Federal Register / Vol. 77, No. 222 / Friday, November 16, 2012 / Notices
powerhouse located on the bank of the
Muskingum River opposite the existing
lock; (4) two turbine-generator units
providing a combined installed capacity
of 3 MW; (5) a 65-foot-long, 80-footwide draft tube section; (6) a 40-foot by
40-foot substation; (7) a 1,600-foot-long,
three-phase, overhead 69-kV
transmission line to connect the project
substation to the local utility
distribution lines; and (8) appurtenant
facilities. The average annual generation
would be about 15,957 MWh.
The proposed Rokeby Lock and Dam
Water Power Project would be located at
RM 57.4, and consist of the following
new facilities: (1) A 37-foot-long, 52foot-high, 80-foot-wide intake structure
with 2-inch clear bar spacing trash
racks; (2) a 160-foot by 75-foot
powerhouse located on the bank of the
Muskingum River opposite the existing
lock; (3) two turbine-generator units
providing a combined installed capacity
of 4 MW; (4) a 65-foot-long, 75-footwide draft tube section; (5) a 40-foot by
40-foot substation; (6) a 490-foot-long,
three-phase, overhead 69-kV
transmission line to connect the project
substation to the local utility
distribution lines; and (7) appurtenant
facilities. The average annual generation
would be about 17,182 MWh.
The proposed Zanesville Lock and
Dam Water Power Project would be
located at RM 77.4, and consist of the
following new facilities: (1) A 135-footlong, 16-foot-high, 30-foot-wide intake
structure with 2-inch clear bar spacing
trash racks; (2) two 10-foot diameter, 62foot-long buried steel penstocks; (3) a
45-foot by 37-foot powerhouse located
approximately 2,750 feet downstream of
the dam; (4) two turbine-generator units
providing a combined installed capacity
of 2 MW; (5) a 31-foot-long, 37-footwide draft tube; (6) a 40-foot by 40-foot
substation; (7) a 400-foot-long, threephase, overhead 69-kV transmission line
to connect the project substation to the
local utility distribution lines; and (8)
appurtenant facilities. The average
annual generation would be about
12,295 MWh.
The applicant proposes to operate all
seven projects in a run-of-river mode,
such that the water surface elevations
within each project impoundment
would be maintained at the crest of each
respective dam spillway.
o. A copy of the applications are
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
VerDate Mar<15>2010
15:43 Nov 15, 2012
Jkt 229001
Online Support. Copies are also
available for inspection and
reproduction at the address in item h
above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule: The
applications will be processed
according to the following preliminary
Hydro Licensing Schedule. Revisions to
the schedule will be made as
appropriate.
Issue Notice of Acceptance
Issue Scoping Document 1
for comments.
Comments on Scoping
Document 1.
Issue Scoping Document 2
Issue notice of ready for
environmental analysis.
Commission staff issues
EA.
Comments due on EA .......
January 2013.
February 2013.
April 2013.
April 2013.
July 2013.
January 2014.
February 2014.
Final amendments to the applications
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: November 9, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–27961 Filed 11–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1821–003.
Applicants: Goshen Phase II LLC.
Description: Notification of NonMaterial Change in Status of Goshen
Phase II LLC.
Filed Date: 11/7/12.
Accession Number: 20121107–5061.
Comments Due: 5 p.m. ET 11/28/12.
Docket Numbers: ER10–2331–012;
ER10–2343–012; ER10–2319–011;
ER10–2320–0011; ER10–2317–010;
ER10–2322–012; ER10–2324–011;
ER10–2325–010; ER10–2332–011;
ER10–2326–012; ER10–2327–013;
ER10–2328–011; ER11–4609–010;
ER10–2330–012.
Applicants: J.P. Morgan Ventures
Energy Corporation, J.P. Morgan
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
68759
Commodities Canada Corporation, BE
Alabama LLC, BE Allegheny LLC, BE
CA LLC, BE Ironwood LLC, BE KJ LLC,
BE Louisiana LLC, BE Rayle LLC, Cedar
Brakes I, L.L.C., Cedar Brakes II, L.L.C.,
Central Power & Lime LLC, Triton
Power Michigan LLC, Utility Contract
Funding, L.L.C.
Description: JPMorgan Sellers’ Notice
of Non-Material Change in Status re:
Minonk.
