Public Utility District No. 1 of Snohomish County, Washington; Notice of Revised Procedural Schedule for Processing the License Application, 70426 [2012-28546]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
70426
Federal Register / Vol. 77, No. 227 / Monday, November 26, 2012 / Notices
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervener files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Application: The
exemptee proposes to amend the site
and powerhouse arrangements and the
installed capacity based on the project’s
final design. Under the proposed
amendment, the powerhouse footprint
would increase from 39 feet by 42 feet
to 46 feet by 46 feet, the powerhouse
would be constructed approximately 40
feet to the northwest, the discharge pipe
would be relocated from the south side
to the east side of the powerhouse, and
the authorized installed capacity would
increase from 1,300 kilowatts (kW) to
1,350 kW. No change in project
operation is proposed.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site
using the ‘‘eLibrary’’ link at https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp. Enter the docket
number excluding the last three digits
(P–13946) in the docket number field to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
VerDate Mar<15>2010
16:24 Nov 23, 2012
Jkt 229001
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Dated: November 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–28468 Filed 11–23–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12690–005]
Public Utility District No. 1 of
Snohomish County, Washington;
Notice of Revised Procedural Schedule
for Processing the License Application
Based on the information in the
record now, the Commission will
continue processing the license
application for the Admiralty Inlet Pilot
Tidal Project according to the schedule
below. Revisions to the schedule may be
made as appropriate.
Milestone
Commission issues
non-draft EA.
Comments on EA due
Target date
January 18, 2013.
February 18, 2013.
Dated: November 19, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–28546 Filed 11–23–12; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP13–283–000.
Applicants: East Tennessee Natural
Gas, LLC.
Description: Contracting Process
Nov2012 Filing to be effective 1/1/2013.
Filed Date: 11/15/12.
Accession Number: 20121115–5076.
Comments Due: 5 p.m. ET 11/27/12.
Docket Numbers: RP13–284–000.
Applicants: Maritimes & Northeast
Pipeline, L.L.C.
Description: Contracting Processes
Nov2012 Filing to be effective 1/1/2013.
Filed Date: 11/15/12.
Accession Number: 20121115–5082.
Comments Due: 5 p.m. ET 11/27/12.
Docket Numbers: RP13–285–000.
Applicants: Ozark Gas Transmission,
L.L.C.
Description: Contracting Processes
Nov2012 Filing to be effective 1/1/2013.
Filed Date: 11/15/12.
Accession Number: 20121115–5083.
Comments Due: 5 p.m. ET 11/27/12.
Docket Numbers: RP13–286–000.
Applicants: Discovery Gas
Transmission L.L.C.
Description: 2013 HMRE Filing to be
effective 1/1/2013.
Filed Date: 11/15/12.
Accession Number: 20121115–5085.
Comments Due: 5 p.m. ET 11/27/12.
Docket Numbers: RP13–287–000.
Applicants: Saltville Gas Storage
Company L.L.C.
Description: Contracting Processes
Nov2012 Filing to be effective 1/1/2013.
Filed Date: 11/15/12.
Accession Number: 20121115–5089.
Comments Due: 5 p.m. ET 11/27/12.
Docket Numbers: RP13–288–000.
Applicants: Egan Hub Storage, LLC.
Description: Contracting Processes
Nov2012 Filing to be effective 1/1/2013.
Filed Date: 11/15/12.
Accession Number: 20121115–5092.
Comments Due: 5 p.m. ET 11/27/12.
Docket Numbers: RP13–289–000.
Applicants: Bobcat Gas Storage.
Description: Contracting Processes
Nov2012 Filing to be effective 1/1/2013.
Filed Date: 11/15/12.
Accession Number: 20121115–5093.
Comments Due: 5 p.m. ET 11/27/12.
Docket Numbers: RP13–290–000.
Applicants: Iroquois Gas
Transmission System, L.P.
E:\FR\FM\26NON1.SGM
26NON1
Agencies
[Federal Register Volume 77, Number 227 (Monday, November 26, 2012)]
[Notices]
[Page 70426]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-28546]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12690-005]
Public Utility District No. 1 of Snohomish County, Washington;
Notice of Revised Procedural Schedule for Processing the License
Application
Based on the information in the record now, the Commission will
continue processing the license application for the Admiralty Inlet
Pilot Tidal Project according to the schedule below. Revisions to the
schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Commission issues non-draft EA....... January 18, 2013.
Comments on EA due................... February 18, 2013.
------------------------------------------------------------------------
Dated: November 19, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-28546 Filed 11-23-12; 8:45 am]