Gulf South Pipeline Company, LP; Notice of Request Under Blanket Authorization, 69449-69450 [2012-28011]

Download as PDF Federal Register / Vol. 77, No. 223 / Monday, November 19, 2012 / Notices Constellation Energy Commodities Group, Inc., Constellation Energy Federal Energy Regulatory Commodities Group Maine, LLC, Commission Constellation Mystic Power, LLC, Constellation NewEnergy, Inc., Combined Notice of Filings #2 Constellation Power Source Generation, Inc., Cow Branch Wind Power, L.L.C., Take notice that the Commission received the following electric corporate CR Clearing, LLC, Criterion Power Partners, LLC, Exelon Energy Company, filings: Exelon Framingham LLC, Exelon New Docket Numbers: EC13–34–000. Boston, LLC, Exelon Generation Applicants: Dynasty Power Inc. Company, LLC, Exelon New England Description: Application of Dynasty Power Marketing, LP, Exelon West Power Inc. under FPA Section 203 Medway, LLC, Exelon Wind 4, LLC, under EC13–34. Exelon Wyman, LLC, Handsome Lake Filed Date: 11/9/12. Energy, LLC, Harvest Windfarm, LLC, Accession Number: 20121109–5076. High Mesa Energy, LLC, Michigan Wind Comments Due: 5 p.m. ET 11/30/12. 1, LLC, Michigan Wind 2, LLC, PECO Docket Numbers: EC13–35–000. Energy Company, Safe Harbor Water Applicants: High Prairie Wind Farm Power Corporation, Shooting Star Wind II, LLC, Old Trail Wind Farm, LLC, Project, LLC, Tuana Springs Energy, Telocaset Wind Power Partners, LLC. LLC, Wildcat Wind, LLC, Wind Capital Description: Application for Holdings, LLC, Harvest Windfarm II, Authorization for Disposition of LLC. Jurisdictional Facilities and Request for Description: Notice of Non-Material Expedited Action of High Prairie Wind Change in Status of AV Solar Ranch 1, Farm II, LLC, et al. LLC, et al. Filed Date: 11/9/12. Filed Date: 11/9/12. Accession Number: 20121109–5138. Accession Number: 20121109–5092. Comments Due: 5 p.m. ET 11/30/12. Comments Due: 5 p.m. ET 11/30/12. Take notice that the Commission received the following electric rate Docket Numbers: ER13–346–000. filings: Applicants: Upper Peninsula Power Docket Numbers: ER10–2179–015; Company. ER10–2181–015; ER10–2182–015. Description: Upper Peninsula Power Applicants: Calvert Cliffs Nuclear Company submits Notice of Power Plant, LLC, Nine Mile Point Cancellation of Multiple Rate Nuclear Station, LLC, R.E. Ginna Schedules. Nuclear Power Plant, LLC. Filed Date: 11/9/12. Description: Notice of Non-Material Accession Number: 20121109–5078. Change in Status of Calvert Cliffs Comments Due: 5 p.m. ET 11/30/12. Nuclear Power Plant, LLC, et al. The filings are accessible in the Filed Date: 11/9/12. Commission’s eLibrary system by Accession Number: 20121109–5091. clicking on the links or querying the Comments Due: 5 p.m. ET 11/30/12. docket number. Docket Numbers: ER12–2178–002; Any person desiring to intervene or ER10–2172–013; ER12–2311–002; protest in any of the above proceedings ER11–2016–008; ER10–2184–013; must file in accordance with Rules 211 ER10–2183–010; ER10–1048–010 ER10– and 214 of the Commission’s 2176–014; ER10–2192–013; ER11–2056– Regulations (18 CFR 385.211 and 007; ER10–2178–013; ER10–2174–013; 385.214) on or before 5:00 p.m. Eastern ER11–2014–010; ER11–2013–010 ER10– time on the specified comment date. 3308–012; ER10–1017–009; ER10–1020– Protests may be considered, but 009; ER10–1145–009; ER10–1144–008; intervention is necessary to become a ER10–1078–009; ER10–1079–009; party to the proceeding. ER10–1080–009; ER11–2010–010; eFiling is encouraged. More detailed ER10–1081–009; ER10–2180–013; information relating to filing ER11–2011–009; ER12–2201–003; requirements, interventions, protests, ER12–2528–001; ER11–2009–009; service, and qualifying facilities filings ER11–3989–008; ER10–1143–009; can be found at: https://www.ferc.gov/ ER11–2780–008; ER12–1829–002; docs-filing/efiling/filing-req.pdf. For ER11–2007–008; ER12–1223–007; other information, call (866) 208–3676 ER11–2005–010. (toll free). For TTY, call (202) 502–8659. Applicants: AV Solar Ranch 1, LLC, Dated: November 9, 2012. Baltimore Gas and Electric Company, Nathaniel J. Davis, Sr., Beebe Renewable Energy, LLC, Cassia Gulch Wind Park, LLC, CER Generation Deputy Secretary. [FR Doc. 2012–28009 Filed 11–16–12; 8:45 am] II, LLC, CER Generation, LLC, Commonwealth Edison Company, BILLING CODE 6717–01–P pmangrum on DSK3VPTVN1PROD with NOTICES DEPARTMENT OF ENERGY VerDate Mar<15>2010 14:04 Nov 16, 2012 Jkt 229001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 69449 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13–12–000] Gulf South Pipeline Company, LP; Notice of Request Under Blanket Authorization Take notice that on November 1, 2012, Gulf South Pipeline Company, LP (Gulf South), 9 Greenway Plaza, Suite 2800, Houston, TX 77046, filed in Docket No. CP13–12–000, an application pursuant to sections 157.205(b), 157.208(c), 157.210 and 157.216 of the Commission’s Regulations under the Natural Gas Act (NGA) as amended, to construct certain facilities at its Rodrigue Compressor Station and to abandon in place an idled compressor unit at its Napoleonville Compressor Station in Assumption Parish, Louisiana, under Gulf South’s blanket certificate issued in Docket No. CP82–430–000, all as more fully set forth in the application which is on file with the Commission and open to public inspection. Gulf South is proposing these modifications in order to provide transportation service to Entergy Louisiana, LLC’s Ninemile Power Plant in Assumption Parish, Louisiana. