Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA, 69759 [2012-28282]
Download as PDF
Federal Register / Vol. 77, No. 225 / Wednesday, November 21, 2012 / Rules and Regulations
emcdonald on DSK67QTVN1PROD with RULES
issuing Order No. 679, the Commission
believes that it is appropriate and in the
public interest to evaluate the impacts
of its incentives policy and give
guidance as to how the Commission will
implement that incentives policy going
forward. In order to further the mandate
of FPA section 219 and encourage
transmission investment in the future,
the Commission will continue to
monitor its incentives policy and may
identify new policy issues, trends, and
developments in transmission
investment that may warrant
modifications to the Commission’s
incentives policy. As part of this effort,
the Commission will continually assess
measures to further transparency in its
incentives policy and the impacts of
that policy on consumers.
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2012–1002]
Drawbridge Operation Regulation;
Upper Mississippi River, Dubuque, IA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Illinois
Central Railroad Drawbridge across the
Upper Mississippi River, mile 579.9, at
Dubuque, Iowa. The deviation is
necessary to allow the bridge owner
IV. Document Availability
time to perform preventive maintenance
that is essential to the continued safe
32. In addition to publishing the full
operation of the drawbridge.
text of this document in the Federal
Maintenance is scheduled in the winter
Register, the Commission provides all
when there is less impact on navigation,
interested persons an opportunity to
instead of scheduling work in the
view and/or print the contents of this
summer, when river traffic increases.
document via the Internet through
This deviation allows the bridge to open
FERC’s Home Page (https://www.ferc.gov) on signal if at least 24 hours advance
and in FERC’s Public Reference Room
notice is given.
during normal business hours (8:30 a.m. DATES: This deviation is effective from
to 5:00 p.m. Eastern time) at 888 First
7 a.m., December 16, 2012, to 7 a.m.
Street NE., Room 2A, Washington, DC
March 4, 2013.
20426.
ADDRESSES: Documents mentioned in
33. From FERC’s Home Page on the
this preamble as being available in the
Internet, this information is available on docket are part of docket USCG–2012–
1002 and are available online by going
eLibrary. The full text of this document
to https://www.regulations.gov, inserting
is available on eLibrary in PDF and
USCG–2012–1002 in the ‘‘Search’’ box
Microsoft Word format for viewing,
printing, and/or downloading. To access and then clicking ‘‘Search’’. They are
also available for inspection or copying
this document in eLibrary, type the
at the Docket Management Facility (M–
docket number excluding the last three
30), U.S. Department of Transportation,
digits of this document in the docket
West Building Ground Floor, Room
number field.
W12–140, 1200 New Jersey Avenue SE.,
34. User assistance is available for
Washington, DC 20590, between 9 a.m.
eLibrary and the FERC’s Web site during and 5 p.m., Monday through Friday,
normal business hours from FERC
except Federal holidays.
Online Support at 202–502–6652 (toll
FOR FURTHER INFORMATION CONTACT: If
free at 1–866–208–3676) or email at
you have questions on this rule, call or
ferconlinesupport@ferc.gov, or the
email Eric A. Washburn, Bridge
Public Reference Room at (202) 502–
Administrator, Western Rivers, Coast
8371, TTY (202) 502–8659. Email the
Guard; telephone 314–269–2378, email
Public Reference Room at
Eric.Washburn@uscg.mil. If you have
public.referenceroom@ferc.gov.
questions on viewing the docket, call
By the Commission. Commissioner Clark is Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
not participating.
9826.
Nathaniel J. Davis, Sr.,
SUPPLEMENTARY INFORMATION: The
Deputy Secretary.
Chicago, Central & Pacific Railroad
[FR Doc. 2012–28231 Filed 11–20–12; 8:45 am]
requested a temporary deviation for the
BILLING CODE 6717–01–P
Illinois Central Railroad Drawbridge
across the Upper Mississippi River, mile
579.9, at Dubuque, Iowa, to open on
signal if at least 24 hours advance notice
is given in order to facilitate needed
VerDate Mar<15>2010
15:08 Nov 20, 2012
Jkt 229001
SUMMARY:
PO 00000
Frm 00025
Fmt 4700
Sfmt 4700
69759
bridge maintenance and repairs. The
Rock Illinois Central Railroad
Drawbridge currently operates in
accordance with 33 CFR 117.5, which
states the general requirement that
drawbridges must open promptly and
fully for the passage of vessels when a
request to open is given in accordance
with the subpart. In order to facilitate
the needed bridge work, the drawbridge
must be kept in the closed-to-navigation
position. This deviation allows the
bridge to open on signal if at least 24
hours advance notice is given from 7
a.m. December 16, 2012 until 7 a.m.,
March 4, 2013.
