Gulf South Pipeline Company, LP; Notice of Intent To Prepare an Environmental Assessment for the Planned Southeast Market Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings, 70429-70431 [2012-28541]
Download as PDF
70429
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 227 / Monday, November 26, 2012 / Notices
affected by the project. The Commission
also determines whether or not the
project: (1) Would be located on a
navigable waterway; (2) would occupy
or affect public lands or reservations of
the United States; (3) would utilize
surplus water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the Docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents — All filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR
‘‘MOTIONS TO INTERVENE’’, as
applicable, and the Docket Number of
the particular application to which the
filing refers. A copy of any Motion to
Intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
VerDate Mar<15>2010
16:24 Nov 23, 2012
Jkt 229001
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Dated: November 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–28470 Filed 11–23–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF12–21–000]
Gulf South Pipeline Company, LP;
Notice of Intent To Prepare an
Environmental Assessment for the
Planned Southeast Market Expansion
Project, Request for Comments on
Environmental Issues, and Notice of
Public Scoping Meetings
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Southeast Market Expansion Project
(SEME Project) involving construction
and operation of facilities by Gulf South
Pipeline Company, LP (Gulf South) in
Jasper, Forrest, Perry, Greene, George,
and Jackson Counties, Mississippi and
Mobile County, Alabama. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on December
19, 2012.
You may submit comments in written
form or verbally. Further details on how
to submit written comments are in the
Public Participation section of this
notice. In lieu of or in addition to
sending written comments, the
Commission invites you to attend the
public scoping meetings scheduled as
follows:
Date and time
December 4,
2012, 7:00
PM EST.
PO 00000
Frm 00018
Location
New Augusta Elementary
School, 100 8th Avenue S,
New Augusta, MS, (601)
964–3226.
Fmt 4703
Sfmt 4703
Date and time
December 5,
2012, 7:00
PM EST.
December 6,
2012, 7:00
PM EST.
Location
Oak Park Elementary
School, 1205 Queensburg
Avenue, Laurel, MS, (601)
428–5046.
George County Middle
School, 330 Church
Street, Lucedale, MS,
(601) 947–3106.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
planned facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Web site (www.ferc.gov). This
fact sheet addresses a number of
typically-asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings.
Summary of the Planned Project
Gulf South plans to construct and
operate approximately 70 miles of new
30-inch-diameter and 24-inch-diameter
natural gas pipeline and 3 new
compressor stations in Mississippi and
Alabama. The SEME Project would
provide about 450 million standard
cubic feet of natural gas per day to the
Florida and Southeast markets via an
interconnect with Florida Gas
Transmission Company and a new high
pressure interconnect with Gulf South’s
existing Index 311 pipeline. According
to Gulf South, the project is necessary
to provide new natural gas
transportation capacity to meet an
increased level of gas supplies in the
region.
The SEME Project would consist of
the following:
• Construction of 70 miles of new 30inch-diameter and 24-inch-diameter
pipeline (approximately 42.2 miles and
E:\FR\FM\26NON1.SGM
26NON1
70430
Federal Register / Vol. 77, No. 227 / Monday, November 26, 2012 / Notices
27.8 miles, respectively), which would
begin near the southern terminus of
Petal Gas Storage, L.L.C.’s transmission
facilities in Forrest County, Mississippi
and end at Gulf South’s existing Index
311 pipeline tie-in, approximately 4.5
miles west of Semmes, Alabama;
• Installation of ancillary facilities
associated with the new pipeline
including one meter and regulating
station, five mainline valves, two pig 1
launchers, two pig receivers, and
overpressure protection devices; and
• Installation of three new
compressor stations, including:
D The Forrest Compressor Station,
which would be located in Forrest
County, Mississippi at the beginning of
the proposed 70-mile pipeline and
would provide 16,000 nominal
horsepower (hp) of compression;
D The Jasper Compressor Station,
which would be located on Gulf South’s
existing Index 818 pipeline in Jasper
County, Mississippi and would provide
13,222 nominal hp of compression; and
D The Moss Point Compressor Station,
which would be located at the
intersection of Gulf South’s existing
Index 300 pipeline and the Pascagoula
Lateral in Jackson County, Mississippi
and would provide 2,000 nominal hp of
compression.
