Sunshine Act Meeting Notice, 74842-74843 [2012-30544]
Download as PDF
74842
Federal Register / Vol. 77, No. 243 / Tuesday, December 18, 2012 / Notices
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–2146) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: December 11, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–30394 Filed 12–17–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
government in the Sunshine Act (Pub.
L. No. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME:
December 20, 2012 10:00
a.m.
Room 2C, 888 First Street NE.,
Washington, DC 20426.
PLACE:
STATUS:
Open.
Agenda
* Note—Items listed on the agenda
may be deleted without further notice.
MATTERS TO BE CONSIDERED:
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items,
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
Web site at https://www.ferc.gov using
the eLibrary link, or may be examined
in the Commission’s Public Reference
Room.
988th—Meeting
Federal Energy Regulatory
Commission
Regular Meeting December 20, 2012,
10:00 a.m.
Sunshine Act Meeting Notice
The following notice of meeting is
published pursuant to section 3(a) of the
Item No.
Docket No.
Company
Administrative
A–1 .............................................................
A–2 .............................................................
AD02–1–000 .............................................
AD02–7–000 .............................................
Agency Business Matters.
Customer Matters, Reliability, Security and Market Operations.
Electric
RM10–11–001 ...........................................
EL11–44–001 ............................................
E–3 .............................................................
EL11–44–002 ............................................
E–4 .............................................................
E–5 .............................................................
emcdonald on DSK67QTVN1PROD with
E–1 .............................................................
E–2 .............................................................
RM11–12–000 ...........................................
RM12–6–000 RM12–7–000 ......................
E–6
E–7
E–8
E–9
.............................................................
.............................................................
.............................................................
.............................................................
OMITTED
RR12–8–000 .............................................
NP11–238–001 .........................................
RM12–9–000 .............................................
E–10 ...........................................................
E–11 ...........................................................
OMITTED
ER13–178–000 .........................................
VerDate Mar<15>2010
15:29 Dec 17, 2012
Jkt 229001
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Integration of Variable Energy Resources.
Iberdrola Renewables, Inc., PacificCorp, NextEra Energy Resources, LLC, Invenergy Wind North America
LLC, and Horizon Wind Energy LLC v. Bonneville
Power Administration.
Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy
Resources, LLC, Invenergy Wind North America LLC,
and Horizon Wind Energy LLC v. Bonneville Power
Administration.
Availability of E-Tag Information to Commission Staff.
Revisions to Electric Reliability Organization Definition
of Bulk Electric System and Rules of Procedure.
North American Electric Reliability Corporation.
North American Electric Reliability Corporation.
Regional Reliability Standard PRC–006–SERC–01Automatic Underfrequency Load Shedding Requirements.
Southwest Power Pool, Inc.
E:\FR\FM\18DEN1.SGM
18DEN1
Federal Register / Vol. 77, No. 243 / Tuesday, December 18, 2012 / Notices
Item No.
74843
Docket No.
Company
City of Colton, California.
California Independent System Operator Corporation.
California Independent System Operator Corporation.
California Independent System Operator Corporation.
Valley Electric Association, Inc.
FirstEnergy Generation Corp. and American Transmission System, Incorporated.
E–12
E–13
E–14
E–15
E–16
E–17
...........................................................
...........................................................
...........................................................
...........................................................
...........................................................
...........................................................
ER13–207–000 .........................................
ER13–168–000 .........................................
ER13–218–000 .........................................
ER13–219–000 .........................................
ER13–49–000 ...........................................
EC12–119–000 .........................................
E–18
E–19
E–20
E–21
E–22
...........................................................
...........................................................
...........................................................
...........................................................
...........................................................
OMITTED
OMITTED
OMITTED
OMITTED
EL12–109–000 ..........................................
E–23 ...........................................................
Avalon Wind, LLC, Avalon Wind 2, LLC, Catalina Solar,
LLC, Catalina Solar 2, LLC, Pacific Wind Lessee,
LLC, Pacific Wind 2, LLC, Valentine Solar, LLC, and
EDF Renewables Development, Inc.
OMITTED
Gas
G–1
G–2
G–3
G–4
G–5
............................................................
............................................................
............................................................
............................................................
............................................................
