Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information, 3034-3039 [2013-00424]
Download as PDF
3034
Federal Register / Vol. 78, No. 10 / Tuesday, January 15, 2013 / Notices
Dated: January 10, 2013.
George F. Triebsch,
Director, Office of Standards, Regulations and
Variances.
[FR Doc. 2013–00624 Filed 1–14–13; 8:45 am]
BILLING CODE 4510–43–P
NATIONAL COUNCIL ON DISABILITY
Sunshine Act Meetings
The Members of the
National Council on Disability (NCD)
will hold a special meeting of the
Council on Friday, January 11, 2013,
12:00 p.m.–1:00 p.m. (ET).
PLACE: The meeting will occur by
teleconference. Interested parties may
join the meeting by phone in a listeningonly capacity using the following callin number: 1–877–446–3914; passcode
4121872.
MATTERS TO BE CONSIDERED: The Council
will meet to review, discuss, and vote
on a letter of policy recommendations
and concerns to the interagency
taskforce created in the wake of the
Newtown tragedy.
CONTACT PERSON FOR MORE INFORMATION:
Anne Sommers, NCD, 1331 F Street
NW., Suite 850, Washington, DC 20004;
202–272–2004 (V), 202–272–2074
(TTY).
ACCOMMODATIONS: Those who plan to
participate by phone and require
accommodations should notify NCD as
soon as possible to allow time to make
arrangements.
TIME AND DATES:
Dated: January 11, 2013.
Aaron Bishop,
Executive Director.
[FR Doc. 2013–00805 Filed 1–11–13; 4:15 pm]
standing committees, will discuss and
vote on two Medicaid reports (one on
self-direction and one on blockgranting), will discuss the agency’s 2013
progress report, will receive a briefing
from Administrator Craig Fugate of the
Federal Emergency Management Agency
(FEMA) regarding the response to
Hurricane Sandy, as it pertains to
people with disabilities, and will
receive public comment. The times
provided below are approximations for
when each agenda item is anticipated to
be discussed (all times Eastern):
9:00–9:30 a.m. Chairman’s Report,
Executive Director’s Report
9:30–10:30 a.m. Audit and Finance
Committee report, Governance
Committee report
10:30 a.m.–12:00 p.m. Policy and
Program Evaluation Committee
Report (including discussion and
votes on Medicaid reports)
1:15–2:15 p.m. NCD Progress Report
Discussion
2:15–3:15 p.m. Agency briefing with
FEMA Administrator Craig Fugate
3:30–4:00 p.m. Public comment period
Any individuals interested in
providing public comment will be asked
to provide their names and their
organizational affiliations, if applicable,
and to limit their comments to three
minutes. Individuals may also provide
public comment by sending their
comments in writing to Lawrence
Carter-Long, Public Affairs Specialist, at
lcarterlong@ncd.gov, using the subject
line of ‘‘Public Comment.’’
CONTACT PERSON FOR MORE INFORMATION:
BILLING CODE 6820–MA–P
NATIONAL COUNCIL ON DISABILITY
Sunshine Act Meetings Notice
Anne Sommers, NCD, 1331 F Street
NW., Suite 850, Washington, DC 20004;
202–272–2004 (V), 202–272–2074
(TTY).
Those who plan to
attend and require accommodations
should notify NCD as soon as possible
to allow time to make arrangements.
Please note: To help reduce exposure to
fragrances for those with multiple
chemical sensitivities, NCD requests
that all those attending the meeting in
person please refrain from wearing
scented personal care products such as
perfumes, hairsprays, colognes, and
deodorants.
ACCOMMODATIONS:
The Members of the
National Council on Disability (NCD)
will hold a quarterly meeting on
Tuesday, January 29, 2013, 9:00 a.m.–
5:00 p.m. (ET).
PLACE: The meeting will occur at the
Access Board Conference Room, 1331 F
Street, NW., Suite 800, Washington, DC.
Interested parties may join the meeting
in person or may join by phone in a
listening-only capacity (with the
exception of the public comment
period) using the following call-in
number: 1–888–523–1228; passcode
3484831. If asked, the conference call
host’s name is Jonathan Young.
MATTERS TO BE CONSIDERED: The Council
will receive updates from the Council’s
srobinson on DSK4SPTVN1PROD with
TIME AND DATES:
VerDate Mar<15>2010
17:00 Jan 14, 2013
Jkt 229001
Dated: January 10, 2013.
Aaron Bishop,
Executive Director.
PO 00000
Frm 00096
Fmt 4703
Sfmt 4703
Sunshine Act Meeting; Agenda
9:30 a.m., Tuesday,
January 29, 2013.
PLACE: NTSB Conference Center, 429
L’Enfant Plaza SW., Washington, DC
20594.
STATUS: The one item is open to the
public.
MATTER TO BE CONSIDERED:
8371A Aircraft Accident Report—Loss
of Control, Sundance Helicopters,
Inc., Eurocopter AS350–B2, N37SH,
Near Las Vegas, Nevada, December 7,
2011.
NEWS MEDIA CONTACT: Telephone: (202)
314–6100.
The press and public may enter the
NTSB Conference Center one hour prior
to the meeting for set up and seating.
Individuals requesting specific
accommodations should contact
Rochelle Hall at (202) 314–6305 or by
email at Rochelle.Hall@ntsb.gov by
Friday, January 25, 2013.
The public may view the meeting via
a live or archived webcast by accessing
a link under ‘‘News & Events’’ on the
NTSB home page at www.ntsb.gov.
Schedule updates including weatherrelated cancellations are also available
at www.ntsb.gov.