Filed Date: 11/7/12.
Accession Number: 20121107–5079.
Comments Due: 5 p.m. ET 11/28/12.
Docket Numbers: ER10–2460–001;
ER10–2461–001; ER12–682–002; ER10–
2463–001; ER11–2201–005; ER12–1311–
001; ER10–2466–002; ER11–4029–001.
Applicants: Evergreen Wind Power,
LLC, Canandaigua Power Partners, LLC,
Evergreen Wind Power V, LLC,
Evergreen Wind Power III, LLC, Stetson
Wind II, LLC, Vermont Wind, LLC,
Stetson Holdings, LLC, Erie Wind, LLC,
Canandaigua Power Partners II, LLC.
Description: Supplement to Notice of
Change in Status of Canandaigua Power
Partners LLC, et al.
Filed Date: 10/15/12.
Accession Number: 20121015–5168.
Comments Due: 5 p.m. ET 11/19/12.
Docket Numbers: ER10–2460–003;
ER10–2461–003; ER12–682–004; ER10–
2463–003; ER11–2201–007; ER12–1311–
003; ER10–2466–004; ER11–4029–003.
Applicants: Canandaigua Power
Partners, LLC, Canandaigua Power
Partners II, LLC, Erie Wind, LLC,
Evergreen Wind Power, LLC, Evergreen
Wind Power III, LLC, Stetson Holdings,
LLC, Stetson Wind II, LLC, Vermont
Wind, LLC.
Description: Notice of Change in
Status of Canandaigua Power Partners,
LLC, et al.
Filed Date: 11/7/12.
Accession Number: 20121107–5082.
Comments Due: 5 p.m. ET 11/28/12.
Docket Numbers: ER12–162–005;
ER11–3876–007; ER11–2044–008;
ER10–2611–005.
Applicants: Bishop Hill Energy II
LLC, Cordova Energy Company LLC,
MidAmerican Energy Company, Saranac
Power Partners, L.P.
Description: Notice of Change in
Status of Bishop Hill Energy II LLC, et
al.
Filed Date: 11/7/12.
Accession Number: 20121107–5081.
Comments Due: 5 p.m. ET 11/28/12.
Docket Numbers: ER12–2145–002;
ER10–2834–002; ER11–2905–001;
ER11–2904–001; ER10–2821–002.
Applicants: Munnsville Wind Farm,
LLC, Pioneer Trail Wind Farm, LLC,
Settlers Trail Wind Farm, LLC, Stony
Creek Wind Farm, LLC, EC&R O&M,
LLC.
E:\FR\FM\16NON1.SGM
16NON1
68760
Federal Register / Vol. 77, No. 222 / Friday, November 16, 2012 / Notices
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Description: EC&R O&M, LLC, et al.
submits Notice of Change in Status.
Filed Date: 11/6/12.
Accession Number: 20121106–5171.
Comments Due: 5 p.m. ET 11/27/12.
DEPARTMENT OF ENERGY
Docket Numbers: ER13–321–001.
Applicants: Fairless Energy, LLC.
Description: Fairless Energy, LLC
submits tariff filing per 35: Amended
Baseline Single Market-Based Rate
Tariff to be effective 11/8/2012.
Filed Date: 11/7/12.
Accession Number: 20121107–5044.
Comments Due: 5 p.m. ET 11/28/12.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: ER13–336–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Original Service
Agreement No. 3416; Queue No. X2–085
to be effective 10/24/2012.
Filed Date: 11/7/12.
Accession Number: 20121107–5033.
Comments Due: 5 p.m. ET 11/28/12.
mstockstill on DSK4VPTVN1PROD with NOTICES
Docket Numbers: ER13–337–000.
Applicants: Florida Power
Corporation.
Description: Florida Power
Corporation submits Notice of
Cancellation of Rate Schedule No. 207,
Power Sales Agreement with Gainesville
Regional Utilities.
Filed Date: 11/7/12.
Accession Number: 20121107–5076.
Comments Due: 5 p.m. ET 11/28/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR § 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 7, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–27893 Filed 11–15–12; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
15:43 Nov 15, 2012
Jkt 229001
Federal Energy Regulatory
Commission
Combined Notice of Filings
Dated: November 6, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–27891 Filed 11–15–12; 8:45 am]
BILLING CODE 6717–01–P
Filings Instituting Proceedings
Docket Numbers: RP13–260–000.