RP11–2061–002, RP11–2061–003 ..........
RP12–814–000 .........................................
RP12–820–000 .........................................
RP12–813–000 .........................................
OR12–27–000 ...........................................
Northern Natural Gas Company.
Gulf Crossing Pipeline Company LLC.
Texas Gas Transmission, LLC.
Gulf South Pipeline Company, LP.
Enbridge Pipelines (Southern Lights) LLC.
Hydro
H–1 .............................................................
H–2 .............................................................
H–3 .............................................................
P–13213–004 ............................................
P–13214–004 ............................................
P–14354–001 ............................................
HB81–09–2–002 .......................................
Lock 14 Hydro Partners, LLC.
Lock 12 Hydro Partners, LLC.
Utah Independent Power, Inc.
Hudson River-Black River Regulating District, Erie Boulevard Hydropower L.P., Curtis/Palmer Hydroelectric
Co., South Glens Falls Limited Partnership, et al.,
Northern Electric Power Co., et al., Fort Miller Associates, Stillwater Hydro Associates, New York State
Electric & Gas Corp., Albany Engineering Corporation, and Green Island Power Co.
Certificates
C–1 .............................................................
RM12–11–000 ...........................................
C–2 .............................................................
C–3 .............................................................
CP12–25–000 ...........................................
CP12–72–000 ...........................................
emcdonald on DSK67QTVN1PROD with
Dated: December 13, 2012.
Kimberly D. Bose,
Secretary.
A free webcast of this event is
available through www.ferc.gov.
Anyone with Internet access who
desires to view this event can do so by
navigating to www.ferc.gov’s Calendar
of Events and locating this event in the
Calendar. The event will contain a link
to its webcast. The Capitol Connection
provides technical support for the free
webcasts. It also offers access to this
event via television in the DC area and
via phone bridge for a fee. If you have
any questions, visit
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
VerDate Mar<15>2010
17:13 Dec 17, 2012
Jkt 229001
Revisions to the Auxiliary Installations, Replacement
Facilities, and Siting and Maintenance Regulations.
Brian Hamilton v. El Paso Natural Gas Company.
Dominion Transmission, Inc.
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 2012–30544 Filed 12–14–12; 4:15 pm]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR13–10–000]
Seaway Crude Pipeline Company LLC;
Notice of Petition for Declaratory Order
Take notice that on December 10,
2012, pursuant to Rule 207(a)(2) of the
Commission’s Rules of Practices and
Procedure, 18 CFR 385.207(a)(2)(2012),
Seaway Crude Pipeline Company LLC
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
(Seaway), filed a petition seeking a
declaratory order affirming that the tariff
rates agreed to by shippers who sign
contracts in an open season applies
equally to Seaway’s Shippers that
signed Transportation Services
Agreements.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
E:\FR\FM\18DEN1.SGM
18DEN1
Agencies
[Federal Register Volume 77, Number 243 (Tuesday, December 18, 2012)]
[Notices]
[Pages 74842-74843]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-30544]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5
U.S.C. 552b:
AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.
DATE AND TIME: December 20, 2012 10:00 a.m.
PLACE: Room 2C, 888 First Street NE., Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda
* Note--Items listed on the agenda may be deleted without further
notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items, struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's Web site at https://www.ferc.gov using the eLibrary link,
or may be examined in the Commission's Public Reference Room.
988th--Meeting
Regular Meeting December 20, 2012, 10:00 a.m.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
--------------------------------------------------------------------------------------------------------------------------------------------------------
Administrative
--------------------------------------------------------------------------------------------------------------------------------------------------------
A-1...................................... AD02-1-000.................. Agency Business Matters.
A-2...................................... AD02-7-000.................. Customer Matters, Reliability, Security and Market Operations.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Electric
--------------------------------------------------------------------------------------------------------------------------------------------------------
E-1...................................... RM10-11-001................. Integration of Variable Energy Resources.
E-2...................................... EL11-44-001................. Iberdrola Renewables, Inc., PacificCorp, NextEra Energy Resources, LLC,
Invenergy Wind North America LLC, and Horizon Wind Energy LLC v. Bonneville
Power Administration.
E-3...................................... EL11-44-002................. Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC,
Invenergy Wind North America LLC, and Horizon Wind Energy LLC v. Bonneville
Power Administration.