FOR MORE INFORMATION CONTACT: Candi
Bing, (202) 314–6403 or by email at
bingc@ntsb.gov.
FOR MEDIA INFORMATION CONTACT: Peter
Knudson (202) 314–6219 or by email at
peter.knudson@ntsb.gov.
TIME AND DATE:
Dated: January 11, 2013.
Candi R. Bing,
Federal Register Liaison Officer.
[FR Doc. 2013–00822 Filed 1–11–13; 4:15 pm]
BILLING CODE 7533–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–348 and 50–364; NRC–
2012–0309]
Applications and Amendments to
Facility Operating Licenses and
Combined Licenses Involving
Proposed No Significant Hazards
Considerations and Containing
Sensitive Unclassified Non-Safeguards
Information and Order Imposing
Procedures for Access to Sensitive
Unclassified Non-Safeguards
Information
Nuclear Regulatory
Commission.
ACTION: License amendment request;
opportunity to comment, opportunity to
AGENCY:
[FR Doc. 2013–00779 Filed 1–11–13; 11:47 am]
BILLING CODE 6820–MA–P
NATIONAL TRANSPORTATION
SAFETY BOARD
E:\FR\FM\15JAN1.SGM
15JAN1
Federal Register / Vol. 78, No. 10 / Tuesday, January 15, 2013 / Notices
request a hearing and to petition for
leave to intervene; order.
Comments must be filed by
February 14, 2013. Requests for a
hearing or leave to intervene must be
filed by March 18, 2013. Any potential
party as defined in § 2.4 of Title 10 of
the Code of Federal Regulations (10
CFR) who believes access to Sensitive
Unclassified Non-Safeguards
Information is necessary to respond to
this notice must request document
access by January 22, 2013.
ADDRESSES: You may access information
and comment submissions related to
this document, which the NRC
possesses and is publicly available, by
searching on https://www.regulations.gov
under Docket ID NRC–2012–0309. You
may submit comments by any one of the
following methods (unless this
document describes a different method
for submitting comments on a specific
subject):
• Federal rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2012–0309. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–492–3668;
email: Carol.Gallagher@nrc.gov.
• Mail comments to: Cindy Bladey,
Chief, Rules, Announcements, and
Directives Branch (RADB), Office of
Administration, Mail Stop: TWB–05–
B01M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
• Fax comments to: RADB at 301–
492–3446.
For additional direction on accessing
information and submitting comments,
see ‘‘Accessing Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
SUPPLEMENTARY INFORMATION:
DATES:
srobinson on DSK4SPTVN1PROD with
I. Accessing Information and
Submitting Comments
A. Accessing Information
Please refer to Docket ID NRC–2012–
0309 when contacting the NRC about
the availability of information regarding
this document. You may access
information related to this document,
which the NRC possesses and is
publicly available, by any one of the
following methods:
• Federal Rulemaking Web Site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2012–0309.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publicly
available documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
VerDate Mar<15>2010
17:00 Jan 14, 2013
Jkt 229001
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this notice (if
that document is available in ADAMS)
is provided the first time that a
document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC–2012–
0309 in the subject line of your
comment submission, in order to ensure
that the NRC is able to make your
comment submission available to the
public in this docket.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov and enter the
comment submissions into ADAMS,
and the NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
II. Background
Pursuant to Section 189a.(2) of the
Atomic Energy Act of 1954, as amended
(the Act), the NRC is publishing this
notice. The Act requires the
Commission to publish notice of any
amendments issued, or proposed to be
issued and grants the Commission the
authority to issue and make
immediately effective any amendment
to an operating license or combined
license, as applicable, upon a
determination by the Commission that
such amendment involves no significant
hazards consideration, notwithstanding
the pendency before the Commission of
a request for a hearing from any person.
PO 00000
Frm 00097
Fmt 4703
Sfmt 4703
3035
This notice includes notices of
amendments containing sensitive
unclassified non-safeguards information
(SUNSI).
Notice of Consideration of Issuance of
Amendments to Facility Operating
Licenses and Combined Licenses,
Proposed No Significant Hazards
Consideration Determination, and
Opportunity for a Hearing
The Commission has made a
proposed determination that the
following amendment requests involve
no significant hazards consideration.
Under the Commission’s regulations in
§ 50.92, this means that operation of the
facility in accordance with the proposed
amendment would not (1) Involve a
significant increase in the probability or
consequences of an accident previously
evaluated; (2) create the possibility of a
new or different kind of accident from
any accident previously evaluated; or
(3) involve a significant reduction in a
margin of safety. The basis for this
proposed determination for each
amendment request follows.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example,
in derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
Within 60 days after the date of
publication of this notice, any person(s)
whose interest may be affected by this
action may file a request for a hearing
and a petition to intervene with respect
to issuance of the amendment to the
E:\FR\FM\15JAN1.SGM
15JAN1
srobinson on DSK4SPTVN1PROD with
3036
Federal Register / Vol. 78, No. 10 / Tuesday, January 15, 2013 / Notices
subject facility operating license or
combined license. Requests for a
hearing and a petition for leave to
intervene shall be filed in accordance
with the Commission’s ‘‘Agency Rules
of Practice and Procedure’’ in 10 CFR
part 2. Interested person(s) should
consult a current copy of 10 CFR 2.309,
which is available at the NRC’s PDR,
located at One White Flint North, Room
O1–F21, 11555 Rockville Pike (first
floor), Rockville, Maryland 20852. The
NRC regulations are accessible
electronically from the NRC Library on
the NRC Web site at https://www.nrc.gov/
reading-rm/doc-collections/cfr/. If a
request for a hearing or petition for
leave to intervene is filed within 60
days, the Commission or a presiding
officer designated by the Commission or
by the Chief Administrative Judge of the
Atomic Safety and Licensing Board
Panel, will rule on the request and/or
petition; and the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address, and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be issued in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also set forth the specific
contentions which the requestor/
petitioner seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the requestor/petitioner shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the requestor/petitioner
intends to rely in proving the contention
at the hearing. The requestor/petitioner
must also provide references to those
specific sources and documents of
which the petitioner is aware and on
which the requestor/petitioner intends
to rely to establish those facts or expert
VerDate Mar<15>2010
17:00 Jan 14, 2013
Jkt 229001
opinion. The petition must include
sufficient information to show that a
genuine dispute exists with the
applicant on a material issue of law or
fact. Contentions shall be limited to
matters within the scope of the
amendment under consideration. The
contention must be one which, if
proven, would entitle the requestor/
petitioner to relief. A requestor/
petitioner who fails to satisfy these
requirements with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, and the
Commission has not made a final
determination on the issue of no
significant hazards consideration, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, then any hearing held
would take place before the issuance of
any amendment.
