Sunshine Act Meeting Notice, 74842-74843 [2012-30544]

Download as PDF 74842 Federal Register / Vol. 77, No. 243 / Tuesday, December 18, 2012 / Notices inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field (P–2146) to access the document. You may also register online at https://www.ferc.gov/ docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1– 866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: December 11, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–30394 Filed 12–17–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY government in the Sunshine Act (Pub. L. No. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: December 20, 2012 10:00 a.m. Room 2C, 888 First Street NE., Washington, DC 20426. PLACE: STATUS: Open. Agenda * Note—Items listed on the agenda may be deleted without further notice. MATTERS TO BE CONSIDERED: CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items, struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 988th—Meeting Federal Energy Regulatory Commission Regular Meeting December 20, 2012, 10:00 a.m. Sunshine Act Meeting Notice The following notice of meeting is published pursuant to section 3(a) of the Item No. Docket No. Company Administrative A–1 ............................................................. A–2 ............................................................. AD02–1–000 ............................................. AD02–7–000 ............................................. Agency Business Matters. Customer Matters, Reliability, Security and Market Operations. Electric RM10–11–001 ........................................... EL11–44–001 ............................................ E–3 ............................................................. EL11–44–002 ............................................ E–4 ............................................................. E–5 ............................................................. emcdonald on DSK67QTVN1PROD with E–1 ............................................................. E–2 ............................................................. RM11–12–000 ........................................... RM12–6–000 RM12–7–000 ...................... E–6 E–7 E–8 E–9 ............................................................. ............................................................. ............................................................. ............................................................. OMITTED RR12–8–000 ............................................. NP11–238–001 ......................................... RM12–9–000 ............................................. E–10 ........................................................... E–11 ........................................................... OMITTED ER13–178–000 ......................................... VerDate Mar<15>2010 15:29 Dec 17, 2012 Jkt 229001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 Integration of Variable Energy Resources. Iberdrola Renewables, Inc., PacificCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, and Horizon Wind Energy LLC v. Bonneville Power Administration. Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, and Horizon Wind Energy LLC v. Bonneville Power Administration. Availability of E-Tag Information to Commission Staff. Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of Procedure. North American Electric Reliability Corporation. North American Electric Reliability Corporation. Regional Reliability Standard PRC–006–SERC–01Automatic Underfrequency Load Shedding Requirements. Southwest Power Pool, Inc. E:\FR\FM\18DEN1.SGM 18DEN1 Federal Register / Vol. 77, No. 243 / Tuesday, December 18, 2012 / Notices Item No. 74843 Docket No. Company City of Colton, California. California Independent System Operator Corporation. California Independent System Operator Corporation. California Independent System Operator Corporation. Valley Electric Association, Inc. FirstEnergy Generation Corp. and American Transmission System, Incorporated. E–12 E–13 E–14 E–15 E–16 E–17 ........................................................... ........................................................... ........................................................... ........................................................... ........................................................... ........................................................... ER13–207–000 ......................................... ER13–168–000 ......................................... ER13–218–000 ......................................... ER13–219–000 ......................................... ER13–49–000 ........................................... EC12–119–000 ......................................... E–18 E–19 E–20 E–21 E–22 ........................................................... ........................................................... ........................................................... ........................................................... ........................................................... OMITTED OMITTED OMITTED OMITTED EL12–109–000 .......................................... E–23 ........................................................... Avalon Wind, LLC, Avalon Wind 2, LLC, Catalina Solar, LLC, Catalina Solar 2, LLC, Pacific Wind Lessee, LLC, Pacific Wind 2, LLC, Valentine Solar, LLC, and EDF Renewables Development, Inc. OMITTED Gas G–1 G–2 G–3 G–4 G–5 ............................................................ ............................................................ ............................................................ ............................................................ ............................................................ RP11–2061–002, RP11–2061–003 .......... RP12–814–000 ......................................... RP12–820–000 ......................................... RP12–813–000 ......................................... OR12–27–000 ........................................... Northern Natural Gas Company. Gulf Crossing Pipeline Company LLC. Texas Gas Transmission, LLC. Gulf South Pipeline Company, LP. Enbridge Pipelines (Southern Lights) LLC. Hydro H–1 ............................................................. H–2 ............................................................. H–3 ............................................................. P–13213–004 ............................................ P–13214–004 ............................................ P–14354–001 ............................................ HB81–09–2–002 ....................................... Lock 14 Hydro Partners, LLC. Lock 12 Hydro Partners, LLC. Utah Independent Power, Inc. Hudson River-Black River Regulating District, Erie Boulevard Hydropower L.P., Curtis/Palmer Hydroelectric Co., South Glens Falls Limited Partnership, et al., Northern Electric Power Co., et al., Fort Miller Associates, Stillwater Hydro Associates, New York State Electric & Gas Corp., Albany Engineering Corporation, and Green Island Power Co. Certificates C–1 ............................................................. RM12–11–000 ........................................... C–2 ............................................................. C–3 ............................................................. CP12–25–000 ........................................... CP12–72–000 ........................................... emcdonald on DSK67QTVN1PROD with Dated: December 13, 2012. Kimberly D. Bose, Secretary. A free webcast of this event is available through www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated VerDate Mar<15>2010 17:13 Dec 17, 2012 Jkt 229001 Revisions to the Auxiliary Installations, Replacement Facilities, and Siting and Maintenance Regulations. Brian Hamilton v. El Paso Natural Gas Company. Dominion Transmission, Inc. overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2012–30544 Filed 12–14–12; 4:15 pm] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR13–10–000] Seaway Crude Pipeline Company LLC; Notice of Petition for Declaratory Order Take notice that on December 10, 2012, pursuant to Rule 207(a)(2) of the Commission’s Rules of Practices and Procedure, 18 CFR 385.207(a)(2)(2012), Seaway Crude Pipeline Company LLC PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 (Seaway), filed a petition seeking a declaratory order affirming that the tariff rates agreed to by shippers who sign contracts in an open season applies equally to Seaway’s Shippers that signed Transportation Services Agreements. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to E:\FR\FM\18DEN1.SGM 18DEN1

