Commission Information Collection Activities (FERC Form No. 556); Comment Request; Extension, 77067-77069 [2012-31264]
Download as PDF
Federal Register / Vol. 77, No. 250 / Monday, December 31, 2012 / Notices
• Water usage calculation based on
above data.
Æ 36 × 5 = 180 liters per year (47.6
gallons) or .84 liters (.22 gallons)
each time the dishwasher is used.
Energy Used in kWh
• Formula W = V × T × K
Æ V = Weighted Average Water Usage
per DOE
Æ T = Nominal water heater
temperature rise of 39° C
Æ K = Specific heat of water 0.00115
• Calculated Energy use—180 × 39 ×
.00115 = 8.0 kWh/yr
Summary
• A Dishwasher built by BSH with an
integrated water softener in a home
with a 12.6 grain per gallon water
hardness would be cycled through the
water softening regeneration process
approximately every 6 dish cleaning
cycles. When the water used in the
water softener regeneration process is
apportioned evenly over all
dishwasher runs, the amount of
energy and water usage per cycle is
very low. Based on the assumptions
provided, BSH estimates the typical
water used in the internal Dishwasher
water softener regeneration process at
.84 liters (.22 gallons) per use;
furthermore, using about 8.0 kWh per
year to heat this water in the home
hot water heater.
mstockstill on DSK4VPTVN1PROD with
3. Requirements sought to be waived
Dishwashers are subjected to test
methods outlined in 10 CFR Part 430,
Subpart B, App. C, Section 4.3, which
specifies the method for the water
energy calculation.
• BSH is requesting approval to
estimate the water and energy used in
the water softening process based on
the design of the BSH Dishwasher and
the calculations and assumptions
outlined above.
4. Grounds for Waiver and Interim
Waiver
10 CFR 430.27 (a)(1) provides that a
Petition to waive a requirement of
430.23 may be submitted upon grounds
that the basic model contains one or
more design characteristics which either
prevent testing of the basic model
according to the prescribed test
procedures, or the prescribed test
procedures may evaluate the basic
model in a manner so unrepresentative
of its true energy consumption
characteristics as to provide materially
inaccurate comparative data.
If a water softener regeneration
process was to occur while running an
energy test, the water usage would be
overstated. In this case, the water energy
VerDate Mar<15>2010
21:28 Dec 28, 2012
Jkt 229001
usage would be unrepresentative of the
product providing inaccurate data
resulting in a competitive disadvantage
to BSH.
Granting of an Interim Waiver in this
case is justified since the prescribed test
procedures would potentially evaluate
the basic model in a manner so
unrepresentative of its true energy
consumption characteristics as to
provide materially inaccurate
comparative data. In addition, a similar
Interim Waiver and Waiver have
previously been granted to BSH.
Fax (949) 809–6177
5. Manufacturers of Similar Products
and Affected Manufacturers
77067
AGENCY:
Web based research shows that at
least two other manufacturers are
currently selling dishwashers with an
integrated water softener, Miele Inc. and
Whirlpool Corporation (Waiver
Granted).
Manufacturers selling dishwashers in
the United States include AGA Marvel,
Arcelik A.S., ASKO Appliances, Inc.,
Electrolux North America, Inc., Fagor
America, Inc., Fisher & Paykel
Appliances, GE Appliances and
Lighting, Haier America, Indesit
Company Sa, Teka USA, Inc., LG
Electronics USA, Miele, Inc., Samsung
Electronics Co., Viking Range
Corporation and Whirlpool Corporation.
BSH will notify all companies listed
above (as well as AHAM), as required by
the Department’s rules, providing them
with a copy of this Petition for Waiver
and Interim Waiver.
6. Conclusion
BSH Home Appliances Corporation
hereby requests approval of the Waiver
petition and Interim Waiver. By granting
said Waivers the Department of Energy
will further ensure that water energy is
measured in the same way by all
Dishwasher Manufacturer’s that have a
integrated water softener. Further, BSH
would request that these Waivers be in
good standing until such time that the
test procedure can be formally modified
to account for integrated water
softeners.
BSH Home Appliances certifies that
all manufacturers of domestic
Dishwashers as listed above have been
notified by letter.