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC E-Filing rule
(72 FR 49139, August 28, 2007). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
PO 00000
Frm 00098
Fmt 4703
Sfmt 4703
at 301–415–1677, to request (1) a digital
information (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
apply-certificates.html. System
requirements for accessing the ESubmittal server are detailed in the
NRC’s ‘‘Guidance for Electronic
Submission,’’ which is available on the
agency’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html. Participants may
attempt to use other software not listed
on the Web site, but should note that the
NRC’s E-Filing system does not support
unlisted software, and the NRC Meta
System Help Desk will not be able to
offer assistance in using unlisted
software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E-Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through the Electronic
Information Exchange System, users
will be required to install a Web
browser plug-in from the NRC Web site.
Further information on the Web-based
submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
site at https://www.nrc.gov/site-help/esubmittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with NRC guidance
available on the NRC public Web site at
https://www.nrc.gov/site-help/esubmittals.html. A filing is considered
complete at the time the documents are
submitted through the NRC’s E-Filing
system. To be timely, an electronic
filing must be submitted to the E-Filing
system no later than 11:59 p.m. Eastern
Time on the due date. Upon receipt of
E:\FR\FM\15JAN1.SGM
15JAN1
srobinson on DSK4SPTVN1PROD with
Federal Register / Vol. 78, No. 10 / Tuesday, January 15, 2013 / Notices
a transmission, the E-Filing system
time-stamps the document and sends
the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the agency’s adjudicatory E-Filing
system may seek assistance by
contacting the NRC Meta System Help
Desk through the ‘‘Contact Us’’ link
located on the NRC Web site at https://
www.nrc.gov/site-help/esubmittals.html, by email at
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852, Attention: Rulemaking
and Adjudications Staff. Participants
filing a document in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
VerDate Mar<15>2010
17:00 Jan 14, 2013
Jkt 229001
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/ehd/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. With respect to
copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
Petitions for leave to intervene must
be filed no later than 60 days from the
date of publication of this notice.
Requests for hearing, petitions for leave
to intervene, and motions for leave to
file new or amended contentions that
are filed after the 60-day deadline will
not be entertained absent a
determination by the presiding officer
that the filing demonstrates good cause
by satisfying the following three factors
in 10 CFR 2.309(c)(1): (i) The
information upon which the filing is
based was not previously available; (ii)
the information upon which the filing is
based is materially different from
information previously available; and
(iii) the filing has been submitted in a
timely fashion based on the availability
of the subsequent information.
Southern Nuclear Operating Company,
Inc., Docket Nos. 50–348 and 50–364,
Joseph M. Farley Nuclear Plant, Units 1
and 2, Houston County, Alabama
Date of amendment request: August
20, 2012, as supplemented by letters
dated October 25 and November 8,
2012.
Description of amendment request:
This license amendment request
contains Sensitive Unclassified NonSafeguards Information (SUNSI). The
proposed amendments would revise the
Technical Specification (TS)
surveillance requirement (SR) 3.7.6.1
required water volume for condensate
storage tank (CST) operability from
150,000 to 164,000 gallons.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
PO 00000
Frm 00099
Fmt 4703
Sfmt 4703
3037
consequences of an accident previously
evaluated?
Response: No.
The proposed change would revise TS
3.7.6, ‘‘Condensate Storage Tank (CST),’’ to
revise the CST level requirements specified
in Surveillance Requirement (SR) 3.7.6.1.
The proposed change administratively
increases the volume margin of the CST.
The CST is not an accident initiator and is
credited to mitigate accidents and events.
These changes have no impact on the method
by which the CST performs its functions.
With these changes, a sufficient quantity of
water will continue to be supplied by the
CST to the Auxiliary Feedwater (AFW)
pumps to remove heat from the Reactor
Coolant System (RCS) during a plant event.
With this change, the overall quantity of
water required to meet operability
requirements of SR 3.7.6.1 is increased. This
increase is acceptable, providing increased
CST volume margin and is based on plant
specific CST minimum storage volume
calculations.
This change does not impact any accident
initiators or analyzed events. It does not
impact any assumed mitigation capability for
any accident or transient event. The change
does not involve the addition or removal of
any equipment; however, a design change to
the low level alarm setpoint will be required.
Therefore, operation of the facility in
accordance with the proposed amendment
does not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The CST is not an accident initiator and is
credited to mitigate accidents and events.
These changes have no impact on the method
by which the CST performs its functions.
