Northwest Pipeline GP; Notice of Availability of the Environmental Assessment for the Proposed South Seattle Delivery Lateral Expansion Project, 2982 [2013-00645]
Download as PDF
2982
Federal Register / Vol. 78, No. 10 / Tuesday, January 15, 2013 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–471–000]
srobinson on DSK4SPTVN1PROD with
Northwest Pipeline GP; Notice of
Availability of the Environmental
Assessment for the Proposed South
Seattle Delivery Lateral Expansion
Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
South Seattle Delivery Lateral
Expansion Project, proposed by
Northwest Pipeline GP (Northwest) in
the above-referenced docket. Northwest
requests authorization to upgrade 4.0
miles of natural gas pipeline from 10- to
16-inch-diameter in King County,
Washington, which would increase its
natural gas transportation capacity by
74,850 dekatherms per day in the south
Seattle market area.
The EA assesses the potential
environmental effects of the
construction and operation of the South
Seattle Delivery Lateral Expansion
Project in accordance with the
requirements of the National
Environmental Policy Act. The FERC
staff concludes that approval of the
proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The FERC staff mailed copies of the
EA to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
newspapers and libraries in the project
area; and parties to this proceeding.
In addition, the EA is available for
public viewing on the FERC’s Web site
(www.ferc.gov) using the eLibrary link.
A limited number of copies of the EA
are available for distribution and public
inspection at: Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street NE., Room 2A,
Washington, DC 20426, (202) 502–8371.
Any person wishing to comment on
the EA may do so. Your comments
should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
VerDate Mar<15>2010
17:00 Jan 14, 2013
Jkt 229001
making its decision on this project, it is
important that we receive your
comments in Washington, DC on or
before February 8, 2013.
For your convenience, there are three
methods you can use to file your
comments to the Commission. In all
instances, please reference the project
docket number (CP12–471–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
Any person seeking to become a party
to the proceeding must file a motion to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214).1 Only
intervenors have the right to seek
rehearing of the Commission’s decision.
The Commission grants affected
landowners and others with
environmental concerns intervenor
status upon showing good cause by
stating that they have a clear and direct
interest in this proceeding which no
other party can adequately represent.
Simply filing environmental comments
will not give you intervenor status, but
you do not need intervenor status to
have your comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search,’’ and enter the docket
1 See the previous discussion on the methods for
filing comments.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
number excluding the last three digits in
the Docket Number field (i.e., CP12–
471). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/
esubscribenow.htm.
Dated: January 9, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–00645 Filed 1–14–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AC13–14–000]
Steuben Gas Storage Company
(Steuben); Notice of Filing
Take notice that on October 19, 2012,
Steuben Gas Storage Company (Steuben)
submitted a request for a waiver of the
reporting requirement to file the FERC
Form 2–A for 2012.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 or 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
E:\FR\FM\15JAN1.SGM
15JAN1
Agencies
[Federal Register Volume 78, Number 10 (Tuesday, January 15, 2013)]
[Notices]
[Page 2982]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-00645]
[[Page 2982]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP12-471-000]
Northwest Pipeline GP; Notice of Availability of the
Environmental Assessment for the Proposed South Seattle Delivery
Lateral Expansion Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) for the South
Seattle Delivery Lateral Expansion Project, proposed by Northwest
Pipeline GP (Northwest) in the above-referenced docket. Northwest
requests authorization to upgrade 4.0 miles of natural gas pipeline
from 10- to 16-inch-diameter in King County, Washington, which would
increase its natural gas transportation capacity by 74,850 dekatherms
per day in the south Seattle market area.
The EA assesses the potential environmental effects of the
construction and operation of the South Seattle Delivery Lateral
Expansion Project in accordance with the requirements of the National
Environmental Policy Act. The FERC staff concludes that approval of the
proposed project, with appropriate mitigating measures, would not
constitute a major federal action significantly affecting the quality
of the human environment.
The FERC staff mailed copies of the EA to federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American tribes;
potentially affected landowners and other interested individuals and
groups; newspapers and libraries in the project area; and parties to
this proceeding.
In addition, the EA is available for public viewing on the FERC's
Web site (www.ferc.gov) using the eLibrary link. A limited number of
copies of the EA are available for distribution and public inspection
at: Federal Energy Regulatory Commission, Public Reference Room, 888
First Street NE., Room 2A, Washington, DC 20426, (202) 502-8371.
Any person wishing to comment on the EA may do so. Your comments
should focus on the potential environmental effects, reasonable
alternatives, and measures to avoid or lessen environmental impacts.
The more specific your comments, the more useful they will be. To
ensure that the Commission has the opportunity to consider your
comments prior to making its decision on this project, it is important
that we receive your comments in Washington, DC on or before February
8, 2013.
For your convenience, there are three methods you can use to file
your comments to the Commission. In all instances, please reference the
project docket number (CP12-471-000) with your submission. The
Commission encourages electronic filing of comments and has expert
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for submitting brief,
text-only comments on a project;
(2) You can also file your comments electronically using the
eFiling feature on the Commission's Web site (www.ferc.gov) under the
link to Documents and Filings. With eFiling, you can provide comments
in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426.
Any person seeking to become a party to the proceeding must file a
motion to intervene pursuant to Rule 214 of the Commission's Rules of
Practice and Procedures (18 CFR 385.214).\1\ Only intervenors have the
right to seek rehearing of the Commission's decision. The Commission
grants affected landowners and others with environmental concerns
intervenor status upon showing good cause by stating that they have a
clear and direct interest in this proceeding which no other party can
adequately represent. Simply filing environmental comments will not
give you intervenor status, but you do not need intervenor status to
have your comments considered.
---------------------------------------------------------------------------
\1\ See the previous discussion on the methods for filing
comments.
---------------------------------------------------------------------------
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on ``General Search,'' and enter the docket number
excluding the last three digits in the Docket Number field (i.e., CP12-
471). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/esubscribenow.htm.
Dated: January 9, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-00645 Filed 1-14-13; 8:45 am]
BILLING CODE 6717-01-P