With Best Regards,
Mike Edwards
Senior Engineer, Performance and
Consumption
BSH Home Appliances Corporation (FNbG)
100 Bosch Blvd., Building 102
New Bern, NC 28562–6924
mike.edwards@bshg.com
Phone (252) 672–9161
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
[FR Doc. 2012–31395 Filed 12–28–12; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC13–8–000]
Commission Information Collection
Activities (FERC Form No. 556);
Comment Request; Extension
Federal Energy Regulatory
Commission, DOE.
ACTION: Notice of information collection
and request for comments.
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 USC
3506(c)(2)(A), the Federal Energy
Regulatory Commission (Commission or
FERC) is soliciting public comment on
the currently approved information
collection, OMB No. 1902–0075, FERC
Form No. 556, ‘‘Certification of
Qualifying Facility (QF) Status for a
Small Power Production or
Cogeneration Facility’’ (Form No. 556).
DATES: Comments on the collection of
information are due March 1, 2013.
ADDRESSES: You may submit comments
(identified by Docket No. IC13–8–000)
by either of the following methods:
• eFiling at Commission’s Web Site:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION: Ellen Brown
may be reached by email at
DataClearance@FERC.gov, telephone at
(202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Title: FERC Form No. 556,
Certification of Qualifying Facility (QF)
Status for a Small Power Production or
Cogeneration Facility.
SUMMARY:
E:\FR\FM\31DEN1.SGM
31DEN1
77068
Federal Register / Vol. 77, No. 250 / Monday, December 31, 2012 / Notices
OMB Control No.: 1902–0075.
Type of Request: Three-year extension
of the Form No. 556 information
collection requirements with no changes
to the current reporting requirements.
Abstract: The Commission requires
the Form No. 556 to implement the
statutory provisions in Sections 201 and
210 of the Public Utility Regulatory
Policies Act of 1978 (PURPA).1 FERC is
authorized to encourage cogeneration
and small power production and to
prescribe such rules as necessary in
order to carry out the statutory
directives.
A primary statutory objective is the
conservation of energy through efficient
use of energy resources and facilities by
electric utilities. One means of
achieving this goal is to encourage
production of electric power by
cogeneration facilities which make use
of reject heat associated with
commercial or industrial processes, and
by small power production facilities
which use other wastes and renewable
resources. PURPA, encourages the
development of small power production
facilities and cogeneration facilities
which meet certain technical and
corporate criteria through establishment
of various regulatory benefits. Facilities
• Provide certain interconnection and
transmission services priced on a
nondiscriminatory basis;
• Operate in ‘‘parallel’’ with other
interconnected QFs so that they may be
electrically synchronized with electric
utility grids; and
• Make available to the public
avoided cost information and system
capacity needs.
18 CFR Part 292 exempts QFs from
certain corporate, accounting, reporting
and rate regulation requirements,
certain state laws and in certain
instances, regulation under the Federal
Power Act 3 and the Public Utility
Holding Company Act of 2005.4
Type of Respondents: Respondents to
the Form No. 556 are cogeneration
facilities and small power producers
with a generating capacity greater than
1Megawatt (MW) who are self-certifying
their status as a cogenerator facility or
small power producer facility or who
are submitting an application for FERC
certification of their status as a
cogenerator facility.
Estimate of Annual Burden 5: The
Commission estimates the total Public
Reporting Burden for this information
collection as:
that meet these criteria are called
Qualifying Facilities or QFs.
FERC’s regulations 2 specify:
• The certification procedures which
must be followed by owners or
operators of small power production
and cogeneration facilities;
• The criteria which must be met;
• The information which must be
submitted to FERC in order to obtain
qualifying status;
• The PURPA benefits which are
available to QFs to encourage small
power production and cogeneration;
and
• The requirements pertaining to
PURPA implementation plans regarding
the transaction obligations that electric
utilities have with respect to QFs.
Among PURPA provisions in Part 292
are requirements for electric utilities to:
• Purchase energy and capacity from
QFs favorably priced on the basis of the
avoided cost of the power that is
displaced by the QF power (i.e. the
incremental cost to the purchasing
utility if it had generated the displaced
power or purchased it from another
source);
• Sell backup, maintenance and other
power services to QFs at rates based on
the cost of rendering the services;
FORM NO. 556 (IC13–8–000): CERTIFICATION OF QUALIFYING FACILITY (QF) STATUS FOR A SMALL POWER PRODUCTION
OR COGENERATION FACILITY
No. of Respondents
Filing type
Total No. of
responses
Average burden hours per
response
Estimated total
annual burden
hours
(A)
Facility type
(B)
(C)
(A)X(B)X(C)
cogeneration facility > 1MW .............
cogeneration facility > 1 MW ............
small power production facility > 1
MW.
small power production facility > 1
MW.
cogeneration and small power production facility ≤ 1MW (not required to file).
self-certification ................................
application for FERC certification ....
self-certification ................................
