37 Wilton Road, Milford LLC, and 282 Route 101 LLC, PVM Commercial Center, LLC; Notice of Application For Transfer of License, and Soliciting Comments and Motions To Intervene, 934 [2013-00026]
Download as PDF
wreier-aviles on DSK7SPTVN1PROD with
934
Federal Register / Vol. 78, No. 4 / Monday, January 7, 2013 / Notices
On May 9, 2012, the Commission staff
also granted Cameron Interstate’s
request to utilize the Pre-Filing Process
and assigned Docket No. PF12–12 to
staff activities involved with Cameron
Interstate’s related Pipeline Project.
Now, as of the filing of the application
on December 14, 2012, the Pre-Filing
Process for this project has ended. From
this time forward, this proceeding will
be conducted in Docket No. CP13–27–
000, as noted in the caption of this
Notice.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
an original and 7 copies of filings made
with the Commission and must mail a
copy to the applicant and to every other
party in the proceeding. Only parties to
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
VerDate Mar<15>2010
18:06 Jan 04, 2013
Jkt 229001
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper, using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 16, 2013.
Dated: December 26, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–00023 Filed 1–4–13; 8:45 am]
Applicants’ Contact: For transferors:
Mr. Mark Prolman, 37 Wilton Road,
Milford LLC and 282 Route 101 LLC,
100 Elm Street, Nashua, NH 03060,
telephone (603) 880–6655. For
transferee: Mr. Marc Daigle, PVM
Commercial Center, LLC, 1264 Main
Street, Waltham, MA 02451, telephone
(781) 899–4002.
FERC Contact: Patricia W. Gillis (202)
502–8735, patricia.gillis@ferc.gov.
Deadline for filing comments and
motions to intervene: 15 days from the
issuance date of this notice. Comments
and motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1) and the instructions
on the Commission’s Web site under
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original plus
seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project can
be viewed or printed on the eLibrary
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–9282) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
BILLING CODE 6717–01–P
Dated: December 21, 2012.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2013–00026 Filed 1–4–13; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Project No. 9282–034]
DEPARTMENT OF ENERGY
37 Wilton Road, Milford LLC, and 282
Route 101 LLC, PVM Commercial
Center, LLC; Notice of Application For
Transfer of License, and Soliciting
Comments and Motions To Intervene
Federal Energy Regulatory
Commission
On December 19, 2012, 37 Wilton
Road, Milford LLC, and 282 Route 101
LLC (transferors) and PVM Commercial
Center, LLC (transferee) filed an
application for transfer of license for the
Pine Valley Project, FERC No. 9282,
located on the Souhegan River in
Hillsborough County, New Hampshire.
Applicants seek Commission approval
to transfer the license for the Pine
Valley Project from 37 Wilton Road,
Milford LLC, and 282 Route 101 LLC, to
PVM Commercial Center, LLC.
PO 00000
Frm 00007
Fmt 4703
Sfmt 4703
[Project No. 2698–059]
Duke Energy Carolinas, LLC; Notice of
Application Accepted For Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Shoreline
Management Plan.
b. Project No: 2698–059.
c. Date Filed: June 29, 2012.
d. Applicant: Duke Energy Carolinas,
LLC.
E:\FR\FM\07JAN1.SGM
07JAN1
Agencies
[Federal Register Volume 78, Number 4 (Monday, January 7, 2013)]
[Notices]
[Page 934]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-00026]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9282-034]
37 Wilton Road, Milford LLC, and 282 Route 101 LLC, PVM
Commercial Center, LLC; Notice of Application For Transfer of License,
and Soliciting Comments and Motions To Intervene
On December 19, 2012, 37 Wilton Road, Milford LLC, and 282 Route
101 LLC (transferors) and PVM Commercial Center, LLC (transferee) filed
an application for transfer of license for the Pine Valley Project,
FERC No. 9282, located on the Souhegan River in Hillsborough County,
New Hampshire.
Applicants seek Commission approval to transfer the license for the
Pine Valley Project from 37 Wilton Road, Milford LLC, and 282 Route 101
LLC, to PVM Commercial Center, LLC.
Applicants' Contact: For transferors: Mr. Mark Prolman, 37 Wilton
Road, Milford LLC and 282 Route 101 LLC, 100 Elm Street, Nashua, NH
03060, telephone (603) 880-6655. For transferee: Mr. Marc Daigle, PVM
Commercial Center, LLC, 1264 Main Street, Waltham, MA 02451, telephone
(781) 899-4002.
FERC Contact: Patricia W. Gillis (202) 502-8735,
patricia.gillis@ferc.gov.
Deadline for filing comments and motions to intervene: 15 days from
the issuance date of this notice. Comments and motions to intervene may
be filed electronically via the Internet. See 18 CFR 385.2001(a)(1) and
the instructions on the Commission's Web site under https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. If unable to be filed electronically, documents may be paper-
filed. To paper-file, an original plus seven copies should be mailed
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426. More information about
this project can be viewed or printed on the eLibrary link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-9282) in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3372.
Dated: December 21, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-00026 Filed 1-4-13; 8:45 am]
BILLING CODE 6717-01-P