Environmental Impacts Statements; Notice of Availability, 77076 [2012-31461]
Download as PDF
77076
Federal Register / Vol. 77, No. 250 / Monday, December 31, 2012 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9006–8]
Notice of Intent: Designation of an
Expanded Ocean Dredged Material
Disposal Site (ODMDS) off Charleston,
South Carolina
U.S. Environmental Protection
Agency (EPA) Region 4.
ACTION: Notice of Intent to prepare an
Environmental Assessment (EA) for the
designation of an expanded ODMDS off
Charleston, South Carolina.
mstockstill on DSK4VPTVN1PROD with
AGENCY:
Purpose: EPA has the authority to
designate ODMDSs under Section 102 of
the Marine Protection, Research and
Sanctuaries Act of 1972 (33 U.S.C. 1401
et seq.). It is EPA’s policy to prepare a
National Environmental Policy
Document for all ODMDS designations
(63 FR 58045, October 1998).
FOR FURTHER INFORMATION, TO SUBMIT
COMMENTS, AND TO BE PLACED ON THE
PROJECT MAILING LIST CONTACT: Mr. Gary
W. Collins, EPA Region 4, 61 Forsyth
Street, Atlanta, Georgia 30303, phone
404–562–9393, email:
collins.garyw@epa.gov.
SUMMARY: EPA in cooperation with the
U.S. Army Corps of Engineers
Charleston District (USACE) intends to
prepare an EA to evaluate the proposed
designation of an expanded ODMDS
offshore Charleston, South Carolina. An
EA will provide the environmental
information necessary to evaluate the
potential environmental impacts
associated with expanding the ODMDS.
Need for Action: The USACE has
requested that EPA evaluate and
designate an expanded ODMDS. The
study area includes an area
approximately 7.18 square miles in size,
for the disposal of dredged material
from the proposed harbor deepening
dredging at Charleston Harbor (4.04
square miles are within the current
ODMDS and 3.14 square miles are
outside the current ODMDS). The size of
an expanded ODMDS will based on
capacity computer modeling results,
and will be refined throughout the study
phase.
Alternatives: The following proposed
alternatives have been tentatively
defined.
1. No action.
2. Expansion of the existing
Charleston ODMDS. Expand the existing
disposal zone and ODMDS to the north,
south and east.
Scoping: EPA is requesting written
comments from federal, state, and local
governments, industry, nongovernmental organizations, and the
VerDate Mar<15>2010
21:28 Dec 28, 2012
Jkt 229001
general public on the range of
alternatives considered, specific
environmental issues to be evaluated,
and the potential impacts of the
alternatives. Scoping comments will be
accepted for 60 days, beginning with the
date of this Notice.
Estimated Date of Draft EA Release:
May 2014.
Responsible Official: Gwendolyn
Keyes Fleming, Regional Administrator,
Region 4.
Dated: December 21, 2012.
Susan E. Bromm,
Director, Office of Federal Activities.
[FR Doc. 2012–31460 Filed 12–28–12; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9006–7]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/
Weekly receipt of Environmental Impact
Statements
Filed 12/17/2012 Through 12/21/2012
Pursuant to 40 CFR 1506.9.
Notice: Section 309(a) of the Clean Air
Act requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
As of
October 1, 2012, EPA will not accept
paper copies or CDs of EISs for filing
purposes; all submissions on or after
October 1, 2012 must be made through
e-NEPA. While this system eliminates
the need to submit paper or CD copies
to EPA to meet filing requirements,
electronic submission does not change
requirements for distribution of EISs for
public review and comment. To begin
using e-NEPA, you must first register
with EPA’s electronic reporting site—
https://cdx.epa.gov/epa_home.asp
EIS No. 20120394, Draft EIS, USFS, OR,
Tollgate Fuels Reduction Project,
Umatilla National Forest, Walla Walla
Ranger District, Umatilla and Union
Counties, OR, Comment Period Ends:
02/13/2013, Contact: Kimpton Cooper
509–522–6009.
EIS No. 20120395, Draft EIS, USFS, CA,
AP Loblolly Pine Removal and
Restoration Project, Andrew Pickens
Ranger District, Sumter National
Forest, Oconee County, CA, Comment
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00074
Fmt 4703
Sfmt 9990
Period Ends: 02/13/2013, Contact:
Victor Wyant 864–638–9568.
EIS No. 20120396, Final Supplement,
USACE, CA, Folsom Dam
Modification Project Approach
Channel, Providing New or
Additional Information on the Design
and Means to Construct the Auxiliary
Spillway Approach Channel, Placer
and El Dorado Counties, CA, Review
Period Ends: 01/29/2013, Contact:
Tyler Stalker 916–557–5107.
EIS No. 20120397, Final EIS, BLM, AK,
National Petroleum Reserve—Alaska
(NPR–A) Integrated Activity Plan,
North Slope Borough, AK, Review
Period Ends: 01/29/2013, Contact:
Serena Sweet 907–271–4543.
EIS No. 20120398, Final EIS, NPS, WI,
Ice Age Complex at Cross Plains
General Management Plan,
Implementation, Ice Age National
Scenic Trail, Dane County, WI,
Review Period Ends: 02/26/2013,
Contact: John Madden 608–441–5610.
