Sabine Pass Liquefaction, LLC and Sabine Pass LNG, L.P.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Sabine Pass Liquefaction Modification Project and Request for Comments on Environmental Issues, 1851-1853 [2013-00263]
Download as PDF
Federal Register / Vol. 78, No. 6 / Wednesday, January 9, 2013 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 22, 2013.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL13–35–000]
Southwestern Public Service
Company; Southwest Power Pool, Inc.;
Notice of Complaint
Dated: January 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–00267 Filed 1–8–13; 8:45 am]
srobinson on DSK4SPTVN1PROD with
BILLING CODE 6717–01–P
Take notice that on December 31,
2012, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2000), Southwestern Public
Service Company (Complainant) filed a
formal complaint against Southwest
Power Pool, Inc. (Respondent),
requesting the establishment of a
January 1, 2013 refund effective date
and a finding from the Federal Energy
Regulatory Commission (Commission)
that the Respondent has violated the
FPA by implementing a 40 percent
increase in the Tri-County Electric
Cooperative, Inc. Annual Transmission
Revenue Requirement through an
annual update under transmission
formula rate protocols that are not just
and reasonable.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
VerDate Mar<15>2010
16:39 Jan 08, 2013
Jkt 229001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL13–34–000]
New England States Committee on
Electricity v. ISO New England Inc.;
Notice of Complaint
Take notice that on December 28,
2012, pursuant to section 206 of the
Rules and Practice and Procedure, 18
CFR 385.206 and sections 206 of the
Federal Power Act, 16 U.S.C. 824(e),
New England States Committee on
Electricity (Complainant) filed a formal
complaint against ISO New England Inc.
(Respondent) alleging that the
Respondent’s proposed tariffs governing
the Forward Capacity market (FCM) are
unjust and unreasonable.
The Complainant certifies that copies
of the complaint were served on the
contacts for the Respondent and the
New England Power Pool as listed on
the Commission’s list of Corporate
Officials and on parties and regulatory
agencies the Complainant reasonably
expects to be affected by this Complaint,
including all of the parties that have
intervened in Docket ER12–953–001.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
1851
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 17, 2013.
Dated: January 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–00266 Filed 1–8–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–2–000]
Sabine Pass Liquefaction, LLC and
Sabine Pass LNG, L.P.; Notice of Intent
To Prepare an Environmental
Assessment for the Proposed Sabine
Pass Liquefaction Modification Project
and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Sabine Pass Liquefaction
Modification Project (Project) involving
the modification of facilities for Sabine
Pass Liquefaction LLC and Sabine Pass
LNG (Sabine Pass) in Cameron County,
Louisiana. The Project facilities,
described below, are proposed in
support of the Sabine Pass facilities that
were previously authorized (CP11–72–
000) and are currently under
construction. This EA will be used by
the Commission in its decision-making
process to determine whether the
Project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the Project.
Your input will help the Commission
staff determine what issues need to be
evaluated in the EA. Please note that the
E:\FR\FM\09JAN1.SGM
09JAN1
1852
Federal Register / Vol. 78, No. 6 / Wednesday, January 9, 2013 / Notices
scoping period will close on February 4,
2013.
Comments on the Project may be
submitted in written form or
electronically, as described in the Public
Participation section of this notice. This
notice is being sent to the Commission’s
current environmental mailing for this
Project. State and local government
representatives are asked to notify their
constituents of this proposed Project
and encourage them to comment on
their areas of concern.
Summary of the Proposed Project
The Project would consist of the
following facilities:
• Construction and operation of a
heavies removal unit (HRU) to be
located within the existing Sabine Pass
facility;
• condensate storage, metering and
send-out facilities;
• four gas pipeline meter stations;
• additional workspaces, laydown
and parking areas;
• construction and operation of two
additional water supply pipelines to be
installed via horizontal directional drill
(HDD) and the associated workspace for
the HDD entry and exit sites; and
• natural gas liquids (NGL) truck
loading facilities.
A Project location map depicting the
proposed facilities is attached to this
notice as Appendix 1.1
Land Requirements for Construction
The HRU, condensate storage, and
metering facilities would be located
within the existing Sabine Pass LNG
Import Terminal (SPLNG Terminal)
property. No additional land would be
required for these facilities. The
additional workspace and parking
would affect approximately 153.6 acres
of land outside of the boundary of the
SPLNG Terminal. Construction and
operation of the two additional water
supply pipelines would temporarily
impact approximately 0.92 acres of
additional land in an upland area also
located outside the SPLNG Terminal.
The EA Process
srobinson on DSK4SPTVN1PROD with
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
1 The appendices referenced in this notice are not
printed in the Federal Register, but they are being
provided to all those who receive this notice in the
mail. Copies of the NOI can be obtained from the
Commission’s Web site at the ‘‘eLibrary’’ link,
Commission’s Public Reference Room, or by calling
(202) 502–8371. For instructions on connecting to
eLibrary, refer to the end of this notice.
