Drawbridge Operation Regulations; Atlantic Intracoastal Waterway and Biscayne Bay, Miami, FL, 4070 [2013-00972]
Download as PDF
4070
Federal Register / Vol. 78, No. 13 / Friday, January 18, 2013 / Rules and Regulations
approved by their Design Approval
Primary Inspection Agency (DAPIA).
(2) Truss designs that are qualified but
not in production are not subject to
follow-up testing until produced. When
the truss design is brought into
production, a follow-up test is to be
performed if the truss design has been
out of production for more than 6
months.
(3) The frequency of truss
manufacturer’s quality control followup testing for trusses must be at least:
(i) One test for the first 100 trusses
produced, with a subsequent test for
every 2,500 trusses for trusses qualified
under the proof load truss test
procedure or inverted uplift test
procedure for trusses used in Wind
Zones II and III or once every 6 months,
whichever is more frequent, for every
truss design produced; or
(ii) One test for every 4,000 trusses
produced for trusses qualified under the
ultimate load truss test procedure or
upright uplift test procedure for trusses
used in Wind Zones II and III or once
every 6 months, whichever is more
frequent, for every truss design
produced.
(4) For follow-up testing only, the full
dead load may be applied to the top
chord of the truss, when the bottom
chord dead load is 5 psf or less.
Dated: January 8, 2013.
Carol J. Galante,
Assistant Secretary for Housing—Federal
Housing Commissioner.
[FR Doc. 2013–01066 Filed 1–17–13; 8:45 am]
BILLING CODE 4210–67–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0007]
Drawbridge Operation Regulations;
Atlantic Intracoastal Waterway and
Biscayne Bay, Miami, FL
Coast Guard, DHS.
ACTION: Notice of temporary deviations
from regulations.
AGENCY:
The Coast Guard has issued
temporary deviations from the
regulations governing the operation of
the following two bridges in Miami,
Florida: The Venetian Causeway Bridge
(West), mile 1088.6, across the Atlantic
Intracoastal Waterway; and the Venetian
Causeway Bridge (East), across Biscayne
Bay. The deviations are necessary due to
the high volume of vessel and vehicle
emcdonald on DSK67QTVN1PROD with
SUMMARY:
VerDate Mar<15>2010
14:08 Jan 17, 2013
Jkt 229001
traffic anticipated during the Miami
International Boat Show, which will be
held in Miami Beach, Florida from
February 11, 2013, through February 19,
2013. These deviations will result in the
bridges opening to navigation on the
hour and half-hour before, during, and
after the Miami International Boat
Show.
DATES: These deviations are effective
from 7 a.m. on February 11, 2013,
through 9 p.m. on February 19, 2013.
ADDRESSES: The docket for this
temporary deviation, USCG–2013–0007,
is available online by going to https://
www.regulations.gov, inserting USCG–
2013–0007 in the ‘‘Search’’ box and
then clicking ‘‘Search’’. The docket is
also available for inspection or copying
at the Docket Management Facility (M–
30), U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Jessica Hopkins,
Seventh District Bridge Branch, Coast
Guard; telephone (305) 415–6744, email
Jessica.R.Hopkins@uscg.mil. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone (202)
366–9826.
SUPPLEMENTARY INFORMATION: The
Miami International Boat Show
Operations Manager has requested
temporary modifications to the
operating schedules of the Venetian
Causeway Bridge (West) and the
Venetian Causeway Bridge (East) in
Miami, Florida. These deviations will
result in the bridges being allowed to
open on the hour and half-hour from 7
a.m. to 9 p.m. daily, from February 11,
2013, through February 19, 2013. The
Miami International Boat Show
generates a high volume of vessel and
vehicle traffic. In previous years,
opening these bridges on demand has
resulted in significant vehicle
congestion and bridge mechanical
failure. By opening the bridges on the
hour and half-hour (rather than on
demand) traffic congestion will be
reduced. The temporary deviations will
be effective from 7 a.m. on February 11,
2013 through 9 p.m. on February 19,
2013.
The vertical clearance, regular
operating schedule, and deviation
period for each bridge are set forth
below.
1. Venetian Causeway Bridge (West),
mile 1088.6. The vertical clearance of
the Venetian Causeway Bridge (West),
PO 00000
Frm 00056
Fmt 4700
Sfmt 9990
across the Atlantic Intracoastal
Waterway is 12 feet. The normal
operating schedule is set forth in 33 CFR
117.261(nn), which requires the bridge
to open on signal; except that from 7
a.m. to 7 p.m., Monday through Friday,
except Federal holidays, the bridge need
only open on the hour and half-hour.
As a result of this temporary
deviation, the Venetian Causeway
Bridge (West) will only open to
navigation on the hour and half-hour
from 7 a.m. until 9 p.m. daily, from
February 11, 2013, through February 19,
2013. At all other times the bridges will
open on demand. The bridge will also
continue to open as necessary, in
accordance with 33 CFR 117.31.
2. Venetian Causeway Bridge (East).
The vertical clearance of the Venetian
Causeway Bridge (East), across Biscayne
Bay is 6 feet. The normal operating
schedule is set forth in 33 CFR 117.269,
which requires the bridge to open on
signal; except that from 7 a.m. to 7 p.m.,
Monday through Friday, except Federal
holidays, the bridge need only open on
the hour and half-hour.
