Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Louisiana, 75556 [2012-30845]
Download as PDF
75556
Federal Register / Vol. 77, No. 246 / Friday, December 21, 2012 / Rules and Regulations
PART 117—DRAWBRIDGE
OPERATION REGULATIONS
1. The authority citation for part 117
continues to read as follows:
■
Authority: 33 U.S.C. 499; 33 CFR 1.05–1;
Department of Homeland Security Delegation
No. 0170.1.
■
2. Revise § 117.258 to read as follows:
§ 117.258
Apalachicola River.
(a) The draw of the Apalachicola and
Northern Railroad Bridge, mile 4.5
(GIWW mile 347.0 EHL), at
Apalachicola, is maintained in the fully
open-to-navigation position and
untended. The bridge will not be
returned to service until proper
notification is published in the Federal
Register.
(b) The draw of the CSX Railroad
Bridge, mile 105.9, at River Junction
shall open on signal if at least eight
hours notice is given.
Dated: December 10, 2012.
Roy A. Nash,
Rear Admiral, U.S. Coast Guard, Commander,
Eighth Coast Guard District.
[FR Doc. 2012–30762 Filed 12–20–12; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2012–1061]
Drawbridge Operation Regulation; Gulf
Intracoastal Waterway, Louisiana
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the regulation
governing the operation of the Lapalco
Boulevard bascule span drawbridge
across the Harvey Canal Route, Gulf
Intracoastal Waterway (GIWW), mile 2.8
at New Orleans, Jefferson Parish,
Louisiana. The deviation is necessary to
allow for the removal and replacement
of the bridge’s electrical components.
This deviation allows the bridge to
remain closed to navigation for eight
consecutive days.
DATES: This deviation is effective from
6 a.m. on Thursday, January 10, 2013,
until 6 a.m. on Friday, January 18, 2013.
ADDRESSES: The docket for this
temporary deviation, USCG–2012–1061,
is available online by going to https://
www.regulations.gov, inserting USCG–
2012–1061 in the ‘‘Search’’ box and
mstockstill on DSK4VPTVN1PROD with
SUMMARY:
VerDate Mar<15>2010
16:08 Dec 20, 2012
Jkt 229001
then clicking ‘‘Search’’. The docket is
also available for inspection or copying
at the Docket Management Facility (M–
30), U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
email Kay Wade, Bridge Branch Office,
Coast Guard; telephone 504–671–2128,
email Kay.B.Wade@uscg.mil. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: Jefferson
Parish has requested a temporary
deviation from the operating schedule
for the Bascule Span Bridge across the
Harvey Canal Route, Intracoastal
Waterway, mile 2.8 at New Orleans,
Jefferson Parish, Louisiana. The bridge
has a vertical clearance of 45 feet above
mean high water in the closed-tonavigation position and unlimited in the
open-to-navigation position. Vessels
requiring a clearance of less than 45 feet
may transit beneath the bridge during
maintenance operations.
In accordance with 33 CFR
117.451(a), the bridge currently opens
on signal for the passage of vessels;
except that, from 6:30 a.m. to 8:30 a.m.
and from 3:45 p.m. to 5:45 p.m. Monday
through Friday except holidays, the
draw need not be opened for the passage
of vessels. This deviation allows the
bridge to remain closed to navigation
from 6 a.m. on Thursday, January 10,
2013, until 6 a.m. on Friday, January 18,
2013. At all other times, the bridge will
open on signal for the passage of vessels
in accordance with 33 CFR 117.451(a).
The closure is necessary in order to
remove and replace the bridge’s
electrical system. This maintenance is
essential for the continued operation of
the bridge. Notices will be published in
the Eighth Coast Guard District Local
Notice to Mariners and will be broadcast
via the Coast Guard Broadcast Notice to
Mariners System.
Navigation on the waterway consists
mainly of tugs with tows with some
commercial fishing vessels and
recreational craft. Coordination between
the Coast Guard and the waterway users
determined that there should not be any
significant effects on these vessels. The
bridge will be unable to open during
these repairs; however, an alternate
route is available via the GIWW (Algiers
Alternate Route).
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
PO 00000
Frm 00048
Fmt 4700
Sfmt 4700
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: December 5, 2012.
David M. Frank,
Bridge Administrator.
[FR Doc. 2012–30845 Filed 12–20–12; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket No. USCG 2012–0993]
Safety Zone; Sacramento New Year’s
Eve Fireworks Display, Sacramento
River, Sacramento, CA
Coast Guard, DHS.
Notice of enforcement of
regulation.