E-4...................................... RM11-12-000................. Availability of E-Tag Information to Commission Staff.
E-5...................................... RM12-6-000 RM12-7-000....... Revisions to Electric Reliability Organization Definition of Bulk Electric
System and Rules of Procedure.
E-6...................................... OMITTED ...............................................................................
E-7...................................... RR12-8-000.................. North American Electric Reliability Corporation.
E-8...................................... NP11-238-001................ North American Electric Reliability Corporation.
E-9...................................... RM12-9-000.................. Regional Reliability Standard PRC-006-SERC-01-Automatic Underfrequency Load
Shedding Requirements.
E-10..................................... OMITTED ...............................................................................
E-11..................................... ER13-178-000................ Southwest Power Pool, Inc.
[[Page 74843]]
E-12..................................... ER13-207-000................ City of Colton, California.
E-13..................................... ER13-168-000................ California Independent System Operator Corporation.
E-14..................................... ER13-218-000................ California Independent System Operator Corporation.
E-15..................................... ER13-219-000................ California Independent System Operator Corporation.
E-16..................................... ER13-49-000................. Valley Electric Association, Inc.
E-17..................................... EC12-119-000................ FirstEnergy Generation Corp. and American Transmission System, Incorporated.
E-18..................................... OMITTED ...............................................................................
E-19..................................... OMITTED ...............................................................................
E-20..................................... OMITTED ...............................................................................
E-21..................................... OMITTED ...............................................................................
E-22..................................... EL12-109-000................ Avalon Wind, LLC, Avalon Wind 2, LLC, Catalina Solar, LLC, Catalina Solar 2,
LLC, Pacific Wind Lessee, LLC, Pacific Wind 2, LLC, Valentine Solar, LLC, and
EDF Renewables Development, Inc.
E-23..................................... OMITTED ...............................................................................
--------------------------------------------------------------------------------------------------------------------------------------------------------
Gas
--------------------------------------------------------------------------------------------------------------------------------------------------------
G-1...................................... RP11-2061-002, RP11-2061-003 Northern Natural Gas Company.
G-2...................................... RP12-814-000................ Gulf Crossing Pipeline Company LLC.
G-3...................................... RP12-820-000................ Texas Gas Transmission, LLC.
G-4...................................... RP12-813-000................ Gulf South Pipeline Company, LP.
G-5...................................... OR12-27-000................. Enbridge Pipelines (Southern Lights) LLC.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Hydro
--------------------------------------------------------------------------------------------------------------------------------------------------------
H-1...................................... P-13213-004................. Lock 14 Hydro Partners, LLC.
P-13214-004................. Lock 12 Hydro Partners, LLC.
H-2...................................... P-14354-001................. Utah Independent Power, Inc.
H-3...................................... HB81-09-2-002............... Hudson River-Black River Regulating District, Erie Boulevard Hydropower L.P.,
Curtis/Palmer Hydroelectric Co., South Glens Falls Limited Partnership, et
al., Northern Electric Power Co., et al., Fort Miller Associates, Stillwater
Hydro Associates, New York State Electric & Gas Corp., Albany Engineering
Corporation, and Green Island Power Co.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Certificates
--------------------------------------------------------------------------------------------------------------------------------------------------------
C-1...................................... RM12-11-000................. Revisions to the Auxiliary Installations, Replacement Facilities, and Siting
and Maintenance Regulations.
C-2...................................... CP12-25-000................. Brian Hamilton v. El Paso Natural Gas Company.
C-3...................................... CP12-72-000................. Dominion Transmission, Inc.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Dated: December 13, 2012.
Kimberly D. Bose,
Secretary.
A free webcast of this event is available through www.ferc.gov.
Anyone with Internet access who desires to view this event can do so by
navigating to www.ferc.gov's Calendar of Events and locating this event
in the Calendar. The event will contain a link to its webcast. The
Capitol Connection provides technical support for the free webcasts. It
also offers access to this event via television in the DC area and via
phone bridge for a fee. If you have any questions, visit
www.CapitolConnection.org or contact Danelle Springer or David
Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. 2012-30544 Filed 12-14-12; 4:15 pm]
BILLING CODE 6717-01-P