VerDate Mar<15>2010
16:39 Jan 08, 2013
Jkt 229001
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss impacts that
could occur as results of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• Land use;
• Water resources, fisheries, and
wetlands;
• Cultural resources;
• Vegetation and wildlife;
• Air quality and noise;
• Endangered and threatened species;
• Reliability; and
• Public safety.
We will also evaluate reasonable
alternatives to the proposed Project or
portions of the Project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Depending on the comments
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before making our
recommendation to the Commission. To
ensure your comments are considered,
please carefully follow the instructions
in the Public Participation section
beginning on page 4.
With this notice, we are asking
agencies with jurisdiction and/or
special expertise with respect to
environmental issues to formally
cooperate with us in the preparation of
the EA. Agencies that would like to
request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
notice to initiate consultation with
applicable State Historic Preservation
Office (SHPO), and to solicit their views
and those of other government agencies,
interested Indian tribes, and the public
on the Project’s potential effects on
historic properties.3 We will define the
Project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project is further developed. On
natural gas projects, the APE at a
minimum encompasses all areas subject
to ground disturbance (examples
include construction right-of-way,
contractor/pipe storage yards,
compressor stations, and access roads).
Our EA for this Project will document
our findings on the impacts on historic
properties and summarize the status on
consultations under section 106.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the Project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send in your comments
so that they will be received in
Washington, DC on or before February
7, 2013.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP13–2–000) with your
submission. The Commission
encourages electronic filing of
comments and has expert eFiling staff
available to assist you at (202) 502–8258
or efiling@ferc.gov.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s Web site at www.ferc.gov
under the link to Documents and
Filings. An eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s Web site at www.ferc.gov
under the link to Documents and
Filings. With eFiling you can provide
comments in a variety of formats by
attaching them as a file with your
3 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Historic properties are
defined in those regulations as any prehistoric or
historic district, site, building, structure, or object
included in or eligible for inclusion in the National
Register for Historic Places.
E:\FR\FM\09JAN1.SGM
09JAN1
Federal Register / Vol. 78, No. 6 / Wednesday, January 9, 2013 / Notices
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister’’. You will be asked to select
the type of filing you are making. A
comment on a particular project is
considered a ‘‘Comment on a Filing’’; or
(3) You may file a paper copy of your
comments at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Room 1A, Washington,
DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; interested Indian tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the Project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If the EA is published for distribution,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
srobinson on DSK4SPTVN1PROD with
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are included in the User’s
Guide under the ‘‘e-filing’’ link on the
Commission’s Web site.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC or on the FERC Web
VerDate Mar<15>2010
16:39 Jan 08, 2013
Jkt 229001
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits, in the Docket Number
field (i.e., CP13–2). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: January 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–00263 Filed 1–8–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14459–000]
EH California Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments and Motions To Intervene
On October 11, 2012, EH California
Hydro, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Lake Clementine Hydro Project to be
located at the U.S, Corps of Engineer’s
North Fork dam on the North Fork of
the American River, near the City of
Auburn, Placer County, California. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
PO 00000
Frm 00030
Fmt 4703
Sfmt 9990
1853
To harness the water that now flows
over the spillway of the North Fork
Dam, the applicant plans to install two
hydro generating units, with a total
installed capacity of 6.9 megawatts and
an estimated annual generation of 27.8
gigawatt-hours. The applicant’s plans
include building a submerged morning
glory intake; a penstock siphon through
the dam’s left abutment, a silo
powerhouse, and a tailrace.
Applicant Contact: Mr. John R.
Collins, EH California Hydro, LLC, 5425
Wisconsin Avenue, Suite 600, Chevy
Chase, Maryland 20815; phone: (301)
718–4433.
FERC Contact: Jim Fargo at
james.fargo@ferc.gov; phone: (202) 502–
6095.
Competing Application: This
application competes with Project No.
13432–002 filed October 2, 2012.
Competing applications had to be filed
on or before December 9, 2012.
Deadline for filing comments or
motions to intervene: 60 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14459) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: January 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–00261 Filed 1–8–13; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\09JAN1.SGM
09JAN1
Agencies
[Federal Register Volume 78, Number 6 (Wednesday, January 9, 2013)]
[Notices]
[Pages 1851-1853]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-00263]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP13-2-000]
Sabine Pass Liquefaction, LLC and Sabine Pass LNG, L.P.; Notice
of Intent To Prepare an Environmental Assessment for the Proposed
Sabine Pass Liquefaction Modification Project and Request for Comments
on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Sabine Pass Liquefaction
Modification Project (Project) involving the modification of facilities
for Sabine Pass Liquefaction LLC and Sabine Pass LNG (Sabine Pass) in
Cameron County, Louisiana. The Project facilities, described below, are
proposed in support of the Sabine Pass facilities that were previously
authorized (CP11-72-000) and are currently under construction. This EA
will be used by the Commission in its decision-making process to
determine whether the Project is in the public convenience and
necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the Project. Your input will help the Commission staff
determine what issues need to be evaluated in the EA. Please note that
the
[[Page 1852]]
scoping period will close on February 4, 2013.