Agencies

[Federal Register Volume 77, Number 243 (Tuesday, December 18, 2012)]
[Notices]
[Pages 74842-74843]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-30544]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5 
U.S.C. 552b:

AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.

DATE AND TIME: December 20, 2012 10:00 a.m.

PLACE: Room 2C, 888 First Street NE., Washington, DC 20426.

STATUS: Open.

MATTERS TO BE CONSIDERED: Agenda
    * Note--Items listed on the agenda may be deleted without further 
notice.

CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items, struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at https://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.

988th--Meeting

Regular Meeting December 20, 2012, 10:00 a.m.

--------------------------------------------------------------------------------------------------------------------------------------------------------
                 Item No.                           Docket No.                                               Company
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                     Administrative
--------------------------------------------------------------------------------------------------------------------------------------------------------
A-1......................................  AD02-1-000..................  Agency Business Matters.
A-2......................................  AD02-7-000..................  Customer Matters, Reliability, Security and Market Operations.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                        Electric
--------------------------------------------------------------------------------------------------------------------------------------------------------
E-1......................................  RM10-11-001.................  Integration of Variable Energy Resources.
E-2......................................  EL11-44-001.................  Iberdrola Renewables, Inc., PacificCorp, NextEra Energy Resources, LLC,
                                                                          Invenergy Wind North America LLC, and Horizon Wind Energy LLC v. Bonneville
                                                                          Power Administration.
E-3......................................  EL11-44-002.................  Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC,
                                                                          Invenergy Wind North America LLC, and Horizon Wind Energy LLC v. Bonneville
                                                                          Power Administration.
E-4......................................  RM11-12-000.................  Availability of E-Tag Information to Commission Staff.
E-5......................................  RM12-6-000 RM12-7-000.......  Revisions to Electric Reliability Organization Definition of Bulk Electric
                                                                          System and Rules of Procedure.
E-6......................................  OMITTED                       ...............................................................................
E-7......................................  RR12-8-000..................  North American Electric Reliability Corporation.
E-8......................................  NP11-238-001................  North American Electric Reliability Corporation.
E-9......................................  RM12-9-000..................  Regional Reliability Standard PRC-006-SERC-01-Automatic Underfrequency Load
                                                                          Shedding Requirements.
E-10.....................................  OMITTED                       ...............................................................................
E-11.....................................  ER13-178-000................  Southwest Power Pool, Inc.

