Public Utility District No. 1 of Snohomish County, Washington; Notice of Revised Procedural Schedule for Processing the License Application, 70426 [2012-28546]

Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES 70426 Federal Register / Vol. 77, No. 227 / Monday, November 26, 2012 / Notices filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. k. Description of Application: The exemptee proposes to amend the site and powerhouse arrangements and the installed capacity based on the project’s final design. Under the proposed amendment, the powerhouse footprint would increase from 39 feet by 42 feet to 46 feet by 46 feet, the powerhouse would be constructed approximately 40 feet to the northwest, the discharge pipe would be relocated from the south side to the east side of the powerhouse, and the authorized installed capacity would increase from 1,300 kilowatts (kW) to 1,350 kW. No change in project operation is proposed. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site using the ‘‘eLibrary’’ link at https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp. Enter the docket number excluding the last three digits (P–13946) in the docket number field to access the document. You may also register online at https://www.ferc.gov/ docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1– 866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but VerDate Mar<15>2010 16:24 Nov 23, 2012 Jkt 229001 only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: November 16, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–28468 Filed 11–23–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12690–005] Public Utility District No. 1 of Snohomish County, Washington; Notice of Revised Procedural Schedule for Processing the License Application Based on the information in the record now, the Commission will continue processing the license application for the Admiralty Inlet Pilot Tidal Project according to the schedule below. Revisions to the schedule may be made as appropriate. Milestone Commission issues non-draft EA. Comments on EA due Target date January 18, 2013. February 18, 2013. Dated: November 19, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–28546 Filed 11–23–12; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP13–283–000. Applicants: East Tennessee Natural Gas, LLC. Description: Contracting Process Nov2012 Filing to be effective 1/1/2013. Filed Date: 11/15/12. Accession Number: 20121115–5076. Comments Due: 5 p.m. ET 11/27/12. Docket Numbers: RP13–284–000. Applicants: Maritimes & Northeast Pipeline, L.L.C. Description: Contracting Processes Nov2012 Filing to be effective 1/1/2013. Filed Date: 11/15/12. Accession Number: 20121115–5082. Comments Due: 5 p.m. ET 11/27/12. Docket Numbers: RP13–285–000. Applicants: Ozark Gas Transmission, L.L.C. Description: Contracting Processes Nov2012 Filing to be effective 1/1/2013. Filed Date: 11/15/12. Accession Number: 20121115–5083. Comments Due: 5 p.m. ET 11/27/12. Docket Numbers: RP13–286–000. Applicants: Discovery Gas Transmission L.L.C. Description: 2013 HMRE Filing to be effective 1/1/2013. Filed Date: 11/15/12. Accession Number: 20121115–5085. Comments Due: 5 p.m. ET 11/27/12. Docket Numbers: RP13–287–000. Applicants: Saltville Gas Storage Company L.L.C. Description: Contracting Processes Nov2012 Filing to be effective 1/1/2013. Filed Date: 11/15/12. Accession Number: 20121115–5089. Comments Due: 5 p.m. ET 11/27/12. Docket Numbers: RP13–288–000. Applicants: Egan Hub Storage, LLC. Description: Contracting Processes Nov2012 Filing to be effective 1/1/2013. Filed Date: 11/15/12. Accession Number: 20121115–5092. Comments Due: 5 p.m. ET 11/27/12. Docket Numbers: RP13–289–000. Applicants: Bobcat Gas Storage. Description: Contracting Processes Nov2012 Filing to be effective 1/1/2013. Filed Date: 11/15/12. Accession Number: 20121115–5093. Comments Due: 5 p.m. ET 11/27/12. Docket Numbers: RP13–290–000. Applicants: Iroquois Gas Transmission System, L.P. E:\FR\FM\26NON1.SGM 26NON1

Agencies

[Federal Register Volume 77, Number 227 (Monday, November 26, 2012)]
[Notices]
[Page 70426]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-28546]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12690-005]


Public Utility District No. 1 of Snohomish County, Washington; 
Notice of Revised Procedural Schedule for Processing the License 
Application

    Based on the information in the record now, the Commission will 
continue processing the license application for the Admiralty Inlet 
Pilot Tidal Project according to the schedule below. Revisions to the 
schedule may be made as appropriate.

------------------------------------------------------------------------
              Milestone                           Target date
------------------------------------------------------------------------
Commission issues non-draft EA.......  January 18, 2013.
Comments on EA due...................  February 18, 2013.
------------------------------------------------------------------------


    Dated: November 19, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-28546 Filed 11-23-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.