This change does not involve any physical
modifications to plant structures, systems, or
components (SSCs), or the manner in which
SSCs are maintained, modified, tested, or
inspected. In addition, there is no change in
the types or increases in the amounts of
effluents that may be released offsite, and
there is no increase in individual or
cumulative occupational radiation exposure.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The accident analyses credit CST inventory
to meet RCS design pressure, containment
design pressure, 10 CFR 100 dose limits, and
10 CFR 50.36 peak cladding temperature
limits. The increase in SR 3.7.6.1 CST
required minimum volume increases the CST
volume margin. The CST volume for the
natural circulation cooldown event is greater
than that required to mitigate accidents. The
CST will continue to provide the entire
required source of usable volume of safety
grade water to the AFW System pumps to
remove decay and sensible heat from the
RCS. This change does not involve any
E:\FR\FM\15JAN1.SGM
15JAN1
3038
Federal Register / Vol. 78, No. 10 / Tuesday, January 15, 2013 / Notices
physical modifications to SSCs or the manner
in which SSCs are maintained, modified,
tested, or inspected. However, a design
change to the low level alarm setpoint will
be required. The change does not alter the
manner in which safety limits, limiting safety
system settings, or limiting conditions for
operation are determined. The setpoints at
which protective actions are initiated are not
altered by the change. Therefore, the
proposed change does not involve a
significant reduction in a margin of safety.
Based on the above, SNC concludes that
the proposed amendment does not involve a
significant hazards consideration under the
standards set forth in 10 CFR 50.92(c), and,
accordingly, a finding of ‘‘no significant
hazards consideration’’ is justified.
srobinson on DSK4SPTVN1PROD with
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: M. Stanford
Blanton, Esq., Balch and Bingham, Post
Office Box 306, 1710 Sixth Avenue
North, Birmingham, Alabama 35201.
NRC Branch Chief: Robert J.
Pascarelli.
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information for Contention
Preparation
A. This Order contains instructions
regarding how potential parties to this
proceeding may request access to
documents containing Sensitive
Unclassified Non-Safeguards
Information (SUNSI).
B. Within 10 days after publication of
this notice of hearing and opportunity to
petition for leave to intervene, any
potential party who believes access to
SUNSI is necessary to respond to this
notice may request such access. A
‘‘potential party’’ is any person who
intends to participate as a party by
demonstrating standing and filing an
admissible contention under 10 CFR
2.309. Requests for access to SUNSI
submitted later than 10 days after
publication will not be considered
absent a showing of good cause for the
late filing, addressing why the request
could not have been filed earlier.
C. The requestor shall submit a letter
requesting permission to access SUNSI
to the Office of the Secretary, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and provide a copy to the Associate
General Counsel for Hearings,
Enforcement and Administration, Office
of the General Counsel, Washington, DC
20555–0001. The expedited delivery or
VerDate Mar<15>2010
17:00 Jan 14, 2013
Jkt 229001
courier mail address for both offices is:
U.S. Nuclear Regulatory Commission,
11555 Rockville Pike, Rockville,
Maryland 20852. The email address for
the Office of the Secretary and the
Office of the General Counsel are
Hearing.Docket@nrc.gov and
OGCmailcenter@nrc.gov, respectively.1
The request must include the following
information:
(1) A description of the licensing
action with a citation to this Federal
Register notice;
(2) The name and address of the
potential party and a description of the
potential party’s particularized interest
that could be harmed by the action
identified in C.(1); and
(3) The identity of the individual or
entity requesting access to SUNSI and
the requestor’s basis for the need for the
information in order to meaningfully
participate in this adjudicatory
proceeding. In particular, the request
must explain why publicly available
versions of the information requested
would not be sufficient to provide the
basis and specificity for a proffered
contention.
D. Based on an evaluation of the
information submitted under paragraph
C.(3) the NRC staff will determine
within 10 days of receipt of the request
whether:
(1) There is a reasonable basis to
believe the petitioner is likely to
establish standing to participate in this
NRC proceeding; and
(2) The requestor has established a
legitimate need for access to SUNSI.
E. If the NRC staff determines that the
requestor satisfies both D.(1) and D.(2)
above, the NRC staff will notify the
requestor in writing that access to
SUNSI has been granted. The written
notification will contain instructions on
how the requestor may obtain copies of
the requested documents, and any other
conditions that may apply to access to
those documents. These conditions may
include, but are not limited to, the
signing of a Non-Disclosure Agreement
or Affidavit, or Protective Order 2 setting
forth terms and conditions to prevent
the unauthorized or inadvertent
disclosure of SUNSI by each individual
who will be granted access to SUNSI.
1 While a request for hearing or petition to
intervene in this proceeding must comply with the
filing requirements of the NRC’s ‘‘E-Filing Rule,’’
the initial request to access SUNSI under these
procedures should be submitted as described in this
paragraph.
2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must
be filed with the presiding officer or the Chief
Administrative Judge if the presiding officer has not
yet been designated, within 30 days of the deadline
for the receipt of the written access request.
PO 00000
Frm 00100
Fmt 4703
Sfmt 4703
F. Filing of Contentions. Any
contentions in these proceedings that
are based upon the information received
as a result of the request made for
SUNSI must be filed by the requestor no
later than 25 days after the requestor is
granted access to that information.
However, if more than 25 days remain
between the date the petitioner is
granted access to the information and
the deadline for filing all other
contentions (as established in the notice
of hearing or opportunity for hearing),
the petitioner may file its SUNSI
contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI
is denied by the NRC staff after a
determination on standing and need for
access, the NRC staff shall immediately
notify the requestor in writing, briefly
stating the reason or reasons for the
denial.