53
2
690
2
2
2
8
50
3
848
200
4140
application for FERC certification ....
0
0
6
0
self-certification ................................
192
2
3
1152
Totals .........................................
...........................................................
937
........................
........................
6,340
mstockstill on DSK4VPTVN1PROD with
The total estimated annual cost
burden to respondents is $374,757.40
[6,340 * $59.11].6
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
1 PublicLaw 95–617, November 9, 1978, 92 Stat.
3117. Codified at 16 U.S.C. 46,2601–45.
2 18 CFR part 292.
3 16 U.S.C. 791, et seq.
4 42 U.S.C. 16, 451–63.
5 The Commission defines burden as the total
time, effort, or financial resources expended by
persons to generate, maintain, retain, or disclose or
provide information to or for a Federal agency. For
further explanation of what is included in the
information collection burden, reference 5 Code of
Federal Regulations 1320.3.
6 The cost figures are derived by multiplying the
total hours to prepare a response (hours) by an
hourly wage estimate of $59.11 (a composite
estimate that includes legal, engineering and
support staff wages and benefits obtained from the
Bureau of Labor Statistic data at https://bls.gov/oes/
current/naics3_221000.htm and https://www.bls.gov/
news.release/ecec.nr0.htm rates.
VerDate Mar<15>2010
21:39 Dec 28, 2012
Jkt 229001
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
E:\FR\FM\31DEN1.SGM
31DEN1
Federal Register / Vol. 77, No. 250 / Monday, December 31, 2012 / Notices
Dated: December 20, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–31264 Filed 12–28–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC13–9–000]
Commission Information Collection
Activities (FERC–730); Comment
Request; Extension
Federal Energy Regulatory
Commission, Energy.
ACTION: Notice of information collection
and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 U.S.C.
3506(c)(2)(A), the Federal Energy
Regulatory Commission (Commission or
FERC) is soliciting public comment on
the currently approved information
collection, FERC–730, Report of
Transmission Investment Activity.
DATES: Comments on the collection of
information are due March 1, 2013.
ADDRESSES: You may submit comments
(identified by Docket No. IC13–9–000)
by either of the following methods:
• eFiling at Commission’s Web Site:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
SUMMARY:
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Title: Report of Transmission
Investment Activity.
OMB Control No.: 1902–0239.
Type of Request: Three-year extension
of the FERC–730 information collection
requirements with no changes to the
current reporting requirements.
Abstract: Pursuant to Section 219 1 of
the Federal Power Act, the Commission
issued FERC Order No. 679,2 Promoting
Transmission Investment Through
Pricing Reform. Order No. 679 FERC
amended its regulations in 18 CFR 35.35
to establish incentive-based (including
performance-based) rate treatments for
the transmission of electric energy in
interstate commerce by public utilities.
The Commission intended the order to
benefit consumers by ensuring
reliability and to reduce the cost of
delivered power by reducing
transmission congestion. Order No. 679
also adopted an annual reporting
requirement (FERC–730) for utilities
that receive incentive rate treatment for
specific transmission projects. The
FERC–730 provides annual data on
transmission capital expenditures as
77069
well as project status detail. The
Commission requires that filers specify
which projects are currently receiving
incentives in the project detail table and
that they group together those facilities
receiving the same incentive.
Specifically, in accordance with the
statute, public utilities with incentive
rates must file:
• Actual transmission investment for
the most recent calendar year, and
projected, incremental investments for
the next five calendar years (in dollar
terms); and
• A project by project listing that
specifies for each project the most up to
date, expected completion date,
percentage completion as of the date of
filing, and reasons for delays for all
current and projected investments over
the next five calendar years. Projects
with projected costs less than $20
million are excluded from this listing.
To ensure that Commission rules are
successfully meeting the objectives of
Section 219, the Commission collects
industry data, projections and related
information that detail the level of
investment. FERC–730 information
regarding projected investments as well
as information about completed projects
allows the Commission to monitor the
success of the transmission pricing
reforms and to determine the status of
critical projects and reasons for delay.
Type of Respondents: Public utilities
that have been granted incentive based
rate treatment for specific transmission
projects under the provisions of 18 CFR
35.35(h) must file the FERC–730.
