Parker Knoll Hydro, LLC; Notice of Intent To Prepare An Environmental Impact Statement and Notice of Scoping Meetings and Soliciting Scoping Comments, 68764-68765 [2012-27960]
Download as PDF
68764
Federal Register / Vol. 77, No. 222 / Friday, November 16, 2012 / Notices
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before December
10, 2012.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP13–3–000) with your
submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You can file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
mstockstill on DSK4VPTVN1PROD with NOTICES
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials; Native
American Tribes; other interested
parties; and local libraries and
newspapers. This list also includes all
affected landowners (as defined in the
Commission’s regulations) who are
current right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
VerDate Mar<15>2010
15:43 Nov 15, 2012
Jkt 229001
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP13–3). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
EventCalendar/EventsList.aspx along
with other related information.
Dated: November 9, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–27958 Filed 11–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13239–002]
Parker Knoll Hydro, LLC; Notice of
Intent To Prepare An Environmental
Impact Statement and Notice of
Scoping Meetings and Soliciting
Scoping Comments
Take notice that the following
hydroelectric applications have been
filed with Commission and are available
for public inspection:
a. Type of Application: New Major
License.
b. Project No.: 13239.
c. Date filed: November 30, 2011.
d. Applicant: Parker Knoll Hydro,
LLC.
e. Name of Project: Parker Knoll
Pumped Storage Hydroelectric Project.
f. Location: At Parker Mountain, near
the Town of Richfield, Piute County,
Utah. The project would occupy 458.7
acres of federal land administered by
the U.S. Bureau of Land Management.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Justin Barker,
Parker Knoll Hydro, LLC., 975 South
State Highway, Logan, UT 84321; (435)
752–2580.
i. FERC Contact: Matt Buhyoff,
matt.buhyoff@ferc.gov, (202) 502–6824.
j. Deadline for filing scoping
comments: January 10, 2013.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
E:\FR\FM\16NON1.SGM
16NON1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 222 / Friday, November 16, 2012 / Notices
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
The Commission’s Rules of Practice
and Procedure require all interveners
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervener
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. This application is not ready for
environmental analysis at this time.
l. The proposed project would be a
closed-loop pumped storage system,
with an initial fill from the existing
Otter Creek reservoir. Parker Knoll
would include the following new
facilities: (1) An approximately 175-feethigh upper main dam with a crest
length of approximately 1,650 feet and
one saddle dam; (2) an upper reservoir
with a storage capacity of approximately
6,780 acre-feet and a surface area of
approximately 110 acres; (3) an
approximately 100-feet-high lower dam
with a crest length of approximately
1,750 feet and two saddle dams; (4) a
lower reservoir with storage capacity of
approximately 6,760 acre-feet and a
surface area of approximately 130 acres;
(5) a 2,390-feet-long and 27-feetdiameter headrace tunnel; (6) a 2,200feet-long and 27-feet-diameter vertical
shaft; (7) a 1,000-feet-long and 27-feetdiameter steel-lined penstock tunnel; (8)
a 7,126-feet-long and 35-feet-diameter
tailrace tunnel; (9) a powerhouse
containing four variable speed,
reversible pump-turbine units with a
minimum rating of 250 megawatt (MW);
(10) an approximately 585-feet by 340feet substation; (11) a 16-inch diameter
and 68,000-feet-long fill pipeline and
system; (12) approximately one mile of
345-kV transmission line; and (13)
appurtenant facilities. The project
would occupy 458.7 acres of federal
land and would have an estimated
annual generation of 2,630 gigawatt
hours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
VerDate Mar<15>2010
15:43 Nov 15, 2012
Jkt 229001
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Scoping Process: The Commission
intends to prepare an Environmental
Impact Statement (EIS) on the project in
accordance with the National
Environmental Policy Act. The EIS will
consider both site-specific and
cumulative environmental impacts and
reasonable alternatives to the proposed
action.
