Burton Creek Hydro Inc., Sollos Energy, LLC', 938 [2013-00019]
Download as PDF
938
Federal Register / Vol. 78, No. 4 / Monday, January 7, 2013 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on Friday, January 4, 2013.
Dated: December 26, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–00022 Filed 1–4–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–28–000]
wreier-aviles on DSK7SPTVN1PROD with
Dominion Transmission, Inc.; Notice of
Request Under Blanket Authorization
Take notice that on December 14,
2012, Dominion Transmission, Inc.
(Dominion), 701 East Cary Street,
Richmond, Virginia 23219, filed a prior
notice application pursuant to sections
157.205 and 157.208 of the Federal
Energy Regulatory Commission’s
regulations under the Natural Gas Act
(NGA), and Dominion’s blanket
certificate issued in Docket No. CP82–
537–000, to replace 3.36 miles of
existing 26-inch diameter pipeline
located in Fairfield, Franklin and
Muskingum counties, Ohio, and 1.57
miles of 30-inch diameter pipeline
located in Beaver County, Pennsylvania,
all as more fully set forth in the
application, which is open to the public
for inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Brad
Knisley, Regulatory and Certificates
Analyst, Dominion Transmission, Inc.,
701 East Cary Street, Richmond, VA
23219 or telephone (804) 771–4412 or
fax (804) 771–4804 or by email
Brad.A.Knisley@dom.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
VerDate Mar<15>2010
15:16 Jan 04, 2013
Jkt 229001
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 14 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: December 28, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–00024 Filed 1–4–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7577–012]
Burton Creek Hydro Inc., Sollos
Energy, LLC’
Notice of Transfer of Exemption
1. By letter filed December 19, 2012,
Burton Creek Hydro Inc. informed the
Commission that its exemption from
licensing for the Burton Creek Hydro
Project, FERC No. 7577, originally
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
issued September 25, 1985,1 has been
transferred to Sollos Energy, LLC. The
project is located on Burton Creek in
Lewis County, Washington. The transfer
of an exemption does not require
Commission approval.
2. Sollos Energy, LLC, Mr. Samuel
Perry located at 5980 SE 30th Street,
Mercer Island, Washington 98040 is
now the exemptee of the Burton Creek
Hydro Project, FERC No. 7577.
Dated: December 26, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–00019 Filed 1–4–13; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL—9768–4]
Notification of a Public Meeting and a
Public Teleconference of the Clean Air
Scientific Advisory Committee Lead
Review Panel
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The EPA Science Advisory
Board (SAB) Staff Office announces a
public meeting and a public
teleconference of the Clean Air
Scientific Advisory Committee (CASAC)
Lead Review Panel to conduct a peer
review of EPA’s Integrated Science
Assessment for Lead (Third External
Review Draft—November 2012) and
EPA’s Policy Assessment for the Review
of the Lead National Ambient Air
Quality Standards (First External
Review Draft—January 2013).
DATES: The CASAC Lead Review Panel
face-to-face public meeting will be held
on Tuesday, February 5, 2013, from 8:30
a.m. to 5:30 p.m. (Eastern Time) and on
Wednesday, February 6, 2013, from 8:30
a.m. to 1:00 p.m. (Eastern Time). The
follow-up public teleconference of the
CASAC Lead Review Panel will be held
on Monday, April 1, 2013, from 1:00
p.m. to 4:00 p.m. (Eastern Time).
ADDRESSES: The CASAC Lead Review
Panel face-to-face public meeting will be
held at the Hilton Garden Inn RaleighCary hotel, 131 Columbus Avenue, Cary,
North Carolina, 27518 (919–377–0440).
The CASAC Lead Review Panel’s
follow-up public teleconference will
take place via telephone only.
FOR FURTHER INFORMATION CONTACT: Any
member of the public who wants further
SUMMARY:
1 32 FERC ¶ 62,641, Order Granting Exemption
From Licensing of a Small Hydroelectric Project of
5 Megawatts or Less.
E:\FR\FM\07JAN1.SGM
07JAN1
Agencies
[Federal Register Volume 78, Number 4 (Monday, January 7, 2013)]
[Notices]
[Page 938]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-00019]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7577-012]
Burton Creek Hydro Inc., Sollos Energy, LLC'
Notice of Transfer of Exemption
1. By letter filed December 19, 2012, Burton Creek Hydro Inc.
informed the Commission that its exemption from licensing for the
Burton Creek Hydro Project, FERC No. 7577, originally issued September
25, 1985,\1\ has been transferred to Sollos Energy, LLC. The project is
located on Burton Creek in Lewis County, Washington. The transfer of an
exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ 32 FERC ] 62,641, Order Granting Exemption From Licensing of
a Small Hydroelectric Project of 5 Megawatts or Less.
---------------------------------------------------------------------------
2. Sollos Energy, LLC, Mr. Samuel Perry located at 5980 SE 30th
Street, Mercer Island, Washington 98040 is now the exemptee of the
Burton Creek Hydro Project, FERC No. 7577.
Dated: December 26, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-00019 Filed 1-4-13; 8:45 am]
BILLING CODE 6717-01-P