Gas Transmission Northwest LLC; Notice of Availability of the Environmental Assessment for the Proposed Carty Lateral Project, 74657 [2012-30265]
Download as PDF
Federal Register / Vol. 77, No. 242 / Monday, December 17, 2012 / Notices
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 6, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–30282 Filed 12–14–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–494–000]
srobinson on DSK4SPTVN1PROD with
Gas Transmission Northwest LLC;
Notice of Availability of the
Environmental Assessment for the
Proposed Carty Lateral Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Carty Lateral Project, proposed by Gas
Transmission Northwest LLC (GTN) in
the above-referenced docket. GTN
requests authorization to construct
pipeline facilities in Morrow County,
Oregon to provide up to 175,000
dekatherms per day of new natural gas
delivery capacity to the planned Carty
Generating Station.
The EA assesses the potential
environmental effects of the
construction and operation of the Carty
Lateral Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA).
GTN’s proposed Carty Lateral Project
involves the construction of
approximately 24.3 miles of 20-inchdiameter pipeline, one new meter
station, and other appurtenant facilities.
The FERC staff concludes that approval
of the proposed project, with
appropriate mitigating measures, would
not constitute a major federal action
significantly affecting the quality of the
human environment.
The U.S. Fish and Wildlife Service
and the Morrow County Planning
Department participated as cooperating
agencies in the preparation of the EA.
VerDate Mar<15>2010
16:21 Dec 14, 2012
Jkt 229001
Cooperating agencies have jurisdiction
by law or special expertise with respect
to resources potentially affected by the
proposal and participate in the NEPA
analysis.
The FERC staff mailed copies of the
EA to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
newspapers and libraries in the project
area; and parties to this proceeding. In
addition, the EA is available for public
viewing on the FERC’s Web site
(www.ferc.gov) using the eLibrary link.
A limited number of copies of the EA
are available for distribution and public
inspection at: Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street NE., Room 2A,
Washington, DC 20426, (202) 502–8371.
Any person wishing to comment on
the EA may do so. Your comments
should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on this project, it is
important that we receive your
comments in Washington, DC on or
before January 16, 2013.
For your convenience, there are three
methods you can use to file your
comments to the Commission. In all
instances, please reference the project
docket number (CP12–494–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
PO 00000
Frm 00025
Fmt 4703
Sfmt 9990
74657
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
Any person seeking to become a party
to the proceeding must file a motion to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214). 1 Only
intervenors have the right to seek
rehearing of the Commission’s decision.
The Commission grants affected
landowners and others with
environmental concerns intervenor
status upon showing good cause by
stating that they have a clear and direct
interest in this proceeding which no
other party can adequately represent.
Simply filing environmental comments
will not give you intervenor status, but
you do not need intervenor status to
have your comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search,’’ and enter the docket
number excluding the last three digits in
the Docket Number field (i.e., CP12–
494). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/
esubscribenow.htm.
Dated: December 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–30265 Filed 12–14–12; 8:45 am]
BILLING CODE 6717–01–P
1 See the previous discussion on the methods for
filing comments.
E:\FR\FM\17DEN1.SGM
17DEN1
Agencies
[Federal Register Volume 77, Number 242 (Monday, December 17, 2012)]
[Notices]
[Page 74657]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-30265]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP12-494-000]
Gas Transmission Northwest LLC; Notice of Availability of the
Environmental Assessment for the Proposed Carty Lateral Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) for the Carty
Lateral Project, proposed by Gas Transmission Northwest LLC (GTN) in
the above-referenced docket. GTN requests authorization to construct
pipeline facilities in Morrow County, Oregon to provide up to 175,000
dekatherms per day of new natural gas delivery capacity to the planned
Carty Generating Station.
The EA assesses the potential environmental effects of the
construction and operation of the Carty Lateral Project in accordance
with the requirements of the National Environmental Policy Act (NEPA).
GTN's proposed Carty Lateral Project involves the construction of
approximately 24.3 miles of 20-inch-diameter pipeline, one new meter
station, and other appurtenant facilities. The FERC staff concludes
that approval of the proposed project, with appropriate mitigating
measures, would not constitute a major federal action significantly
affecting the quality of the human environment.
The U.S. Fish and Wildlife Service and the Morrow County Planning
Department participated as cooperating agencies in the preparation of
the EA. Cooperating agencies have jurisdiction by law or special
expertise with respect to resources potentially affected by the
proposal and participate in the NEPA analysis.
The FERC staff mailed copies of the EA to federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American tribes;
potentially affected landowners and other interested individuals and
groups; newspapers and libraries in the project area; and parties to
this proceeding. In addition, the EA is available for public viewing on
the FERC's Web site (www.ferc.gov) using the eLibrary link. A limited
number of copies of the EA are available for distribution and public
inspection at: Federal Energy Regulatory Commission, Public Reference
Room, 888 First Street NE., Room 2A, Washington, DC 20426, (202) 502-
8371.
Any person wishing to comment on the EA may do so. Your comments
should focus on the potential environmental effects, reasonable
alternatives, and measures to avoid or lessen environmental impacts.
The more specific your comments, the more useful they will be. To
ensure that the Commission has the opportunity to consider your
comments prior to making its decision on this project, it is important
that we receive your comments in Washington, DC on or before January
16, 2013.
For your convenience, there are three methods you can use to file
your comments to the Commission. In all instances, please reference the
project docket number (CP12-494-000) with your submission. The
Commission encourages electronic filing of comments and has expert
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for submitting brief,
text-only comments on a project;
(2) You can also file your comments electronically using the
eFiling feature on the Commission's Web site (www.ferc.gov) under the
link to Documents and Filings. With eFiling, you can provide comments
in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426.
Any person seeking to become a party to the proceeding must file a
motion to intervene pursuant to Rule 214 of the Commission's Rules of
Practice and Procedures (18 CFR 385.214). \1\ Only intervenors have the
right to seek rehearing of the Commission's decision. The Commission
grants affected landowners and others with environmental concerns
intervenor status upon showing good cause by stating that they have a
clear and direct interest in this proceeding which no other party can
adequately represent. Simply filing environmental comments will not
give you intervenor status, but you do not need intervenor status to
have your comments considered.
---------------------------------------------------------------------------
\1\ See the previous discussion on the methods for filing
comments.
---------------------------------------------------------------------------
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on ``General Search,'' and enter the docket number
excluding the last three digits in the Docket Number field (i.e., CP12-
494). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/esubscribenow.htm.
Dated: December 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-30265 Filed 12-14-12; 8:45 am]
BILLING CODE 6717-01-P