Scoping Meetings
FERC staff will conduct one agency
scoping meeting and one public
meeting. The agency scoping meeting
will focus on resource agency and nongovernmental organization (NGO)
concerns, while the public scoping
meeting is primarily for public input.
All interested individuals,
organizations, and agencies are invited
to attend one or both of the meetings,
and to assist the staff in identifying the
scope of the environmental issues that
should be analyzed in the EIS. The
times and locations of these meetings
are as follows:
Agency Scoping Meeting
Date: December 11, 2012.
Time: 10:00 a.m. (MST).
Place: Holiday Inn Express.
Address: 20 West 1400 North,
Richfield, Utah.
Public Scoping Meeting
Date: December 11, 2012.
Time: 6:00 p.m. (MST).
Place: Holiday Inn Express.
Address: 20 West 1400 North,
Richfield, Utah.
Copies of the Scoping Document
(SD1) outlining the subject areas to be
addressed in the EIS were distributed to
the parties on the Commission’s mailing
list. Copies of the SD1 will be available
at the scoping meeting or may be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link
(see item m above).
Objectives
At the scoping meetings, the staff will:
(1) Summarize the environmental issues
tentatively identified for analysis in the
EIS; (2) solicit from the meeting
participants all available information,
especially quantifiable data, on the
resources at issue; (3) encourage
statements from experts and the public
on issues that should be analyzed in the
EIS, including viewpoints in opposition
to, or in support of, the staff’s
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
68765
preliminary views; (4) determine the
resource issues to be addressed in the
EIS; and (5) identify those issues that
require a detailed analysis, as well as
those issues that do not require a
detailed analysis.
Procedures
The meetings are recorded by a court
reporter and become part of the formal
record of the Commission proceeding on
the project.
Individuals, organizations, and
agencies with environmental expertise
and concerns are encouraged to attend
the meeting and to assist the staff in
defining and clarifying the issues to be
addressed in the EIS.
Dated: November 9, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–27960 Filed 11–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13739–002]
Lock+ Hydro Friends Fund XLII, LLC;
Notice of Scoping Meetings and
Environmental Site Review and
Soliciting Scoping Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major Original
License.
b. Project No.: 13739–002.
c. Date filed: September 17, 2012.
d. Applicant: Lock+ Hydro Friends
Fund XLII, LLC.
e. Name of Project: Braddock Locks
and Dam Hydroelectric Project.
f. Location: At the existing U.S. Army
Corps of Engineers’ Braddock Locks and
Dam on the Monongahela River, in
Allegheny County, Pennsylvania. The
project would occupy about 0.19 acre of
federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Mark R.
Stover, Lock+TM Hydro Friends Fund
XLII, LLC, c/o Hydro Green Energy,
LLC, 900 Oakmont Lane, Suite 310,
Westmont, IL 60559; (877) 556–6566
ext. 711; email—mark@hgenergy.com.
i. FERC Contact: John Mudre at (202)
502–8902; or email at
john.mudre@ferc.gov.
j. Deadline for filing scoping
comments: January 4, 2013.
All documents may be filed
electronically via the Internet. See 18
E:\FR\FM\16NON1.SGM
16NON1
Agencies
[Federal Register Volume 77, Number 222 (Friday, November 16, 2012)]
[Notices]
[Pages 68764-68765]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-27960]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13239-002]
Parker Knoll Hydro, LLC; Notice of Intent To Prepare An
Environmental Impact Statement and Notice of Scoping Meetings and
Soliciting Scoping Comments
Take notice that the following hydroelectric applications have been
filed with Commission and are available for public inspection:
a. Type of Application: New Major License.
b. Project No.: 13239.
c. Date filed: November 30, 2011.
d. Applicant: Parker Knoll Hydro, LLC.
e. Name of Project: Parker Knoll Pumped Storage Hydroelectric
Project.
f. Location: At Parker Mountain, near the Town of Richfield, Piute
County, Utah. The project would occupy 458.7 acres of federal land
administered by the U.S. Bureau of Land Management.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Justin Barker, Parker Knoll Hydro, LLC., 975
South State Highway, Logan, UT 84321; (435) 752-2580.
i. FERC Contact: Matt Buhyoff, matt.buhyoff@ferc.gov, (202) 502-
6824.
j. Deadline for filing scoping comments: January 10, 2013.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an
[[Page 68765]]
original and seven copies to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application is not ready for environmental analysis at this
time.
l. The proposed project would be a closed-loop pumped storage
system, with an initial fill from the existing Otter Creek reservoir.