(2) The requestor may challenge the
NRC staff’s adverse determination by
filing a challenge within 5 days of
receipt of that determination with: (a)
The presiding officer designated in this
proceeding; (b) if no presiding officer
has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an administrative law judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
been designated to rule on information
access issues, with that officer.
H. Review of Grants of Access. A
party other than the requestor may
challenge an NRC staff determination
granting access to SUNSI whose release
would harm that party’s interest
independent of the proceeding. Such a
challenge must be filed with the Chief
Administrative Judge within 5 days of
the notification by the NRC staff of its
grant of access.
If challenges to the NRC staff
determinations are filed, these
procedures give way to the normal
process for litigating disputes
concerning access to information. The
availability of interlocutory review by
the Commission of orders ruling on
such NRC staff determinations (whether
granting or denying access) is governed
by 10 CFR 2.311.3
I. The Commission expects that the
NRC staff and presiding officers (and
any other reviewing officers) will
consider and resolve requests for access
to SUNSI, and motions for protective
3 Requestors should note that the filing
requirements of the NRC’s E-Filing Rule (72 FR
49139; August 28, 2007) apply to appeals of NRC
staff determinations (because they must be served
on a presiding officer or the Commission, as
applicable), but not to the initial SUNSI request
submitted to the NRC staff under these procedures.
E:\FR\FM\15JAN1.SGM
15JAN1
Federal Register / Vol. 78, No. 10 / Tuesday, January 15, 2013 / Notices
orders, in a timely fashion in order to
minimize any unnecessary delays in
identifying those petitioners who have
standing and who have propounded
contentions meeting the specificity and
basis requirements in 10 CFR part 2.
Attachment 1 to this Order summarizes
the general target schedule for
processing and resolving requests under
these procedures.
It Is So Ordered.
Dated at Rockville, Maryland, this 7th day
of January 2013.
3039
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
ATTACHMENT 1—General Target Schedule
for Processing and Resolving Requests for
Access to Sensitive Unclassified NonSafeguards Information in This Proceeding
Day
Event/activity
0 ...............
Publication of Federal Register notice of hearing and opportunity to petition for leave to intervene, including order with instructions
for access requests.
Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) with information: supporting the standing of a potential party identified by name and address; describing the need for the information in order for the
potential party to participate meaningfully in an adjudicatory proceeding.
Deadline for submitting petition for intervention containing: (i) demonstration of standing; (ii) all contentions whose formulation does
not require access to SUNSI (+25 Answers to petition for intervention; +7 requestor/petitioner reply).
Nuclear Regulatory Commission (NRC) staff informs the requestor of the staff’s determination whether the request for access provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff also informs any party
to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff
makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of
redactions or review of redacted documents).
If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for requestor/petitioner to file a motion seeking a ruling to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer (or Chief Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the deadline for any party to the
proceeding whose interest independent of the proceeding would be harmed by the release of the information to file a motion
seeking a ruling to reverse the NRC staff’s grant of access.
Deadline for NRC staff reply to motions to reverse NRC staff determination(s).
(Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and file
motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure Agreement
for SUNSI.
If access granted: Issuance of presiding officer or other designated officer decision on motion for protective order for access to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a final adverse
determination by the NRC staff.
Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective
order.
Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than 25 days remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions by that later deadline.
(Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI.
(Answer receipt +7) Petitioner/Intervenor reply to answers.
Decision on contention admission.
10 .............
60 .............
20 .............
25 .............
30 .............
40 .............
A ..............
A + 3 ........
A + 28 ......
A + 53 ......
A + 60 ......
>A + 60 ....
[FR Doc. 2013–00424 Filed 1–10–13; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2012–0261]
Japan Lessons-Learned Project
Directorate Interim Staff Guidance
JLD–ISG–2012–06; Performing a
Tsunami, Surge, or Seiche Hazard
Assessment
Nuclear Regulatory
Commission.
ACTION: Japan Lessons-Learned Project
Directorate Interim Staff Guidance;
issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing the Final
Japan Lessons-Learned Project
Directorate Interim Staff Guidance (JLD–
ISG), JLD–ISG–2012–06, ‘‘Performing a
Tsunami, Surge, or Seiche Hazard
Assessment’’ (Agencywide Documents
srobinson on DSK4SPTVN1PROD with
SUMMARY:
VerDate Mar<15>2010
17:00 Jan 14, 2013
Jkt 229001
Access and Management System
(ADAMS) Accession No.
ML12314A412). This JLD–ISG provides
guidance and clarification to assist
nuclear power reactors applicants and
licensees with the flooding hazard
reassessment in response to Enclosure 2
of the NRC staff’s request for
information, ‘‘Request for Information
Pursuant to section 50.54(f) of Title 10
of the Code of Federal Regulations (10
CFR), Regarding Recommendations 2.1,
2.3, and 9.3 of the Near-Term Task
Force Review of Insights from the
Fukushima Dai-ichi Accident,’’ dated
March 12, 2012 (ADAMS Accession No.
ML12053A340).
ADDRESSES: Please refer to Docket ID
NRC–2012–0261 when contacting the
NRC about the availability of
information regarding this document.
You may access information related to
this document, which the NRC
possesses and are publicly-available,
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
PO 00000
Frm 00101
Fmt 4703
Sfmt 4703
for Docket ID NRC–2012–0261. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–492–3668;
email: Carol.Gallagher@nrc.gov.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publiclyavailable documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
JLD–ISG–2012–06 is available under
ADAMS Accession No. ML12314A412.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, MD 20852.