There are no alternate routes for
vessels transiting this section of the
Upper Mississippi River.
The Illinois Central Railroad
Drawbridge, in the closed-to-navigation
position, provides a vertical clearance of
19.9 feet above normal pool. Navigation
on the waterway consists primarily of
commercial tows and recreational
watercraft. The drawbridge will open if
at least 24-hours advance notice is
given. This temporary deviation has
been coordinated with waterway users.
No objections were received.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: November 8, 2012.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2012–28282 Filed 11–20–12; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2011–0937]
RIN 1625–AA09
Drawbridge Operation Regulation;
Black River, La Crosse, WI
Coast Guard, DHS.
Final rule.
AGENCY:
ACTION:
The Coast Guard is modifying
the operating schedule that governs the
Canadian Pacific Railroad Drawbridge
across the Black River at Mile 1.0 near
La Crosse, Wisconsin. The drawspan
shall immediately open upon demand
once the vessel requiring an opening
establishes contact with the remote
operator located in Minneapolis,
SUMMARY:
E:\FR\FM\21NOR1.SGM
21NOR1
Agencies
[Federal Register Volume 77, Number 225 (Wednesday, November 21, 2012)]
[Rules and Regulations]
[Page 69759]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-28282]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2012-1002]
Drawbridge Operation Regulation; Upper Mississippi River,
Dubuque, IA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Illinois Central Railroad
Drawbridge across the Upper Mississippi River, mile 579.9, at Dubuque,
Iowa. The deviation is necessary to allow the bridge owner time to
perform preventive maintenance that is essential to the continued safe
operation of the drawbridge. Maintenance is scheduled in the winter
when there is less impact on navigation, instead of scheduling work in
the summer, when river traffic increases. This deviation allows the
bridge to open on signal if at least 24 hours advance notice is given.
DATES: This deviation is effective from 7 a.m., December 16, 2012, to 7
a.m. March 4, 2013.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2012-1002 and are available online
by going to https://www.regulations.gov, inserting USCG-2012-1002 in the
``Search'' box and then clicking ``Search''. They are also available
for inspection or copying at the Docket Management Facility (M-30),
U.S. Department of Transportation, West Building Ground Floor, Room
W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or email Eric A. Washburn, Bridge Administrator, Western Rivers,
Coast Guard; telephone 314-269-2378, email Eric.Washburn@uscg.mil. If
you have questions on viewing the docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Chicago, Central & Pacific Railroad
requested a temporary deviation for the Illinois Central Railroad
Drawbridge across the Upper Mississippi River, mile 579.9, at Dubuque,
Iowa, to open on signal if at least 24 hours advance notice is given in
order to facilitate needed bridge maintenance and repairs. The Rock
Illinois Central Railroad Drawbridge currently operates in accordance
with 33 CFR 117.5, which states the general requirement that
drawbridges must open promptly and fully for the passage of vessels
when a request to open is given in accordance with the subpart. In
order to facilitate the needed bridge work, the drawbridge must be kept
in the closed-to-navigation position. This deviation allows the bridge
to open on signal if at least 24 hours advance notice is given from 7
a.m. December 16, 2012 until 7 a.m., March 4, 2013.
There are no alternate routes for vessels transiting this section
of the Upper Mississippi River.
The Illinois Central Railroad Drawbridge, in the closed-to-
navigation position, provides a vertical clearance of 19.9 feet above
normal pool. Navigation on the waterway consists primarily of
commercial tows and recreational watercraft. The drawbridge will open
if at least 24-hours advance notice is given. This temporary deviation
has been coordinated with waterway users. No objections were received.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: November 8, 2012.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2012-28282 Filed 11-20-12; 8:45 am]
BILLING CODE 9110-04-P