AGENCY:
ACTION:
The Coast Guard will enforce
the 1,000 foot safety zones during the
Sacramento New Year’s Eve Fireworks
Display in the navigable waters of the
Sacramento River on December 31, 2012
and January 1, 2013. The fireworks
displays will occur from 9 p.m. to 9:15
p.m. on December 31, 2011 and from
11:59 p.m. on December 31, 2012 until
12:15 a.m. on January 1, 2013 for the
annual Sacramento New Year’s Eve
Fireworks Display. During the
enforcement period, unauthorized
persons or vessels are prohibited from
entering into, transiting through, or
anchoring in the safety zone, unless
authorized by the Patrol Commander
(PATCOM).
DATES: The regulations in 33 CFR
165.1191, Table 1, Item number 29, will
be enforced from 9 p.m. to 9:15 p.m. on
December 31, 2012 and from 11:59 p.m.
on December 31, 2012 to 12:15 a.m. on
January 1, 2013.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this notice, call
or email Ensign William Hawn, U.S.
Coast Guard Sector San Francisco;
telephone (415) 399–7442 or email at
D11-PF-MarineEvents@uscg.mil.
SUPPLEMENTARY INFORMATION: The Coast
Guard will enforce the Sacramento New
Year’s Eve Fireworks Display safety
zones in the navigable waters of the
Sacramento River near positions
38°34′48.26″ N, 121°30′38.52″ W (NAD
83) and 38°34′49.84″ N, 121°30′29.59″
W (NAD 83). Upon the commencement
of the first fireworks display, scheduled
to take place from 9 p.m. until 9:15 p.m.
SUMMARY:
E:\FR\FM\21DER1.SGM
21DER1
Agencies
[Federal Register Volume 77, Number 246 (Friday, December 21, 2012)]
[Rules and Regulations]
[Page 75556]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-30845]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2012-1061]
Drawbridge Operation Regulation; Gulf Intracoastal Waterway,
Louisiana
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
regulation governing the operation of the Lapalco Boulevard bascule
span drawbridge across the Harvey Canal Route, Gulf Intracoastal
Waterway (GIWW), mile 2.8 at New Orleans, Jefferson Parish, Louisiana.
The deviation is necessary to allow for the removal and replacement of
the bridge's electrical components. This deviation allows the bridge to
remain closed to navigation for eight consecutive days.
DATES: This deviation is effective from 6 a.m. on Thursday, January 10,
2013, until 6 a.m. on Friday, January 18, 2013.
ADDRESSES: The docket for this temporary deviation, USCG-2012-1061, is
available online by going to https://www.regulations.gov, inserting
USCG-2012-1061 in the ``Search'' box and then clicking ``Search''. The
docket is also available for inspection or copying at the Docket
Management Facility (M-30), U.S. Department of Transportation, West
Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or email Kay Wade, Bridge Branch Office, Coast Guard; telephone
504-671-2128, email Kay.B.Wade@uscg.mil. If you have questions on
viewing the docket, call Renee V. Wright, Program Manager, Docket
Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: Jefferson Parish has requested a temporary
deviation from the operating schedule for the Bascule Span Bridge
across the Harvey Canal Route, Intracoastal Waterway, mile 2.8 at New
Orleans, Jefferson Parish, Louisiana. The bridge has a vertical
clearance of 45 feet above mean high water in the closed-to-navigation
position and unlimited in the open-to-navigation position. Vessels
requiring a clearance of less than 45 feet may transit beneath the
bridge during maintenance operations.
In accordance with 33 CFR 117.451(a), the bridge currently opens on
signal for the passage of vessels; except that, from 6:30 a.m. to 8:30
a.m. and from 3:45 p.m. to 5:45 p.m. Monday through Friday except
holidays, the draw need not be opened for the passage of vessels. This
deviation allows the bridge to remain closed to navigation from 6 a.m.
on Thursday, January 10, 2013, until 6 a.m. on Friday, January 18,
2013. At all other times, the bridge will open on signal for the
passage of vessels in accordance with 33 CFR 117.451(a).
The closure is necessary in order to remove and replace the
bridge's electrical system. This maintenance is essential for the
continued operation of the bridge. Notices will be published in the
Eighth Coast Guard District Local Notice to Mariners and will be
broadcast via the Coast Guard Broadcast Notice to Mariners System.
Navigation on the waterway consists mainly of tugs with tows with
some commercial fishing vessels and recreational craft. Coordination
between the Coast Guard and the waterway users determined that there
should not be any significant effects on these vessels. The bridge will
be unable to open during these repairs; however, an alternate route is
available via the GIWW (Algiers Alternate Route).
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: December 5, 2012.
David M. Frank,
Bridge Administrator.
[FR Doc. 2012-30845 Filed 12-20-12; 8:45 am]
BILLING CODE 9110-04-P