• NRC’s Interim Staff Guidance Web
Site: Go to https://www.nrc.gov/readingrm/doc-collections/isg/japan-lessons-
E:\FR\FM\15JAN1.SGM
15JAN1
Agencies
[Federal Register Volume 78, Number 10 (Tuesday, January 15, 2013)]
[Notices]
[Pages 3034-3039]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-00424]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-348 and 50-364; NRC-2012-0309]
Applications and Amendments to Facility Operating Licenses and
Combined Licenses Involving Proposed No Significant Hazards
Considerations and Containing Sensitive Unclassified Non-Safeguards
Information and Order Imposing Procedures for Access to Sensitive
Unclassified Non-Safeguards Information
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment request; opportunity to comment, opportunity
to
[[Page 3035]]
request a hearing and to petition for leave to intervene; order.
-----------------------------------------------------------------------
DATES: Comments must be filed by February 14, 2013. Requests for a
hearing or leave to intervene must be filed by March 18, 2013. Any
potential party as defined in Sec. 2.4 of Title 10 of the Code of
Federal Regulations (10 CFR) who believes access to Sensitive
Unclassified Non-Safeguards Information is necessary to respond to this
notice must request document access by January 22, 2013.
ADDRESSES: You may access information and comment submissions related
to this document, which the NRC possesses and is publicly available, by
searching on https://www.regulations.gov under Docket ID NRC-2012-0309.
You may submit comments by any one of the following methods (unless
this document describes a different method for submitting comments on a
specific subject):
Federal rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2012-0309. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-492-
3668; email: Carol.Gallagher@nrc.gov.
Mail comments to: Cindy Bladey, Chief, Rules,
Announcements, and Directives Branch (RADB), Office of Administration,
Mail Stop: TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
Fax comments to: RADB at 301-492-3446.
For additional direction on accessing information and submitting
comments, see ``Accessing Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
SUPPLEMENTARY INFORMATION:
I. Accessing Information and Submitting Comments
A. Accessing Information
Please refer to Docket ID NRC-2012-0309 when contacting the NRC
about the availability of information regarding this document. You may
access information related to this document, which the NRC possesses
and is publicly available, by any one of the following methods:
Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for Docket ID NRC-2012-0309.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly available documents online in the NRC
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number
for each document referenced in this notice (if that document is
available in ADAMS) is provided the first time that a document is
referenced.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2012-0309 in the subject line of your
comment submission, in order to ensure that the NRC is able to make
your comment submission available to the public in this docket.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at https://www.regulations.gov and enter the comment submissions into ADAMS, and
the NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
II. Background
Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as
amended (the Act), the NRC is publishing this notice. The Act requires
the Commission to publish notice of any amendments issued, or proposed
to be issued and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license or combined
license, as applicable, upon a determination by the Commission that
such amendment involves no significant hazards consideration,
notwithstanding the pendency before the Commission of a request for a
hearing from any person.
This notice includes notices of amendments containing sensitive
unclassified non-safeguards information (SUNSI).
Notice of Consideration of Issuance of Amendments to Facility Operating
Licenses and Combined Licenses, Proposed No Significant Hazards
Consideration Determination, and Opportunity for a Hearing
The Commission has made a proposed determination that the following
amendment requests involve no significant hazards consideration. Under
the Commission's regulations in Sec. 50.92, this means that operation
of the facility in accordance with the proposed amendment would not (1)
Involve a significant increase in the probability or consequences of an
accident previously evaluated; (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. The basis
for this proposed determination for each amendment request follows.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example, in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the
[[Page 3036]]
subject facility operating license or combined license. Requests for a
hearing and a petition for leave to intervene shall be filed in
accordance with the Commission's ``Agency Rules of Practice and
Procedure'' in 10 CFR part 2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is available at the NRC's PDR,
located at One White Flint North, Room O1-F21, 11555 Rockville Pike
(first floor), Rockville, Maryland 20852. The NRC regulations are
accessible electronically from the NRC Library on the NRC Web site at
https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a
hearing or petition for leave to intervene is filed within 60 days, the
Commission or a presiding officer designated by the Commission or by
the Chief Administrative Judge of the Atomic Safety and Licensing Board
Panel, will rule on the request and/or petition; and the Secretary or
the Chief Administrative Judge of the Atomic Safety and Licensing Board
will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address, and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be issued in the
proceeding on the requestor's/petitioner's interest. The petition must
also set forth the specific contentions which the requestor/petitioner
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
requestor/petitioner shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the requestor/
petitioner intends to rely in proving the contention at the hearing.
The requestor/petitioner must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
requestor/petitioner intends to rely to establish those facts or expert
opinion. The petition must include sufficient information to show that
a genuine dispute exists with the applicant on a material issue of law
or fact. Contentions shall be limited to matters within the scope of
the amendment under consideration. The contention must be one which, if
proven, would entitle the requestor/petitioner to relief. A requestor/
petitioner who fails to satisfy these requirements with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to decide when the hearing is held. If the final determination is that
the amendment request involves no significant hazards consideration,
the Commission may issue the amendment and make it immediately
effective, notwithstanding the request for a hearing. Any hearing held
would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, then any hearing held would take place before
the issuance of any amendment.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139,
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at hearing.docket@nrc.gov, or by
telephone at 301-415-1677, to request (1) a digital information (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a request or
petition for hearing (even in instances in which the participant, or
its counsel or representative, already holds an NRC-issued digital ID
certificate). Based upon this information, the Secretary will establish
an electronic docket for the hearing in this proceeding if the
Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in the NRC's ``Guidance for
Electronic Submission,'' which is available on the agency's public Web
site at https://www.nrc.gov/site-help/e-submittals.html. Participants
may attempt to use other software not listed on the Web site, but
should note that the NRC's E-Filing system does not support unlisted
software, and the NRC Meta System Help Desk will not be able to offer
assistance in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through the Electronic Information Exchange System,
users will be required to install a Web browser plug-in from the NRC
Web site. Further information on the Web-based submission form,
including the installation of the Web browser plug-in, is available on
the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
[[Page 3037]]
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC Web site
at https://www.nrc.gov/site-help/e-submittals.html, by email at
MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service. A presiding officer, having
granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information. With
respect to copyrighted works, except for limited excerpts that serve
the purpose of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
Petitions for leave to intervene must be filed no later than 60
days from the date of publication of this notice. Requests for hearing,
petitions for leave to intervene, and motions for leave to file new or
amended contentions that are filed after the 60-day deadline will not
be entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the following three
factors in 10 CFR 2.309(c)(1): (i) The information upon which the
filing is based was not previously available; (ii) the information upon
which the filing is based is materially different from information
previously available; and (iii) the filing has been submitted in a
timely fashion based on the availability of the subsequent information.
