Notice of Commission Staff Attendance, 75630 [2012-30771]
Download as PDF
75630
Federal Register / Vol. 77, No. 246 / Friday, December 21, 2012 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14470–000]
mstockstill on DSK4VPTVN1PROD with
New England Hydropower Company,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On December 7, 2012, the New
England Hydropower Company, LLC,
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of the Starr Mill
Hydroelectric Project (Starr Mill Project
or project) to be located on the
Coginchaug River, near Middletown,
Middlesex County, Connecticut. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) An existing 10-foothigh, 85-foot-long stone masonry dam;
(2) an existing 8.32-acre impoundment
with about 0.19 acres within the
proposed project boundary; (3) an
existing 12-foot-long, 6.6-foot-wide, 6.6foot-deep head box and intake channel;
(4) a new 3.3-foot-high, 7-foot-wide
sluice gate equipped with a 6.6-foothigh, 12-foot-wide trashrack with 6-inch
bar spacing; (5) a new 33-foot-long, 6.6foot wide Archimedes screw generator
unit with an installed capacity of 25
kilowatts; (6) a new 10-foot-high, 9.5foot-long, 9.5-foot-wide powerhouse
containing a new gearbox and electrical
controls; (7) a new above ground 120foot-long, 13.8-kilovolt transmission
line connecting the powerhouse to an
existing nearby distribution system
pole; and (8) appurtenant facilities. The
estimated annual generation of the
proposed Starr Mill Project would be
about 95 megawatt-hours. The existing
Starr Mill Dam and appurtenant works,
including a former powerhouse
foundation and intake structures, are
privately owned.
Applicant Contact: Mr. Michael C.
Kerr, New England Hydropower
Company, LLC, P.O. Box 5524, Beverly
Farms, Massachusetts 01915; phone:
(978) 360–2547.
FERC Contact: John Ramer; phone:
(202) 502–8969 or email:
john.ramer@ferc.gov.
VerDate Mar<15>2010
18:28 Dec 20, 2012
Jkt 229001
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp.Commenters can submit brief
comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp.You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp.Enter the docket number
(P–14470) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: December 14, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–30719 Filed 12–20–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meeting related to
the transmission planning activities of
ISO New England Inc., New York
Independent System Operator, Inc., and
PJM Interconnection, L.L.C.:
Joint Inter-Regional Planning Task
Force/Electric System Planning Working
Group December 20, 2012, 11:00 a.m. to
4:00 p.m., Local Time.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
The above-referenced meeting is open
to stakeholders and will be held at:
NYISO’s offices, Rensselaer, NY.
Further information may be found at
www.nyiso.com.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
Docket No. ER08–1281, New York
Independent System Operator, Inc.
For more information, contact James
Eason, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–8622 or
James.Eason@ferc.gov.
Dated: December 17, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–30771 Filed 12–20–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meetings related to
the interregional transmission planning
activities of the Southwest Power Pool
(SPP):
SPP Seams Steering Committee
Meeting—December 18, 2012.
The above-referenced meeting will be
held at: AEP Offices, 1201 Elm Street,
Dallas, TX 72501.
The above-referenced meeting is open
to the public.
Further information may be found at
www.spp.org.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. ER09–35–001, Tallgrass
Transmission, LLC
Docket No. ER09–36–001, Prairie Wind
Transmission, LLC
Docket No. ER09–548–001, ITC Great Plains,
LLC
Docket No. ER09–659–002, Southwest Power
Pool, Inc.
Docket No. ER11–1419–000, et al., Southwest
Power Pool, Inc.
Docket No. ER11–4105–000, Southwest
Power Pool, Inc.
Docket No. EL11–34–001, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1179, Southwest Power
Pool, Inc.
Docket No. ER12–1401–000, Southwest
Power Pool, Inc.
Docket No. ER12–1402–000, Southwest
Power Pool, Inc.
E:\FR\FM\21DEN1.SGM
21DEN1
Agencies
[Federal Register Volume 77, Number 246 (Friday, December 21, 2012)]
[Notices]
[Page 75630]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-30771]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission's staff may attend the following meeting
related to the transmission planning activities of ISO New England
Inc., New York Independent System Operator, Inc., and PJM
Interconnection, L.L.C.:
Joint Inter-Regional Planning Task Force/Electric System Planning
Working Group December 20, 2012, 11:00 a.m. to 4:00 p.m., Local Time.
The above-referenced meeting is open to stakeholders and will be
held at:
NYISO's offices, Rensselaer, NY.
Further information may be found at www.nyiso.com.
The discussions at the meetings described above may address matters
at issue in the following proceedings:
Docket No. ER08-1281, New York Independent System Operator, Inc.
For more information, contact James Eason, Office of Energy Market
Regulation, Federal Energy Regulatory Commission at (202) 502-8622 or
James.Eason@ferc.gov.
Dated: December 17, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-30771 Filed 12-20-12; 8:45 am]
BILLING CODE 6717-01-P