[[Page 74843]]

 
E-12.....................................  ER13-207-000................  City of Colton, California.
E-13.....................................  ER13-168-000................  California Independent System Operator Corporation.
E-14.....................................  ER13-218-000................  California Independent System Operator Corporation.
E-15.....................................  ER13-219-000................  California Independent System Operator Corporation.
E-16.....................................  ER13-49-000.................  Valley Electric Association, Inc.
E-17.....................................  EC12-119-000................  FirstEnergy Generation Corp. and American Transmission System, Incorporated.
E-18.....................................  OMITTED                       ...............................................................................
E-19.....................................  OMITTED                       ...............................................................................
E-20.....................................  OMITTED                       ...............................................................................
E-21.....................................  OMITTED                       ...............................................................................
E-22.....................................  EL12-109-000................  Avalon Wind, LLC, Avalon Wind 2, LLC, Catalina Solar, LLC, Catalina Solar 2,
                                                                          LLC, Pacific Wind Lessee, LLC, Pacific Wind 2, LLC, Valentine Solar, LLC, and
                                                                          EDF Renewables Development, Inc.
E-23.....................................  OMITTED                       ...............................................................................
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                           Gas
--------------------------------------------------------------------------------------------------------------------------------------------------------
G-1......................................  RP11-2061-002, RP11-2061-003  Northern Natural Gas Company.
G-2......................................  RP12-814-000................  Gulf Crossing Pipeline Company LLC.
G-3......................................  RP12-820-000................  Texas Gas Transmission, LLC.
G-4......................................  RP12-813-000................  Gulf South Pipeline Company, LP.
G-5......................................  OR12-27-000.................  Enbridge Pipelines (Southern Lights) LLC.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                          Hydro
--------------------------------------------------------------------------------------------------------------------------------------------------------
H-1......................................  P-13213-004.................  Lock 14 Hydro Partners, LLC.
                                           P-13214-004.................  Lock 12 Hydro Partners, LLC.
H-2......................................  P-14354-001.................  Utah Independent Power, Inc.
H-3......................................  HB81-09-2-002...............  Hudson River-Black River Regulating District, Erie Boulevard Hydropower L.P.,
                                                                          Curtis/Palmer Hydroelectric Co., South Glens Falls Limited Partnership, et
                                                                          al., Northern Electric Power Co., et al., Fort Miller Associates, Stillwater
                                                                          Hydro Associates, New York State Electric & Gas Corp., Albany Engineering
                                                                          Corporation, and Green Island Power Co.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                      Certificates
--------------------------------------------------------------------------------------------------------------------------------------------------------
C-1......................................  RM12-11-000.................  Revisions to the Auxiliary Installations, Replacement Facilities, and Siting
                                                                          and Maintenance Regulations.
C-2......................................  CP12-25-000.................  Brian Hamilton v. El Paso Natural Gas Company.
C-3......................................  CP12-72-000.................  Dominion Transmission, Inc.
--------------------------------------------------------------------------------------------------------------------------------------------------------


    Dated: December 13, 2012.
Kimberly D. Bose,
Secretary.
    A free webcast of this event is available through www.ferc.gov. 
Anyone with Internet access who desires to view this event can do so by 
navigating to www.ferc.gov's Calendar of Events and locating this event 
in the Calendar. The event will contain a link to its webcast. The 
Capitol Connection provides technical support for the free webcasts. It 
also offers access to this event via television in the DC area and via 
phone bridge for a fee. If you have any questions, visit 
www.CapitolConnection.org or contact Danelle Springer or David 
Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 2012-30544 Filed 12-14-12; 4:15 pm]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.