Southern Nuclear Operating Company, Inc., Docket Nos. 50-348 and 50-
364, Joseph M. Farley Nuclear Plant, Units 1 and 2, Houston County,
Alabama
Date of amendment request: August 20, 2012, as supplemented by
letters dated October 25 and November 8, 2012.
Description of amendment request: This license amendment request
contains Sensitive Unclassified Non-Safeguards Information (SUNSI). The
proposed amendments would revise the Technical Specification (TS)
surveillance requirement (SR) 3.7.6.1 required water volume for
condensate storage tank (CST) operability from 150,000 to 164,000
gallons.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change would revise TS 3.7.6, ``Condensate Storage
Tank (CST),'' to revise the CST level requirements specified in
Surveillance Requirement (SR) 3.7.6.1. The proposed change
administratively increases the volume margin of the CST.
The CST is not an accident initiator and is credited to mitigate
accidents and events. These changes have no impact on the method by
which the CST performs its functions. With these changes, a
sufficient quantity of water will continue to be supplied by the CST
to the Auxiliary Feedwater (AFW) pumps to remove heat from the
Reactor Coolant System (RCS) during a plant event.
With this change, the overall quantity of water required to meet
operability requirements of SR 3.7.6.1 is increased. This increase
is acceptable, providing increased CST volume margin and is based on
plant specific CST minimum storage volume calculations.
This change does not impact any accident initiators or analyzed
events. It does not impact any assumed mitigation capability for any
accident or transient event. The change does not involve the
addition or removal of any equipment; however, a design change to
the low level alarm setpoint will be required. Therefore, operation
of the facility in accordance with the proposed amendment does not
involve a significant increase in the probability or consequences of
an accident previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The CST is not an accident initiator and is credited to mitigate
accidents and events. These changes have no impact on the method by
which the CST performs its functions. This change does not involve
any physical modifications to plant structures, systems, or
components (SSCs), or the manner in which SSCs are maintained,
modified, tested, or inspected. In addition, there is no change in
the types or increases in the amounts of effluents that may be
released offsite, and there is no increase in individual or
cumulative occupational radiation exposure. Therefore, the proposed
change does not create the possibility of a new or different kind of
accident from any previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The accident analyses credit CST inventory to meet RCS design
pressure, containment design pressure, 10 CFR 100 dose limits, and
10 CFR 50.36 peak cladding temperature limits. The increase in SR
3.7.6.1 CST required minimum volume increases the CST volume margin.
The CST volume for the natural circulation cooldown event is greater
than that required to mitigate accidents. The CST will continue to
provide the entire required source of usable volume of safety grade
water to the AFW System pumps to remove decay and sensible heat from
the RCS. This change does not involve any
[[Page 3038]]
physical modifications to SSCs or the manner in which SSCs are
maintained, modified, tested, or inspected. However, a design change
to the low level alarm setpoint will be required. The change does
not alter the manner in which safety limits, limiting safety system
settings, or limiting conditions for operation are determined. The
setpoints at which protective actions are initiated are not altered
by the change. Therefore, the proposed change does not involve a
significant reduction in a margin of safety.
Based on the above, SNC concludes that the proposed amendment
does not involve a significant hazards consideration under the
standards set forth in 10 CFR 50.92(c), and, accordingly, a finding
of ``no significant hazards consideration'' is justified.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: M. Stanford Blanton, Esq., Balch and
Bingham, Post Office Box 306, 1710 Sixth Avenue North, Birmingham,
Alabama 35201.
NRC Branch Chief: Robert J. Pascarelli.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing Sensitive
Unclassified Non-Safeguards Information (SUNSI).
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI is necessary to respond to this notice may
request such access. A ``potential party'' is any person who intends to
participate as a party by demonstrating standing and filing an
admissible contention under 10 CFR 2.309. Requests for access to SUNSI
submitted later than 10 days after publication will not be considered
absent a showing of good cause for the late filing, addressing why the
request could not have been filed earlier.
C. The requestor shall submit a letter requesting permission to
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy to the Associate General
Counsel for Hearings, Enforcement and Administration, Office of the
General Counsel, Washington, DC 20555-0001. The expedited delivery or
courier mail address for both offices is: U.S. Nuclear Regulatory
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The email
address for the Office of the Secretary and the Office of the General
Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov,
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI under these
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1); and
(3) The identity of the individual or entity requesting access to
SUNSI and the requestor's basis for the need for the information in
order to meaningfully participate in this adjudicatory proceeding. In
particular, the request must explain why publicly available versions of
the information requested would not be sufficient to provide the basis
and specificity for a proffered contention.