EIS No. 20120399, Draft EIS, USACE,
CA, Feather River West Levee Project,
To Reduce Flood Risk in the Sutter
Basin, Sutter and Butte Counties, CA,
Comment Period Ends: 02/13/2013,
Contact: Jeff Koschak 916–557–6994.
EIS No. 20120400, Draft EIS, USACE,
CA, Encinitas-Solana Beach Coastal
Storm Damage Reduction Project, San
Diego County, CA, Comment Period
Ends: 02/26/2013, Contact: Lawrence
Smith 213–452–3846.
EIS No. 20120401, Final EIS, DOE, MA,
RI ADOPTION—Cape Wind Energy
Project, Construction, Operation and
Maintenance, and Decommissioning
of a Electric Generation Facility,
Barnstable, Nantucket and Duke
Counties, MA and Washington
County, RI, Review Period Ends: 01/
29/2013, Contact: Matthew McMillen
202–586–7248.
The U.S. Department of Energy (DOE)
has adopted the U.S. Department of the
Interior’s Mineral Management Service
final EIS filed 1/09/2009. The DOE was
not a cooperating agency for the above
final EIS. Recirculation of the document
is necessary under Section 1506.3(b) of
the Council on Environmental Quality
Regulations.
Dated: December 26, 2012.
Dawn Roberts,
Management Analyst, Office of Federal
Activities.
[FR Doc. 2012–31461 Filed 12–28–12; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\31DEN1.SGM
31DEN1
Agencies
[Federal Register Volume 77, Number 250 (Monday, December 31, 2012)]
[Notices]
[Page 77076]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-31461]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9006-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/
Weekly receipt of Environmental Impact Statements
Filed 12/17/2012 Through 12/21/2012
Pursuant to 40 CFR 1506.9.
Notice: Section 309(a) of the Clean Air Act requires that EPA make
public its comments on EISs issued by other Federal agencies. EPA's
comment letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
SUPPLEMENTARY INFORMATION: As of October 1, 2012, EPA will not accept
paper copies or CDs of EISs for filing purposes; all submissions on or
after October 1, 2012 must be made through e-NEPA. While this system
eliminates the need to submit paper or CD copies to EPA to meet filing
requirements, electronic submission does not change requirements for
distribution of EISs for public review and comment. To begin using e-
NEPA, you must first register with EPA's electronic reporting site--
https://cdx.epa.gov/epa_home.asp
EIS No. 20120394, Draft EIS, USFS, OR, Tollgate Fuels Reduction
Project, Umatilla National Forest, Walla Walla Ranger District,
Umatilla and Union Counties, OR, Comment Period Ends: 02/13/2013,
Contact: Kimpton Cooper 509-522-6009.
EIS No. 20120395, Draft EIS, USFS, CA, AP Loblolly Pine Removal and
Restoration Project, Andrew Pickens Ranger District, Sumter National
Forest, Oconee County, CA, Comment Period Ends: 02/13/2013, Contact:
Victor Wyant 864-638-9568.
EIS No. 20120396, Final Supplement, USACE, CA, Folsom Dam Modification
Project Approach Channel, Providing New or Additional Information on
the Design and Means to Construct the Auxiliary Spillway Approach
Channel, Placer and El Dorado Counties, CA, Review Period Ends: 01/29/
2013, Contact: Tyler Stalker 916-557-5107.
EIS No. 20120397, Final EIS, BLM, AK, National Petroleum Reserve--
Alaska (NPR-A) Integrated Activity Plan, North Slope Borough, AK,
Review Period Ends: 01/29/2013, Contact: Serena Sweet 907-271-4543.
EIS No. 20120398, Final EIS, NPS, WI, Ice Age Complex at Cross Plains
General Management Plan, Implementation, Ice Age National Scenic Trail,
Dane County, WI, Review Period Ends: 02/26/2013, Contact: John Madden
608-441-5610.
EIS No. 20120399, Draft EIS, USACE, CA, Feather River West Levee
Project, To Reduce Flood Risk in the Sutter Basin, Sutter and Butte
Counties, CA, Comment Period Ends: 02/13/2013, Contact: Jeff Koschak
916-557-6994.
EIS No. 20120400, Draft EIS, USACE, CA, Encinitas-Solana Beach Coastal
Storm Damage Reduction Project, San Diego County, CA, Comment Period
Ends: 02/26/2013, Contact: Lawrence Smith 213-452-3846.
EIS No. 20120401, Final EIS, DOE, MA, RI ADOPTION--Cape Wind Energy
Project, Construction, Operation and Maintenance, and Decommissioning
of a Electric Generation Facility, Barnstable, Nantucket and Duke
Counties, MA and Washington County, RI, Review Period Ends: 01/29/2013,
Contact: Matthew McMillen 202-586-7248.
The U.S. Department of Energy (DOE) has adopted the U.S. Department
of the Interior's Mineral Management Service final EIS filed 1/09/2009.
The DOE was not a cooperating agency for the above final EIS.
Recirculation of the document is necessary under Section 1506.3(b) of
the Council on Environmental Quality Regulations.
Dated: December 26, 2012.
Dawn Roberts,
Management Analyst, Office of Federal Activities.
[FR Doc. 2012-31461 Filed 12-28-12; 8:45 am]
BILLING CODE 6560-50-P