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Michael E. McMahon, Senior Vice President and General Counsel, J. Kyle Stephens, Vice President, Regulatory Affairs or M.L. Gutierrez, Director, Regulatory Affairs, Boardwalk Pipeline Partners, LP, 9 Greenway Plaza, Suite 2800, Houston, TX 77046 at telephone (713) 479–8252, fax (713) 479–1745 or email: Mike.McMahon@bwpmlp.com, Kyle.Stephens@bwpmlp.com or Nell.Gutierrez@bwpmlp.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed E:\FR\FM\19NON1.SGM 19NON1 69450 Federal Register / Vol. 77, No. 223 / Monday, November 19, 2012 / Notices activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Docket No. Terra-Gen Dixie Valley, LLC. Tucson Electric Power Company. UNS Electric, Inc ............... Public Service Company of New Mexico. Arizona Public Service Company. El Paso Electric Company Black Hills Power, Inc., et al. Black Hills Colorado Electric Utility Company. NV Energy, Inc .................. Cheyenne Light, Fuel and Power Company. Avista Corporation ............. Avista Corporation ............. Puget Sound Energy ......... Puget Sound Energy ......... Bonneville Power Administration. California Independent System Operator Corporation. ER13–76–000 ER13–77–000 ER13–78–000 ER13–79–000 ER13–82–000 ER13–91–000 ER13–96–000 ER13–97–000 ER13–105–000 ER13–120–000 ER13–93–000 ER13–94–000 ER13–98–000 ER13–99–000 NJ13–1–000 ER13–103–000 BILLING CODE 6717–01–P The Federal Energy Regulatory Commission (Commission) hereby gives notice that on November 16, 2012, members of its staff will attend a meeting conducted by representatives of WestConnect, ColumbiaGrid, Northern Tier Transmission Group, and the California Independent System Operator regarding the interregional coordination requirements established by Order No. 1000. Information regarding this meeting, including the meeting agenda, may be found at www.nttg.biz. The meeting is open to all stakeholders and Commission staff’s attendance is part of the Commission’s ongoing outreach efforts. The meeting may discuss matters at issue in the above captioned dockets. For further information, contact Saeed Farrokhpay at saeed.farrokhpay@ferc.gov. DEPARTMENT OF ENERGY Dated: November 13, 2012. Kimberly D. Bose, Secretary. Dated: November 13, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–28011 Filed 11–16–12; 8:45 am] [FR Doc. 2012–28010 Filed 11–16–12; 8:45 am] Federal Energy Regulatory Commission BILLING CODE 6717–01–P Notice of FERC Staff Attendance pmangrum on DSK3VPTVN1PROD with NOTICES Docket No. PacifiCorp .......................... Deseret Generation & Transmission Cooperative, Inc. Northwestern Corporation (Montana). Portland General Electric Company. Idaho Power Company ...... Public Service Company of Colorado. VerDate Mar<15>2010 ER13–64–000 ER13–65–000 ER13–67–000 ER13–68–000 ER13–127–000 ER13–75–000 14:04 Nov 16, 2012 Jkt 229001 ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OAR–2007–1184; FRL–9753–1] Proposed Information Collection Request; Comment Request; Emissions Certification and Compliance Requirements for Locomotives and Locomotive Engines (Renewal) Environmental Protection Agency (EPA). AGENCY: PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 ACTION: Notice. The Environmental Protection Agency is planning to submit an information collection request (ICR), ‘‘Emissions Certification and Compliance Requirements for Locomotives and Locomotive Engines (Renewal).’’ (EPA ICR No. 1800–07, OMB Control No. 2060–0392) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). Before doing so, EPA is soliciting public comments on specific aspects of the proposed information collection as described below. This is a proposed extension of the ICR, which is currently approved through February 28, 2013. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. DATES: Comments must be submitted on or before January 18, 2013. ADDRESSES: Submit your comments, referencing Docket ID No. EPA–HQ– OAR–2007–1184 online using www.regulations.gov (our preferred method), by email to a-and-rDocket@epa.gov or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW., Washington, DC 20460. EPA’s policy is that all comments received will be included in the public docket without change including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. FOR FURTHER INFORMATION CONTACT: Nydia Yanira Reyes-Morales, Environmental Protection Agency, 1200 Pennsylvania Avenue NW., Mail Code 6403J, Washington, DC 20460; telephone number: 202–343–9264; fax number: 202–343–2804; email address: reyes-morales.nydia@epa.gov. SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail the information that the EPA will be collecting are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov or in person at the EPA Docket Center, EPA West, Room 3334, 1301 Constitution Ave. NW., Washington, DC. The telephone number for the Docket Center is 202–566–1744. For additional information about EPA’s public docket, visit https://www.epa.gov/ dockets. SUMMARY: E:\FR\FM\19NON1.SGM 19NON1

