Gas Transmission Northwest LLC; Notice of Availability of the Environmental Assessment for the Proposed Carty Lateral Project, 74657 [2012-30265]

Download as PDF Federal Register / Vol. 77, No. 242 / Monday, December 17, 2012 / Notices must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 6, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–30282 Filed 12–14–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12–494–000] srobinson on DSK4SPTVN1PROD with Gas Transmission Northwest LLC; Notice of Availability of the Environmental Assessment for the Proposed Carty Lateral Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Carty Lateral Project, proposed by Gas Transmission Northwest LLC (GTN) in the above-referenced docket. GTN requests authorization to construct pipeline facilities in Morrow County, Oregon to provide up to 175,000 dekatherms per day of new natural gas delivery capacity to the planned Carty Generating Station. The EA assesses the potential environmental effects of the construction and operation of the Carty Lateral Project in accordance with the requirements of the National Environmental Policy Act (NEPA). GTN’s proposed Carty Lateral Project involves the construction of approximately 24.3 miles of 20-inchdiameter pipeline, one new meter station, and other appurtenant facilities. The FERC staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment. The U.S. Fish and Wildlife Service and the Morrow County Planning Department participated as cooperating agencies in the preparation of the EA. VerDate Mar<15>2010 16:21 Dec 14, 2012 Jkt 229001 Cooperating agencies have jurisdiction by law or special expertise with respect to resources potentially affected by the proposal and participate in the NEPA analysis. The FERC staff mailed copies of the EA to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; newspapers and libraries in the project area; and parties to this proceeding. In addition, the EA is available for public viewing on the FERC’s Web site (www.ferc.gov) using the eLibrary link. A limited number of copies of the EA are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street NE., Room 2A, Washington, DC 20426, (202) 502–8371. Any person wishing to comment on the EA may do so. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that the Commission has the opportunity to consider your comments prior to making its decision on this project, it is important that we receive your comments in Washington, DC on or before January 16, 2013. For your convenience, there are three methods you can use to file your comments to the Commission. In all instances, please reference the project docket number (CP12–494–000) with your submission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502–8258 or efiling@ferc.gov. (1) You can file your comments electronically using the eComment feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. This is an easy method for submitting brief, text-only comments on a project; (2) You can also file your comments electronically using the eFiling feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You must select the type of filing you are making. If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’; or PO 00000 Frm 00025 Fmt 4703 Sfmt 9990 74657 (3) You can file a paper copy of your comments by mailing them to the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 20426. Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission’s Rules of Practice and Procedures (18 CFR 385.214). 1 Only intervenors have the right to seek rehearing of the Commission’s decision. The Commission grants affected landowners and others with environmental concerns intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which no other party can adequately represent. Simply filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search,’’ and enter the docket number excluding the last three digits in the Docket Number field (i.e., CP12– 494). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/ esubscribenow.htm. Dated: December 10, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–30265 Filed 12–14–12; 8:45 am] BILLING CODE 6717–01–P 1 See the previous discussion on the methods for filing comments. E:\FR\FM\17DEN1.SGM 17DEN1

Agencies

[Federal Register Volume 77, Number 242 (Monday, December 17, 2012)]
[Notices]
[Page 74657]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-30265]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP12-494-000]


Gas Transmission Northwest LLC; Notice of Availability of the 
Environmental Assessment for the Proposed Carty Lateral Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the Carty 
Lateral Project, proposed by Gas Transmission Northwest LLC (GTN) in 
the above-referenced docket. GTN requests authorization to construct 
pipeline facilities in Morrow County, Oregon to provide up to 175,000 
dekatherms per day of new natural gas delivery capacity to the planned 
Carty Generating Station.
    The EA assesses the potential environmental effects of the 
construction and operation of the Carty Lateral Project in accordance 
with the requirements of the National Environmental Policy Act (NEPA). 
GTN's proposed Carty Lateral Project involves the construction of 
approximately 24.3 miles of 20-inch-diameter pipeline, one new meter 
station, and other appurtenant facilities. The FERC staff concludes 
that approval of the proposed project, with appropriate mitigating 
measures, would not constitute a major federal action significantly 
affecting the quality of the human environment.
    The U.S. Fish and Wildlife Service and the Morrow County Planning 
Department participated as cooperating agencies in the preparation of 
the EA. Cooperating agencies have jurisdiction by law or special 
expertise with respect to resources potentially affected by the 
proposal and participate in the NEPA analysis.
    The FERC staff mailed copies of the EA to federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; 
potentially affected landowners and other interested individuals and 
groups; newspapers and libraries in the project area; and parties to 
this proceeding. In addition, the EA is available for public viewing on 
the FERC's Web site (www.ferc.gov) using the eLibrary link. A limited 
number of copies of the EA are available for distribution and public 
inspection at: Federal Energy Regulatory Commission, Public Reference 
Room, 888 First Street NE., Room 2A, Washington, DC 20426, (202) 502-
8371.
    Any person wishing to comment on the EA may do so. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
The more specific your comments, the more useful they will be. To 
ensure that the Commission has the opportunity to consider your 
comments prior to making its decision on this project, it is important 
that we receive your comments in Washington, DC on or before January 
16, 2013.
    For your convenience, there are three methods you can use to file 
your comments to the Commission. In all instances, please reference the 
project docket number (CP12-494-000) with your submission. The 
Commission encourages electronic filing of comments and has expert 
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can also file your comments electronically using the 
eFiling feature on the Commission's Web site (www.ferc.gov) under the 
link to Documents and Filings. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 
20426.
    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the Commission's Rules of 
Practice and Procedures (18 CFR 385.214). \1\ Only intervenors have the 
right to seek rehearing of the Commission's decision. The Commission 
grants affected landowners and others with environmental concerns 
intervenor status upon showing good cause by stating that they have a 
clear and direct interest in this proceeding which no other party can 
adequately represent. Simply filing environmental comments will not 
give you intervenor status, but you do not need intervenor status to 
have your comments considered.
---------------------------------------------------------------------------

    \1\ See the previous discussion on the methods for filing 
comments.
---------------------------------------------------------------------------

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search,'' and enter the docket number 
excluding the last three digits in the Docket Number field (i.e., CP12-
494). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/esubscribenow.htm.

    Dated: December 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-30265 Filed 12-14-12; 8:45 am]
BILLING CODE 6717-01-P