plans to address flooding issues in
Findlay and Ottawa by evaluating a
series of flood risk management
measures within the vicinity of these
two affected areas.
Proposed Action: In accordance with
40 CFR parts 1500–1508 and Engineer
Regulation 200–2–2, an EIS is being
prepared for the Federal Flood Risk
Management Study within the
Blanchard River watershed including
the communities of Findlay and Ottawa
to ensure full and fair consideration of
significant environmental impacts. This
EIS will inform decision-makers and the
public of reasonable alternatives to
reduce the risk of loss of life and
property damage from flooding in these
areas and that would also avoid or
minimize adverse impacts and/or
enhance the quality of the human
environment. The proposed EIS will
focus on the implementation of flood
risk management measures associated
with the Blanchard River in and within
the vicinity of Findlay and Ottawa. The
EIS will be consistent with sound
engineering practices and will be
drafted concurrently with actions to
achieve compliance with other
applicable Federal environmental
compliance requirements, including
those established by Section 404 of the
Clean Water Act. In addition, the EIS
will be consistent with State and local
plans.
Reasonable Alternatives: It is Corps of
Engineers planning policy to consider
practicable and relevant alternative
management measures, including a no
action alternative. While the preferred
alternative has not yet been established,
the alternative plans considered in the
EIS will consist of an array of structural
and nonstructural measures for both
Findlay and Ottawa. Structural
measures may include, but are not
limited to, channel realignment/
diversion, levees and floodwall creation,
culvert modification, and the creation of
flood storage areas, including wetlands,
bermed containment areas, and water
detention areas/reservoirs.
Nonstructural measures may include,
but not be limited to, elevating existing
buildings, relocation or acquisition of
flood-prone structures, wet and dry
floodproofing, as well as the
development and implementation of a
flood warning system or flood
emergency preparedness plan.
Scoping Process: The Corps of
Engineers invites affected Federal, State
and local agencies, interested Indian
Nations, and other concerned
organizations and individuals to
participate in development of the EIS.
An initial Scoping Document was
distributed in June 2008 and the Corps
VerDate Mar<15>2010
15:17 Nov 29, 2012
Jkt 229001
of Engineers will be conducting a
second round of scoping, and four
public scoping meetings in December,
2012, which include: (1) 6:30 p.m. on
December 10, 2012 at the OttawaGlandorf High School Auditorium, 630
Glendale Ave. Ottawa, OH; (2) 9:00 a.m.
on December 11, 2012 at the Putnam
County Educational Service Center, 124
Putnam Parkway, Ottawa, OH; (3) 7:00
a.m. on December 11, 2012 at the
Findlay High School Auditorium, 1200
Broad Avenue, Findlay, OH; and, (4)
9:00 a.m. December 12, 2012 at the
Hancock County Agricultural Service
Center, 7868 County Road 140, Findlay,
OH. All written comments received by
the Corps of Engineers during the
scoping period and throughout the EIS
process will be considered in the
preparation of the EIS.
The Draft EIS is tentatively scheduled
to be available for public review in
December 2013. The Final EIS is
tentatively scheduled to be available for
public review in September 2014.
Dated: November 20, 2012.
Owen J. Beaudoin,
Lieutenant Colonel, U.S. Army Corps of
Engineers, District Commander.
[FR Doc. 2012–28887 Filed 11–29–12; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF DEFENSE
Department of the Army; Corps of
Engineers
Notice of Correction to the Notice of
Intent To Prepare a Joint
Environmental Impact Statement (EIS)
for the Gateway Pacific Terminals Bulk
Dry Goods Shipping Facility and the
Custer Spur Rail Expansion Projects
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice of Correction.
AGENCY:
This notice corrects the
location and date of one of the public
scoping meetings listed in the Notice of
Intent published in the Federal Register
(77 FR 58531) on Friday, September 21,
2012. The venue for the Seattle public
scoping meeting previously scheduled
for November 13, 2012 is no longer
available. The Seattle public scoping
meeting will be held at the Washington
State Convention Center, Rooms 6A, 6B,
6C, and 6D, 800 Convention Place,
Seattle, WA 98101 on Monday,
December 17, 2012, from 4:00 p.m. to
7:00 p.m.
