EH California Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene, 1853 [2013-00261]
Download as PDF
Federal Register / Vol. 78, No. 6 / Wednesday, January 9, 2013 / Notices
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister’’. You will be asked to select
the type of filing you are making. A
comment on a particular project is
considered a ‘‘Comment on a Filing’’; or
(3) You may file a paper copy of your
comments at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Room 1A, Washington,
DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; interested Indian tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the Project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If the EA is published for distribution,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
srobinson on DSK4SPTVN1PROD with
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are included in the User’s
Guide under the ‘‘e-filing’’ link on the
Commission’s Web site.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC or on the FERC Web
VerDate Mar<15>2010
16:39 Jan 08, 2013
Jkt 229001
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits, in the Docket Number
field (i.e., CP13–2). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: January 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–00263 Filed 1–8–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14459–000]
EH California Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments and Motions To Intervene
On October 11, 2012, EH California
Hydro, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Lake Clementine Hydro Project to be
located at the U.S, Corps of Engineer’s
North Fork dam on the North Fork of
the American River, near the City of
Auburn, Placer County, California. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
PO 00000
Frm 00030
Fmt 4703
Sfmt 9990
1853
To harness the water that now flows
over the spillway of the North Fork
Dam, the applicant plans to install two
hydro generating units, with a total
installed capacity of 6.9 megawatts and
an estimated annual generation of 27.8
gigawatt-hours. The applicant’s plans
include building a submerged morning
glory intake; a penstock siphon through
the dam’s left abutment, a silo
powerhouse, and a tailrace.
Applicant Contact: Mr. John R.
Collins, EH California Hydro, LLC, 5425
Wisconsin Avenue, Suite 600, Chevy
Chase, Maryland 20815; phone: (301)
718–4433.
FERC Contact: Jim Fargo at
james.fargo@ferc.gov; phone: (202) 502–
6095.
Competing Application: This
application competes with Project No.
13432–002 filed October 2, 2012.
Competing applications had to be filed
on or before December 9, 2012.
Deadline for filing comments or
motions to intervene: 60 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14459) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: January 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–00261 Filed 1–8–13; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\09JAN1.SGM
09JAN1
Agencies
[Federal Register Volume 78, Number 6 (Wednesday, January 9, 2013)]
[Notices]
[Page 1853]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-00261]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14459-000]
EH California Hydro, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments and Motions To
Intervene
On October 11, 2012, EH California Hydro, LLC filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Lake Clementine
Hydro Project to be located at the U.S, Corps of Engineer's North Fork
dam on the North Fork of the American River, near the City of Auburn,
Placer County, California. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
To harness the water that now flows over the spillway of the North
Fork Dam, the applicant plans to install two hydro generating units,
with a total installed capacity of 6.9 megawatts and an estimated
annual generation of 27.8 gigawatt-hours. The applicant's plans include
building a submerged morning glory intake; a penstock siphon through
the dam's left abutment, a silo powerhouse, and a tailrace.
Applicant Contact: Mr. John R. Collins, EH California Hydro, LLC,
5425 Wisconsin Avenue, Suite 600, Chevy Chase, Maryland 20815; phone:
(301) 718-4433.
FERC Contact: Jim Fargo at james.fargo@ferc.gov; phone: (202) 502-
6095.
Competing Application: This application competes with Project No.
13432-002 filed October 2, 2012. Competing applications had to be filed
on or before December 9, 2012.
Deadline for filing comments or motions to intervene: 60 days from
the issuance of this notice. Comments and motions to intervene may be
filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the Commission's Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to
6,000 characters, without prior registration, using the eComment system
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
(202) 502-8659. Although the Commission strongly encourages electronic
filing, documents may also be paper-filed. To paper-file, mail an
original and seven copies to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14459) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: January 3, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-00261 Filed 1-8-13; 8:45 am]