Comments on the Project may be submitted in written form or
electronically, as described in the Public Participation section of
this notice. This notice is being sent to the Commission's current
environmental mailing for this Project. State and local government
representatives are asked to notify their constituents of this proposed
Project and encourage them to comment on their areas of concern.
Summary of the Proposed Project
The Project would consist of the following facilities:
Construction and operation of a heavies removal unit (HRU)
to be located within the existing Sabine Pass facility;
condensate storage, metering and send-out facilities;
four gas pipeline meter stations;
additional workspaces, laydown and parking areas;
construction and operation of two additional water supply
pipelines to be installed via horizontal directional drill (HDD) and
the associated workspace for the HDD entry and exit sites; and
natural gas liquids (NGL) truck loading facilities.
A Project location map depicting the proposed facilities is
attached to this notice as Appendix 1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not printed in
the Federal Register, but they are being provided to all those who
receive this notice in the mail. Copies of the NOI can be obtained
from the Commission's Web site at the ``eLibrary'' link,
Commission's Public Reference Room, or by calling (202) 502-8371.
For instructions on connecting to eLibrary, refer to the end of this
notice.
---------------------------------------------------------------------------
Land Requirements for Construction
The HRU, condensate storage, and metering facilities would be
located within the existing Sabine Pass LNG Import Terminal (SPLNG
Terminal) property. No additional land would be required for these
facilities. The additional workspace and parking would affect
approximately 153.6 acres of land outside of the boundary of the SPLNG
Terminal. Construction and operation of the two additional water supply
pipelines would temporarily impact approximately 0.92 acres of
additional land in an upland area also located outside the SPLNG
Terminal.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as ``scoping.'' The main goal of
the scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. We will
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as results of
the construction and operation of the proposed project under these
general headings:
Geology and soils;
Land use;
Water resources, fisheries, and wetlands;
Cultural resources;
Vegetation and wildlife;
Air quality and noise;
Endangered and threatened species;
Reliability; and
Public safety.
We will also evaluate reasonable alternatives to the proposed
Project or portions of the Project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments received during the scoping process, we may also publish
and distribute the EA to the public for an allotted comment period. We
will consider all comments on the EA before making our recommendation
to the Commission. To ensure your comments are considered, please
carefully follow the instructions in the Public Participation section
beginning on page 4.
With this notice, we are asking agencies with jurisdiction and/or
special expertise with respect to environmental issues to formally
cooperate with us in the preparation of the EA. Agencies that would
like to request cooperating agency status should follow the
instructions for filing comments provided under the Public
Participation section of this notice.
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with applicable State Historic Preservation Office (SHPO), and to
solicit their views and those of other government agencies, interested
Indian tribes, and the public on the Project's potential effects on
historic properties.\3\ We will define the Project-specific Area of
Potential Effects (APE) in consultation with the SHPO as the project is
further developed. On natural gas projects, the APE at a minimum
encompasses all areas subject to ground disturbance (examples include
construction right-of-way, contractor/pipe storage yards, compressor
stations, and access roads). Our EA for this Project will document our
findings on the impacts on historic properties and summarize the status
on consultations under section 106.
---------------------------------------------------------------------------
\3\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Historic
properties are defined in those regulations as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register for Historic
Places.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the Project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send in your comments
so that they will be received in Washington, DC on or before February
7, 2013.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number (CP13-2-000) with your submission.
The Commission encourages electronic filing of comments and has expert
eFiling staff available to assist you at (202) 502-8258 or
efiling@ferc.gov.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's Web site at www.ferc.gov
under the link to Documents and Filings. An eComment is an easy method
for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's Web site at www.ferc.gov
under the link to Documents and Filings. With eFiling you can provide
comments in a variety of formats by attaching them as a file with your
[[Page 1853]]
submission. New eFiling users must first create an account by clicking
on ``eRegister''. You will be asked to select the type of filing you
are making. A comment on a particular project is considered a ``Comment
on a Filing''; or
(3) You may file a paper copy of your comments at the following
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room 1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; interested Indian tribes;
other interested parties; and local libraries and newspapers. This list
also includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the Project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed project.
If the EA is published for distribution, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are
included in the User's Guide under the ``e-filing'' link on the
Commission's Web site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC or on the
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits, in the Docket Number field (i.e.,
CP13-2). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: January 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-00263 Filed 1-8-13; 8:45 am]
BILLING CODE 6717-01-P