D. Based on an evaluation of the information submitted under
paragraph C.(3) the NRC staff will determine within 10 days of receipt
of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI.
E. If the NRC staff determines that the requestor satisfies both
D.(1) and D.(2) above, the NRC staff will notify the requestor in
writing that access to SUNSI has been granted. The written notification
will contain instructions on how the requestor may obtain copies of the
requested documents, and any other conditions that may apply to access
to those documents. These conditions may include, but are not limited
to, the signing of a Non-Disclosure Agreement or Affidavit, or
Protective Order \2\ setting forth terms and conditions to prevent the
unauthorized or inadvertent disclosure of SUNSI by each individual who
will be granted access to SUNSI.
---------------------------------------------------------------------------
\2\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
F. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI must be filed by the requestor no later than 25 days after
the requestor is granted access to that information. However, if more
than 25 days remain between the date the petitioner is granted access
to the information and the deadline for filing all other contentions
(as established in the notice of hearing or opportunity for hearing),
the petitioner may file its SUNSI contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRC staff
after a determination on standing and need for access, the NRC staff
shall immediately notify the requestor in writing, briefly stating the
reason or reasons for the denial.
(2) The requestor may challenge the NRC staff's adverse
determination by filing a challenge within 5 days of receipt of that
determination with: (a) The presiding officer designated in this
proceeding; (b) if no presiding officer has been appointed, the Chief
Administrative Judge, or if he or she is unavailable, another
administrative judge, or an administrative law judge with jurisdiction
pursuant to 10 CFR 2.318(a); or (c) if another officer has been
designated to rule on information access issues, with that officer.
H. Review of Grants of Access. A party other than the requestor may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed with the Chief Administrative Judge
within 5 days of the notification by the NRC staff of its grant of
access.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\3\
---------------------------------------------------------------------------
\3\ Requestors should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals
of NRC staff determinations (because they must be served on a
presiding officer or the Commission, as applicable), but not to the
initial SUNSI request submitted to the NRC staff under these
procedures.
---------------------------------------------------------------------------
I. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI, and motions for protective
[[Page 3039]]
orders, in a timely fashion in order to minimize any unnecessary delays
in identifying those petitioners who have standing and who have
propounded contentions meeting the specificity and basis requirements
in 10 CFR part 2. Attachment 1 to this Order summarizes the general
target schedule for processing and resolving requests under these
procedures.
It Is So Ordered.
Dated at Rockville, Maryland, this 7th day of January 2013.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
ATTACHMENT 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards
Information in This Proceeding
------------------------------------------------------------------------
Day Event/activity
------------------------------------------------------------------------
0..................... Publication of Federal Register notice of
hearing and opportunity to petition for leave
to intervene, including order with instructions
for access requests.
10.................... Deadline for submitting requests for access to
Sensitive Unclassified Non-Safeguards
Information (SUNSI) with information:
supporting the standing of a potential party
identified by name and address; describing the
need for the information in order for the
potential party to participate meaningfully in
an adjudicatory proceeding.
60.................... Deadline for submitting petition for
intervention containing: (i) demonstration of
standing; (ii) all contentions whose
formulation does not require access to SUNSI
(+25 Answers to petition for intervention; +7
requestor/petitioner reply).
20.................... Nuclear Regulatory Commission (NRC) staff
informs the requestor of the staff's
determination whether the request for access
provides a reasonable basis to believe standing
can be established and shows need for SUNSI.
(NRC staff also informs any party to the
proceeding whose interest independent of the
proceeding would be harmed by the release of
the information.) If NRC staff makes the
finding of need for SUNSI and likelihood of
standing, NRC staff begins document processing
(preparation of redactions or review of
redacted documents).
25.................... If NRC staff finds no ``need'' or no likelihood
of standing, the deadline for requestor/
petitioner to file a motion seeking a ruling to
reverse the NRC staff's denial of access; NRC
staff files copy of access determination with
the presiding officer (or Chief Administrative
Judge or other designated officer, as
appropriate). If NRC staff finds ``need'' for
SUNSI, the deadline for any party to the
proceeding whose interest independent of the
proceeding would be harmed by the release of
the information to file a motion seeking a
ruling to reverse the NRC staff's grant of
access.
30.................... Deadline for NRC staff reply to motions to
reverse NRC staff determination(s).
40.................... (Receipt +30) If NRC staff finds standing and
need for SUNSI, deadline for NRC staff to
complete information processing and file motion
for Protective Order and draft Non-Disclosure
Affidavit. Deadline for applicant/licensee to
file Non-Disclosure Agreement for SUNSI.
A..................... If access granted: Issuance of presiding officer
or other designated officer decision on motion
for protective order for access to sensitive
information (including schedule for providing
access and submission of contentions) or
decision reversing a final adverse
determination by the NRC staff.
A + 3................. Deadline for filing executed Non-Disclosure
Affidavits. Access provided to SUNSI consistent
with decision issuing the protective order.
A + 28................ Deadline for submission of contentions whose
development depends upon access to SUNSI.
However, if more than 25 days remain between
the petitioner's receipt of (or access to) the
information and the deadline for filing all
other contentions (as established in the notice
of hearing or opportunity for hearing), the
petitioner may file its SUNSI contentions by
that later deadline.
A + 53................ (Contention receipt +25) Answers to contentions
whose development depends upon access to SUNSI.
A + 60................ (Answer receipt +7) Petitioner/Intervenor reply
to answers.
>A + 60............... Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. 2013-00424 Filed 1-10-13; 8:45 am]