FOR FURTHER INFORMATION CONTACT: Mr.
Randel Perry via email at:
randel.j.perry@usace.army.mil, by
phone at (360) 734–3156, or by regular
SUMMARY:
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
71405
mail at Mr. Randel Perry, U.S. Army
Corps of Engineers, Seattle District, Care
of: GPT/BNSF Custer Spur EIS Co-Lead
Agencies, 1100 112th Avenue Northeast,
Suite 400, Bellevue, WA 98004.
Additional information on scoping
meetings can be found at
www.eisgatewaypacificwa.gov.
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 2012–28885 Filed 11–29–12; 8:45 am]
BILLING CODE 3720–58–P
DEPARTMENT OF EDUCATION
[Docket No.: ED–2012–ICCD–0064]
Agency Information Collection
Activities; Submission to the Office of
Management and Budget for Review
and Approval; Comment Request;
Early Reading First: Grant
Performance Report
Department of Education (ED),
Office of Elementary and Secondary
Education (OESE).
ACTION: Notice.
AGENCY:
In accordance with the
Paperwork Reduction of 1995 (44 U.S.C.
chapter 3501 et seq.), ED is proposing a
revision of an existing information
collection.
DATES: Interested persons are invited to
submit comments on or before
December 31, 2012.
ADDRESSES: Comments submitted in
response to this notice should be
submitted electronically through the
Federal eRulemaking Portal at https://
www.regulations.gov by selecting
Docket ID number ED–2012–ICCD–0064
or via postal mail, commercial delivery,
or hand delivery. Please note that
comments submitted by fax or email
and those submitted after the comment
period will not be accepted. Written
requests for information or comments
submitted by postal mail or delivery
should be addressed to the Director of
the Information Collection Clearance
Division, U.S. Department of Education,
400 Maryland Avenue SW., LBJ, Room
2E117, Washington, DC 20202–4537.
FOR FURTHER INFORMATION CONTACT:
Electronically mail
ICDocketMgr@ed.gov. Please do not
send comments here.
SUPPLEMENTARY INFORMATION: The
Department of Education (ED), in
accordance with the Paperwork
Reduction Act of 1995 (PRA) (44 U.S.C.
3506(c)(2)(A)), provides the general
public and Federal agencies with an
opportunity to comment on proposed,
revised, and continuing collections of
SUMMARY:
E:\FR\FM\30NON1.SGM
30NON1
Agencies
[Federal Register Volume 77, Number 231 (Friday, November 30, 2012)]
[Notices]
[Page 71405]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-28885]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army; Corps of Engineers
Notice of Correction to the Notice of Intent To Prepare a Joint
Environmental Impact Statement (EIS) for the Gateway Pacific Terminals
Bulk Dry Goods Shipping Facility and the Custer Spur Rail Expansion
Projects
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.
ACTION: Notice of Correction.
-----------------------------------------------------------------------
SUMMARY: This notice corrects the location and date of one of the
public scoping meetings listed in the Notice of Intent published in the
Federal Register (77 FR 58531) on Friday, September 21, 2012. The venue
for the Seattle public scoping meeting previously scheduled for
November 13, 2012 is no longer available. The Seattle public scoping
meeting will be held at the Washington State Convention Center, Rooms
6A, 6B, 6C, and 6D, 800 Convention Place, Seattle, WA 98101 on Monday,
December 17, 2012, from 4:00 p.m. to 7:00 p.m.
FOR FURTHER INFORMATION CONTACT: Mr. Randel Perry via email at:
randel.j.perry@usace.army.mil, by phone at (360) 734-3156, or by
regular mail at Mr. Randel Perry, U.S. Army Corps of Engineers, Seattle
District, Care of: GPT/BNSF Custer Spur EIS Co-Lead Agencies, 1100
112th Avenue Northeast, Suite 400, Bellevue, WA 98004. Additional
information on scoping meetings can be found at
www.eisgatewaypacificwa.gov.
Brenda S. Bowen,
Army Federal Register Liaison Officer.