 1/11/13.
Accession Number: 20130111-5002.
Comments Due: 5 p.m. ET 2/1/13.
Docket Numbers: ER13-587-001.
Applicants: Carson Cogeneration Company LP.
Description: Amended Application for Order Accepting Initial MBR
Tariff to be effective 2/1/2013.
Filed Date: 1/10/13.
Accession Number: 20130110-5113.
Comments Due: 5 p.m. ET 1/31/13.
Docket Numbers: ER13-746-000.
Applicants: Bruce Power Inc.
Description: 2nd Revised MBR to be effective 1/11/2013.
Filed Date: 1/10/13.
Accession Number: 20130110-5120.
Comments Due: 5 p.m. ET 1/31/13.
Docket Numbers: ER13-747-000.
Applicants: PJM Interconnection, L.L.C.
Description: Queue Position S-007, S-008, S-009, S-010; Original SA
No. 3479 to be effective 12/11/2012.
Filed Date: 1/10/13.
Accession Number: 20130110-5126.
Comments Due: 5 p.m. ET 1/31/13.
Docket Numbers: ER13-748-000.
Applicants: Southern California Edison Company.
Description: Transmission Reassignment Tariff to be effective 1/12/
2013.
Filed Date: 1/11/13.
Accession Number: 20130111-5000.
Comments Due: 5 p.m. ET 2/1/13.
Docket Number: ER13-749-000.
Applicants: Mega Energy of New England, LLC.
Description: Mega Energy of New England, LLC submits tariff filing
per 35.12: Baseline New to be effective 3/7/2013.
Filed Date: 1/11/13.
Accession Number: 20130111-5053.
Comments Due: 5 p.m. ET 2/1/13.
Docket Numbers: ER13-750-000.
Applicants: New England Power Pool Participants Committee, ISO New
England Inc.
Description: New England Power Pool Participants Committee submits
tariff filing per 35.13(a)(2)(iii: Information Policy to be effective
3/13/2013.
Filed Date: 1/11/13.
Accession Number: 20130111-5054.
Comments Due: 5 p.m. ET 2/1/13.
Docket Numbers: ER13-751-000.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: 2013-01-11 MDU Attachment O and GG to be effective 1/
1/2013.
Filed Date: 1/11/13.
Accession Number: 20130111-5115.
Comments Due: 5 p.m. ET 2/1/13.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 11, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-00982 Filed 1-17-13; 8:45 am]
BILLING CODE 6717-01-P