Agencies

[Federal Register Volume 77, Number 223 (Monday, November 19, 2012)]
[Notices]
[Pages 69449-69450]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-28011]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP13-12-000]


Gulf South Pipeline Company, LP; Notice of Request Under Blanket 
Authorization

    Take notice that on November 1, 2012, Gulf South Pipeline Company, 
LP (Gulf South), 9 Greenway Plaza, Suite 2800, Houston, TX 77046, filed 
in Docket No. CP13-12-000, an application pursuant to sections 
157.205(b), 157.208(c), 157.210 and 157.216 of the Commission's 
Regulations under the Natural Gas Act (NGA) as amended, to construct 
certain facilities at its Rodrigue Compressor Station and to abandon in 
place an idled compressor unit at its Napoleonville Compressor Station 
in Assumption Parish, Louisiana, under Gulf South's blanket certificate 
issued in Docket No. CP82-430-000, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection. Gulf South is proposing these modifications in order to 
provide transportation service to Entergy Louisiana, LLC's Ninemile 
Power Plant in Assumption Parish, Louisiana. The filing may also be 
viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 
208-3676, or TTY, contact (202) 502-8659.
    Any questions concerning this application may be directed to 
Michael E. McMahon, Senior Vice President and General Counsel, J. Kyle 
Stephens, Vice President, Regulatory Affairs or M.L. Gutierrez, 
Director, Regulatory Affairs, Boardwalk Pipeline Partners, LP, 9 
Greenway Plaza, Suite 2800, Houston, TX 77046 at telephone (713) 479-
8252, fax (713) 479-1745 or email: Mike.McMahon@bwpmlp.com, 
Kyle.Stephens@bwpmlp.com or Nell.Gutierrez@bwpmlp.com.
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to Section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed

[[Page 69450]]

activity shall be deemed to be authorized effective the day after the 
time allowed for filing a protest. If a protest is filed and not 
withdrawn within 30 days after the allowed time for filing a protest, 
the instant request shall be treated as an application for 
authorization pursuant to Section 7 of the NGA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentary, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 7 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.

    Dated: November 13, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-28011 Filed 11-16-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.