Parker Knoll would include the following new facilities: (1) An
approximately 175-feet-high upper main dam with a crest length of
approximately 1,650 feet and one saddle dam; (2) an upper reservoir
with a storage capacity of approximately 6,780 acre-feet and a surface
area of approximately 110 acres; (3) an approximately 100-feet-high
lower dam with a crest length of approximately 1,750 feet and two
saddle dams; (4) a lower reservoir with storage capacity of
approximately 6,760 acre-feet and a surface area of approximately 130
acres; (5) a 2,390-feet-long and 27-feet-diameter headrace tunnel; (6)
a 2,200-feet-long and 27-feet-diameter vertical shaft; (7) a 1,000-
feet-long and 27-feet-diameter steel-lined penstock tunnel; (8) a
7,126-feet-long and 35-feet-diameter tailrace tunnel; (9) a powerhouse
containing four variable speed, reversible pump-turbine units with a
minimum rating of 250 megawatt (MW); (10) an approximately 585-feet by
340-feet substation; (11) a 16-inch diameter and 68,000-feet-long fill
pipeline and system; (12) approximately one mile of 345-kV transmission
line; and (13) appurtenant facilities. The project would occupy 458.7
acres of federal land and would have an estimated annual generation of
2,630 gigawatt hours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Scoping Process: The Commission intends to prepare an
Environmental Impact Statement (EIS) on the project in accordance with
the National Environmental Policy Act. The EIS will consider both site-
specific and cumulative environmental impacts and reasonable
alternatives to the proposed action.
Scoping Meetings
FERC staff will conduct one agency scoping meeting and one public
meeting. The agency scoping meeting will focus on resource agency and
non-governmental organization (NGO) concerns, while the public scoping
meeting is primarily for public input. All interested individuals,
organizations, and agencies are invited to attend one or both of the
meetings, and to assist the staff in identifying the scope of the
environmental issues that should be analyzed in the EIS. The times and
locations of these meetings are as follows:
Agency Scoping Meeting
Date: December 11, 2012.
Time: 10:00 a.m. (MST).
Place: Holiday Inn Express.
Address: 20 West 1400 North, Richfield, Utah.
Public Scoping Meeting
Date: December 11, 2012.
Time: 6:00 p.m. (MST).
Place: Holiday Inn Express.
Address: 20 West 1400 North, Richfield, Utah.
Copies of the Scoping Document (SD1) outlining the subject areas to
be addressed in the EIS were distributed to the parties on the
Commission's mailing list. Copies of the SD1 will be available at the
scoping meeting or may be viewed on the web at https://www.ferc.gov
using the ``eLibrary'' link (see item m above).
Objectives
At the scoping meetings, the staff will: (1) Summarize the
environmental issues tentatively identified for analysis in the EIS;
(2) solicit from the meeting participants all available information,
especially quantifiable data, on the resources at issue; (3) encourage
statements from experts and the public on issues that should be
analyzed in the EIS, including viewpoints in opposition to, or in
support of, the staff's preliminary views; (4) determine the resource
issues to be addressed in the EIS; and (5) identify those issues that
require a detailed analysis, as well as those issues that do not
require a detailed analysis.
Procedures
The meetings are recorded by a court reporter and become part of
the formal record of the Commission proceeding on the project.
Individuals, organizations, and agencies with environmental
expertise and concerns are encouraged to attend the meeting and to
assist the staff in defining and clarifying the issues to be addressed
in the EIS.
Dated: November 9, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-27960 Filed 11-15-12; 8:45 am]