Estimate of Annual Burden 3: The
Commission estimates the total Public
Reporting Burden for this information
collection as:
FERC–730: REPORT OF TRANSMISSION INVESTMENT ACTIVITY
No. of respondents
Total No. of
responses
Average burden hours per
response
Estimated total
annual burden
(A)
Public utilities granted incentive based rate treatment for
specific transmission projects under the provisions of 18
CFR 35.35 (h). .................................................................
No. of responses per
respondent
(B)
(A)×(B)=(C)
(D)
(C)×(D)
63
1
63
30
1,890
mstockstill on DSK4VPTVN1PROD with
The total estimated annual cost
burden to respondents is $130,428.17
[1,890 hours ÷ 2080 4 hours per year *
$143,540/year 5 = $130,428.17].
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
1 Energy Policy Act of 2005, Public Law 109–58,
119 Stat. 594, 315 and 1283 (2005).
2 RM06–4–000 (issued 7/20/2006), published: 71
FR 43294.
3 The Commission defines burden as the total
time, effort, or financial resources expended by
persons to generate, maintain, retain, or disclose or
provide information to or for a Federal agency. For
further explanation of what is included in the
information collection burden, reference 5 Code of
Federal Regulations 1320.3.
4 2080 hours/year = 40 hours/week * 52 weeks/
year
5 Average annual salary per employee in 2012
VerDate Mar<15>2010
21:39 Dec 28, 2012
Jkt 229001
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
E:\FR\FM\31DEN1.SGM
31DEN1
Agencies
[Federal Register Volume 77, Number 250 (Monday, December 31, 2012)]
[Notices]
[Pages 77067-77069]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-31264]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. IC13-8-000]
Commission Information Collection Activities (FERC Form No. 556);
Comment Request; Extension
AGENCY: Federal Energy Regulatory Commission, DOE.
ACTION: Notice of information collection and request for comments.
-----------------------------------------------------------------------
SUMMARY: In compliance with the requirements of the Paperwork Reduction
Act of 1995, 44 USC 3506(c)(2)(A), the Federal Energy Regulatory
Commission (Commission or FERC) is soliciting public comment on the
currently approved information collection, OMB No. 1902-0075, FERC Form
No. 556, ``Certification of Qualifying Facility (QF) Status for a Small
Power Production or Cogeneration Facility'' (Form No. 556).
DATES: Comments on the collection of information are due March 1, 2013.
ADDRESSES: You may submit comments (identified by Docket No. IC13-8-
000) by either of the following methods:
eFiling at Commission's Web Site: https://www.ferc.gov/docs-filing/efiling.asp.
Mail/Hand Delivery/Courier: Federal Energy Regulatory
Commission, Secretary of the Commission, 888 First Street NE.,
Washington, DC 20426.
Instructions: All submissions must be formatted and filed in
accordance with submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support
by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676
(toll-free), or (202) 502-8659 for TTY.
Docket: Users interested in receiving automatic notification of
activity in this docket or in viewing/downloading comments and
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.
FOR FURTHER INFORMATION: Ellen Brown may be reached by email at
DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202)
273-0873.
SUPPLEMENTARY INFORMATION:
Title: FERC Form No. 556, Certification of Qualifying Facility (QF)
Status for a Small Power Production or Cogeneration Facility.
[[Page 77068]]
OMB Control No.: 1902-0075.
Type of Request: Three-year extension of the Form No. 556
information collection requirements with no changes to the current
reporting requirements.
Abstract: The Commission requires the Form No. 556 to implement the
statutory provisions in Sections 201 and 210 of the Public Utility
Regulatory Policies Act of 1978 (PURPA).\1\ FERC is authorized to
encourage cogeneration and small power production and to prescribe such
rules as necessary in order to carry out the statutory directives.
---------------------------------------------------------------------------
\1\ PublicLaw 95-617, November 9, 1978, 92 Stat. 3117. Codified
at 16 U.S.C. 46,2601-45.
---------------------------------------------------------------------------
A primary statutory objective is the conservation of energy through
efficient use of energy resources and facilities by electric utilities.
One means of achieving this goal is to encourage production of electric
power by cogeneration facilities which make use of reject heat
associated with commercial or industrial processes, and by small power
production facilities which use other wastes and renewable resources.
PURPA, encourages the development of small power production facilities
and cogeneration facilities which meet certain technical and corporate
criteria through establishment of various regulatory benefits.