As a result of this temporary
deviation, the Venetian Causeway
Bridge (East) will only open to
navigation on the hour and half-hour
from 7 a.m. until 9 p.m. daily, from
February 11, 2013, through February 19,
2013. At all other times the bridges will
open on demand. The bridge will also
continue to open as necessary, in
accordance with 33 CFR 117.31.
In accordance with 33 CFR 117.35(e),
these drawbridges must return to their
regular operating schedules
immediately at the end of the effective
period of this temporary deviation.
These deviations from the operating
regulations are authorized under 33 CFR
117.35.
Dated: January 8, 2013.
B. L. Dragon,
Bridge Program Director, Seventh Coast
Guard District.
[FR Doc. 2013–00972 Filed 1–17–13; 8:45 am]
BILLING CODE P
E:\FR\FM\18JAR1.SGM
18JAR1
Agencies
[Federal Register Volume 78, Number 13 (Friday, January 18, 2013)]
[Rules and Regulations]
[Page 4070]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-00972]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-0007]
Drawbridge Operation Regulations; Atlantic Intracoastal Waterway
and Biscayne Bay, Miami, FL
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviations from regulations.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued temporary deviations from the
regulations governing the operation of the following two bridges in
Miami, Florida: The Venetian Causeway Bridge (West), mile 1088.6,
across the Atlantic Intracoastal Waterway; and the Venetian Causeway
Bridge (East), across Biscayne Bay. The deviations are necessary due to
the high volume of vessel and vehicle traffic anticipated during the
Miami International Boat Show, which will be held in Miami Beach,
Florida from February 11, 2013, through February 19, 2013. These
deviations will result in the bridges opening to navigation on the hour
and half-hour before, during, and after the Miami International Boat
Show.
DATES: These deviations are effective from 7 a.m. on February 11, 2013,
through 9 p.m. on February 19, 2013.
ADDRESSES: The docket for this temporary deviation, USCG-2013-0007, is
available online by going to https://www.regulations.gov, inserting
USCG-2013-0007 in the ``Search'' box and then clicking ``Search''. The
docket is also available for inspection or copying at the Docket
Management Facility (M-30), U.S. Department of Transportation, West
Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Jessica Hopkins, Seventh District
Bridge Branch, Coast Guard; telephone (305) 415-6744, email
Jessica.R.Hopkins@uscg.mil. If you have questions on viewing the
docket, call Renee V. Wright, Program Manager, Docket Operations,
telephone (202) 366-9826.
SUPPLEMENTARY INFORMATION: The Miami International Boat Show Operations
Manager has requested temporary modifications to the operating
schedules of the Venetian Causeway Bridge (West) and the Venetian
Causeway Bridge (East) in Miami, Florida. These deviations will result
in the bridges being allowed to open on the hour and half-hour from 7
a.m. to 9 p.m. daily, from February 11, 2013, through February 19,
2013. The Miami International Boat Show generates a high volume of
vessel and vehicle traffic. In previous years, opening these bridges on
demand has resulted in significant vehicle congestion and bridge
mechanical failure. By opening the bridges on the hour and half-hour
(rather than on demand) traffic congestion will be reduced. The
temporary deviations will be effective from 7 a.m. on February 11, 2013
through 9 p.m. on February 19, 2013.
The vertical clearance, regular operating schedule, and deviation
period for each bridge are set forth below.
1. Venetian Causeway Bridge (West), mile 1088.6. The vertical
clearance of the Venetian Causeway Bridge (West), across the Atlantic
Intracoastal Waterway is 12 feet. The normal operating schedule is set
forth in 33 CFR 117.261(nn), which requires the bridge to open on
signal; except that from 7 a.m. to 7 p.m., Monday through Friday,
except Federal holidays, the bridge need only open on the hour and
half-hour.
As a result of this temporary deviation, the Venetian Causeway
Bridge (West) will only open to navigation on the hour and half-hour
from 7 a.m. until 9 p.m. daily, from February 11, 2013, through
February 19, 2013. At all other times the bridges will open on demand.
The bridge will also continue to open as necessary, in accordance with
33 CFR 117.31.
2. Venetian Causeway Bridge (East). The vertical clearance of the
Venetian Causeway Bridge (East), across Biscayne Bay is 6 feet. The
normal operating schedule is set forth in 33 CFR 117.269, which
requires the bridge to open on signal; except that from 7 a.m. to 7
p.m., Monday through Friday, except Federal holidays, the bridge need
only open on the hour and half-hour.
As a result of this temporary deviation, the Venetian Causeway
Bridge (East) will only open to navigation on the hour and half-hour
from 7 a.m. until 9 p.m. daily, from February 11, 2013, through
February 19, 2013. At all other times the bridges will open on demand.
The bridge will also continue to open as necessary, in accordance with
33 CFR 117.31.
In accordance with 33 CFR 117.35(e), these drawbridges must return
to their regular operating schedules immediately at the end of the
effective period of this temporary deviation. These deviations from the
operating regulations are authorized under 33 CFR 117.35.
Dated: January 8, 2013.
B. L. Dragon,
Bridge Program Director, Seventh Coast Guard District.
[FR Doc. 2013-00972 Filed 1-17-13; 8:45 am]
BILLING CODE P