The general location of the project
facilities is shown in Appendix 1.2
Land Requirements for Construction
Construction of the planned facilities
would disturb about 1,133 acres of land
for the aboveground facilities, pipeline,
and access roads. Following
construction, Gulf South would
maintain about 453 acres for permanent
operation of the project’s facilities; the
remaining acreage would be restored
and revert to former uses. About 80
percent of the planned pipeline route
parallels existing pipeline, utility, or
road rights-of-way.
The EA Process
mstockstill on DSK4VPTVN1PROD with NOTICES
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
1 A ‘‘pig’’ is a tool that the pipeline company
inserts into and pushes through the pipeline for
cleaning the pipeline, conducting internal
inspections, or other purposes.
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
VerDate Mar<15>2010
16:24 Nov 23, 2012
Jkt 229001
Necessity. NEPA also requires us 3 to
discover and address concerns the
public may have about proposals. This
process is referred to as scoping. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
planned project under these general
headings:
• Geology and soils;
• Land use;
• Water resources, fisheries, and
wetlands;
• Cultural resources;
• Vegetation and wildlife;
• Air quality and noise;
• Endangered and threatened species;
• Socioeconomics;
• Public safety; and
• Cumulative impacts.
We will also evaluate possible
alternatives to the planned project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Although no formal application has
been filed, we have already initiated our
NEPA review under the Commission’s
pre-filing process. The purpose of the
pre-filing process is to encourage early
involvement of interested stakeholders
and to identify and resolve issues before
the FERC receives an application. As
part of our pre-filing review, we have
begun to contact some federal and state
agencies to discuss their involvement in
the scoping process and the preparation
of the EA.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Depending on the comments
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before we make our
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section
below.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
3 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
environmental issues related to this
project to formally cooperate with us in
the preparation of the EA.4 Agencies
that would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with
applicable State Historic Preservation
Offices (SHPOs), and to solicit their
views and those of other government
agencies, interested Indian tribes, and
the public on the project’s potential
effects on historic properties.5 We will
define the project-specific Area of
Potential Effects (APE) in consultation
with the SHPOs as the project develops.
On natural gas facility projects, the APE
at a minimum encompasses all areas
subject to ground disturbance (examples
include construction right-of-way,
contractor/pipe storage yards,
compressor stations, and access roads).
Our EA for this project will document
our findings on the impacts on historic
properties and summarize the status of
consultations under section 106.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before December
19, 2012.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. In all
instances, please reference the project
docket number (PF12–21–000) with
your submission. The Commission
encourages electronic filing of
4 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, § 1501.6.
5 The Advisory Council on Historic Preservation
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
E:\FR\FM\26NON1.SGM
26NON1
Federal Register / Vol. 77, No. 227 / Monday, November 26, 2012 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature located on the Commission’s
Web site (www.ferc.gov) under the link
to Documents and Filings. This is an
easy method for interested persons to
submit brief, text-only comments on a
project;
(2) You can file your comments
electronically using the eFiling feature
located on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(Appendix 2).
Becoming an Intervenor
Once Gulf South files its application
with the Commission, you may want to
VerDate Mar<15>2010
16:24 Nov 23, 2012
Jkt 229001
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site. Please note that the
Commission will not accept requests for
intervenor status at this time. You must
wait until the Commission receives a
formal application for the project.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search’’ and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., PF12–
21). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Information about the project may also
be found on Gulf South’s Web site at
https://www.gulfsouthpl.com/
ExpansionProjectsGS.aspx.
Dated: November 19, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–28541 Filed 11–23–12; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
70431
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL13–21–000]
California Independent System
Operator Corporation; Notice
Establishing Answer Period to Limited
Emergency Protest
On November 16, 2012, JP Morgan
Ventures Energy Corp. (JPMVEC) filed a
Limited Emergency Protest (Protest)
regarding the comment period for the
California Independent System Operator
Corporation’s (CAISO) petition for
declaratory order and request for
expedited treatment filed on November
16, 2012. (See Notice of Petition for
Declaratory Order, November 16, 2012)
Upon consideration, notice is hereby
given that the date for filing answers to
JPMVEC’s Protest is shortened to and
including November 20, 2012.