Facilities that meet these criteria are called Qualifying Facilities or
QFs.
FERC's regulations \2\ specify:
---------------------------------------------------------------------------
\2\ 18 CFR part 292.
---------------------------------------------------------------------------
The certification procedures which must be followed by
owners or operators of small power production and cogeneration
facilities;
The criteria which must be met;
The information which must be submitted to FERC in order
to obtain qualifying status;
The PURPA benefits which are available to QFs to encourage
small power production and cogeneration; and
The requirements pertaining to PURPA implementation plans
regarding the transaction obligations that electric utilities have with
respect to QFs.
Among PURPA provisions in Part 292 are requirements for electric
utilities to:
Purchase energy and capacity from QFs favorably priced on
the basis of the avoided cost of the power that is displaced by the QF
power (i.e. the incremental cost to the purchasing utility if it had
generated the displaced power or purchased it from another source);
Sell backup, maintenance and other power services to QFs
at rates based on the cost of rendering the services;
Provide certain interconnection and transmission services
priced on a nondiscriminatory basis;
Operate in ``parallel'' with other interconnected QFs so
that they may be electrically synchronized with electric utility grids;
and
Make available to the public avoided cost information and
system capacity needs.
18 CFR Part 292 exempts QFs from certain corporate, accounting,
reporting and rate regulation requirements, certain state laws and in
certain instances, regulation under the Federal Power Act \3\ and the
Public Utility Holding Company Act of 2005.\4\
---------------------------------------------------------------------------
\3\ 16 U.S.C. 791, et seq.
\4\ 42 U.S.C. 16, 451-63.
---------------------------------------------------------------------------
Type of Respondents: Respondents to the Form No. 556 are
cogeneration facilities and small power producers with a generating
capacity greater than 1Megawatt (MW) who are self-certifying their
status as a cogenerator facility or small power producer facility or
who are submitting an application for FERC certification of their
status as a cogenerator facility.
Estimate of Annual Burden \5\: The Commission estimates the total
Public Reporting Burden for this information collection as:
---------------------------------------------------------------------------
\5\ The Commission defines burden as the total time, effort, or
financial resources expended by persons to generate, maintain,
retain, or disclose or provide information to or for a Federal
agency. For further explanation of what is included in the
information collection burden, reference 5 Code of Federal
Regulations 1320.3.
Form No. 556 (IC13-8-000): Certification of Qualifying Facility (QF) Status for a Small Power Production or
Cogeneration Facility
----------------------------------------------------------------------------------------------------------------
Average burden Estimated
Facility type Filing type No. of Total No. of hours per total annual
Respondents responses response burden hours
................ (A) (B) (C) (A)X(B)X(C)
----------------------------------------------------------------------------------------------------------------
cogeneration facility > 1MW... self- 53 2 8 848
certification.
cogeneration facility > 1 MW.. application for 2 2 50 200
FERC
certification.
small power production self- 690 2 3 4140
facility > 1 MW. certification.
small power production application for 0 0 6 0
facility > 1 MW. FERC
certification.
cogeneration and small power self- 192 2 3 1152
production facility <= 1MW certification.
(not required to file).
---------------------------------------------------------------------------------
Totals.................... ................ 937 .............. .............. 6,340
----------------------------------------------------------------------------------------------------------------
The total estimated annual cost burden to respondents is
$374,757.40 [6,340 * $59.11].\6\
---------------------------------------------------------------------------
\6\ The cost figures are derived by multiplying the total hours
to prepare a response (hours) by an hourly wage estimate of $59.11
(a composite estimate that includes legal, engineering and support
staff wages and benefits obtained from the Bureau of Labor Statistic
data at https://bls.gov/oes/current/naics3_221000.htm and https://www.bls.gov/news.release/ecec.nr0.htm rates.
---------------------------------------------------------------------------
Comments: Comments are invited on: (1) Whether the collection of
information is necessary for the proper performance of the functions of
the Commission, including whether the information will have practical
utility; (2) the accuracy of the agency's estimate of the burden and
cost of the collection of information, including the validity of the
methodology and assumptions used; (3) ways to enhance the quality,
utility and clarity of the information collection; and (4) ways to
minimize the burden of the collection of information on those who are
to respond, including the use of automated collection techniques or
other forms of information technology.
[[Page 77069]]
Dated: December 20, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-31264 Filed 12-28-12; 8:45 am]
BILLING CODE 6717-01-P