Dated: November 19, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–28549 Filed 11–23–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR13–10–000]
Moss Bluff Hub, LLC; Notice of Filing
Take notice that on November 15,
2012, Moss Bluff Hub, LLC, (Moss Bluff)
filed to revise its Statement of Operating
Conditions (SOC) to reflect, among other
things modifications to Section 3
(Request for Storage Service), as more
fully described in the filing.
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
E:\FR\FM\26NON1.SGM
26NON1
Agencies
[Federal Register Volume 77, Number 227 (Monday, November 26, 2012)]
[Notices]
[Pages 70429-70431]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-28541]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF12-21-000]
Gulf South Pipeline Company, LP; Notice of Intent To Prepare an
Environmental Assessment for the Planned Southeast Market Expansion
Project, Request for Comments on Environmental Issues, and Notice of
Public Scoping Meetings
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Southeast Market Expansion
Project (SEME Project) involving construction and operation of
facilities by Gulf South Pipeline Company, LP (Gulf South) in Jasper,
Forrest, Perry, Greene, George, and Jackson Counties, Mississippi and
Mobile County, Alabama. The Commission will use this EA in its
decision-making process to determine whether the project is in the
public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues they need to evaluate in the EA. Please note that
the scoping period will close on December 19, 2012.
You may submit comments in written form or verbally. Further
details on how to submit written comments are in the Public
Participation section of this notice. In lieu of or in addition to
sending written comments, the Commission invites you to attend the
public scoping meetings scheduled as follows:
------------------------------------------------------------------------
Date and time Location
------------------------------------------------------------------------
December 4, 2012, 7:00 PM EST.......... New Augusta Elementary School,
100 8th Avenue S, New Augusta,
MS, (601) 964-3226.
December 5, 2012, 7:00 PM EST.......... Oak Park Elementary School,
1205 Queensburg Avenue,
Laurel, MS, (601) 428-5046.
December 6, 2012, 7:00 PM EST.......... George County Middle School,
330 Church Street, Lucedale,
MS, (601) 947-3106.
------------------------------------------------------------------------
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this planned
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the planned facilities. The company
would seek to negotiate a mutually acceptable agreement. However, if
the Commission approves the project, that approval conveys with it the
right of eminent domain. Therefore, if easement negotiations fail to
produce an agreement, the pipeline company could initiate condemnation
proceedings where compensation would be determined in accordance with
state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' is available for
viewing on the FERC Web site (www.ferc.gov). This fact sheet addresses
a number of typically-asked questions, including the use of eminent
domain and how to participate in the Commission's proceedings.
Summary of the Planned Project
Gulf South plans to construct and operate approximately 70 miles of
new 30-inch-diameter and 24-inch-diameter natural gas pipeline and 3
new compressor stations in Mississippi and Alabama. The SEME Project
would provide about 450 million standard cubic feet of natural gas per
day to the Florida and Southeast markets via an interconnect with
Florida Gas Transmission Company and a new high pressure interconnect
with Gulf South's existing Index 311 pipeline. According to Gulf South,
the project is necessary to provide new natural gas transportation
capacity to meet an increased level of gas supplies in the region.
The SEME Project would consist of the following:
Construction of 70 miles of new 30-inch-diameter and 24-
inch-diameter pipeline (approximately 42.2 miles and
[[Page 70430]]
27.8 miles, respectively), which would begin near the southern terminus
of Petal Gas Storage, L.L.C.'s transmission facilities in Forrest
County, Mississippi and end at Gulf South's existing Index 311 pipeline
tie-in, approximately 4.5 miles west of Semmes, Alabama;
Installation of ancillary facilities associated with the
new pipeline including one meter and regulating station, five mainline
valves, two pig \1\ launchers, two pig receivers, and overpressure
protection devices; and
---------------------------------------------------------------------------
\1\ A ``pig'' is a tool that the pipeline company inserts into
and pushes through the pipeline for cleaning the pipeline,
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------
Installation of three new compressor stations, including:
[ssquf] The Forrest Compressor Station, which would be located in
Forrest County, Mississippi at the beginning of the proposed 70-mile
pipeline and would provide 16,000 nominal horsepower (hp) of
compression;
[ssquf] The Jasper Compressor Station, which would be located on
Gulf South's existing Index 818 pipeline in Jasper County, Mississippi
and would provide 13,222 nominal hp of compression; and
[ssquf] The Moss Point Compressor Station, which would be located
at the intersection of Gulf South's existing Index 300 pipeline and the
Pascagoula Lateral in Jackson County, Mississippi and would provide
2,000 nominal hp of compression.
The general location of the project facilities is shown in Appendix
1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of the appendices were sent to all
those receiving this notice in the mail and are available at
www.ferc.gov using the link called ``eLibrary'' or from the
Commission's Public Reference Room, 888 First Street NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the planned facilities would disturb about 1,133
acres of land for the aboveground facilities, pipeline, and access
roads. Following construction, Gulf South would maintain about 453
acres for permanent operation of the project's facilities; the
remaining acreage would be restored and revert to former uses. About 80
percent of the planned pipeline route parallels existing pipeline,
utility, or road rights-of-way.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\3\ to discover and address concerns the public may have about
proposals. This process is referred to as scoping. The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. We will
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------
\3\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the planned project under these
general headings:
Geology and soils;
Land use;
Water resources, fisheries, and wetlands;
Cultural resources;
Vegetation and wildlife;
Air quality and noise;
Endangered and threatened species;
Socioeconomics;
Public safety; and
Cumulative impacts.
We will also evaluate possible alternatives to the planned project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Although no formal application has been filed, we have already
initiated our NEPA review under the Commission's pre-filing process.
The purpose of the pre-filing process is to encourage early involvement
of interested stakeholders and to identify and resolve issues before
the FERC receives an application. As part of our pre-filing review, we
have begun to contact some federal and state agencies to discuss their
involvement in the scoping process and the preparation of the EA.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments received during the scoping process, we may also publish
and distribute the EA to the public for an allotted comment period. We
will consider all comments on the EA before we make our recommendations
to the Commission. To ensure we have the opportunity to consider and
address your comments, please carefully follow the instructions in the
Public Participation section below.
With this notice, we are asking agencies with jurisdiction by law
and/or special expertise with respect to the environmental issues
related to this project to formally cooperate with us in the
preparation of the EA.\4\ Agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\4\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Sec. 1501.6.
---------------------------------------------------------------------------
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with applicable State Historic Preservation Offices (SHPOs), and to
solicit their views and those of other government agencies, interested
Indian tribes, and the public on the project's potential effects on
historic properties.\5\ We will define the project-specific Area of
Potential Effects (APE) in consultation with the SHPOs as the project
develops. On natural gas facility projects, the APE at a minimum
encompasses all areas subject to ground disturbance (examples include
construction right-of-way, contractor/pipe storage yards, compressor
stations, and access roads). Our EA for this project will document our
findings on the impacts on historic properties and summarize the status
of consultations under section 106.
---------------------------------------------------------------------------
\5\ The Advisory Council on Historic Preservation regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that the Commission receives them in Washington, DC on or before
December 19, 2012.
For your convenience, there are three methods you can use to submit
your comments to the Commission. In all instances, please reference the
project docket number (PF12-21-000) with your submission. The
Commission encourages electronic filing of
[[Page 70431]]
comments and has expert staff available to assist you at (202) 502-8258
or efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature located on the Commission's Web site (www.ferc.gov) under the
link to Documents and Filings. This is an easy method for interested
persons to submit brief, text-only comments on a project;
(2) You can file your comments electronically using the eFiling
feature located on the Commission's Web site (www.ferc.gov) under the
link to Documents and Filings. With eFiling, you can provide comments
in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
You can file a paper copy of your comments by mailing them to the
following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
planned project.
If we publish and distribute the EA, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (Appendix 2).
Becoming an Intervenor
Once Gulf South files its application with the Commission, you may
want to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are in
the User's Guide under the ``e-filing'' link on the Commission's Web
site. Please note that the Commission will not accept requests for
intervenor status at this time. You must wait until the Commission
receives a formal application for the project.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., PF12-
21). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information. Information about
the project may also be found on Gulf South's Web site at https://www.gulfsouthpl.com/ExpansionProjectsGS.aspx.
Dated: November 19, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-28541 Filed 11-23-12; 8:45 am]