Applicants: High Point Gas
Transmission, LLC.
Description: High Point Gas
Transmission, LLC submits tariff filing
per 154.203: NAESB Compliance Filing
to be effective 12/1/2012.
Filed Date: 11/5/12.
Accession Number: 20121105–5104.
Comments Due: 5 p.m. ET 11/19/12.
Docket Numbers: RP13–261–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: Algonquin Gas
Transmission, LLC submits tariff filing
per 154.204: Con Ed Releases November
2012 Ramapo to be effective 11/3/2012.
Filed Date: 11/5/12.
Accession Number: 20121105–5106.
Comments Due: 5 p.m. ET 11/19/12.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR § 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP13–172–001.
Applicants: Questar Southern Trails
Pipeline Company.
Description: Questar Southern Trails
Pipeline Company submits tariff filing
per 154.205(b): Section 35,
Segmentation of Capacity, Amended to
be effective 12/1/2012.
Filed Date: 11/5/12.
Accession Number: 20121105–5128.
Comments Due: 5 p.m. ET 11/19/12.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
§ 385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP13–262–000.
Applicants: Rockies Express Pipeline
LLC.
Description: NAESB 2.0 Compliance
to be effective 12/1/2012.
Filed Date: 11/7/12.
Accession Number: 20121107–5051.
Comments Due: 5 p.m. ET 11/19/12.
Docket Numbers: RP13–263–000.
Applicants: Questar Southern Trails
Pipeline Company.
Description: Order 587–V revised
section 28 to be effective 12/1/2012.
Filed Date: 11/7/12.
Accession Number: 20121107–5084.
Comments Due: 5 p.m. ET 11/19/12.
Docket Numbers: RP13–265–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Revise Destin Fuel Rate
Reference filing to be effective 12/1/
2012.
Filed Date: 11/8/12.
Accession Number: 20121108–5019.
Comments Due: 5 p.m. ET 11/20/12.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP13–102–002.
Applicants: Northwest Pipeline GP.
Description: NWP NAESB 2.0
Compliance Filing—Second Substitute
Sheet to be effective 12/1/2012.
Filed Date: 11/6/12.
Accession Number: 20121106–5132.
Comments Due: 5 p.m. ET 11/14/12.
Docket Numbers: RP13–169–001.
E:\FR\FM\16NON1.SGM
16NON1
Agencies
[Federal Register Volume 77, Number 222 (Friday, November 16, 2012)]
[Notices]
[Pages 68759-68760]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-27893]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1821-003.
Applicants: Goshen Phase II LLC.
Description: Notification of Non-Material Change in Status of
Goshen Phase II LLC.
Filed Date: 11/7/12.
Accession Number: 20121107-5061.
Comments Due: 5 p.m. ET 11/28/12.
Docket Numbers: ER10-2331-012; ER10-2343-012; ER10-2319-011; ER10-
2320-0011; ER10-2317-010; ER10-2322-012; ER10-2324-011; ER10-2325-010;
ER10-2332-011; ER10-2326-012; ER10-2327-013; ER10-2328-011; ER11-4609-
010; ER10-2330-012.
Applicants: J.P. Morgan Ventures Energy Corporation, J.P. Morgan
Commodities Canada Corporation, BE Alabama LLC, BE Allegheny LLC, BE CA
LLC, BE Ironwood LLC, BE KJ LLC, BE Louisiana LLC, BE Rayle LLC, Cedar
Brakes I, L.L.C., Cedar Brakes II, L.L.C., Central Power & Lime LLC,
Triton Power Michigan LLC, Utility Contract Funding, L.L.C.
Description: JPMorgan Sellers' Notice of Non-Material Change in
Status re: Minonk.
Filed Date: 11/7/12.
Accession Number: 20121107-5079.
Comments Due: 5 p.m. ET 11/28/12.
Docket Numbers: ER10-2460-001; ER10-2461-001; ER12-682-002; ER10-
2463-001; ER11-2201-005; ER12-1311-001; ER10-2466-002; ER11-4029-001.
Applicants: Evergreen Wind Power, LLC, Canandaigua Power Partners,
LLC, Evergreen Wind Power V, LLC, Evergreen Wind Power III, LLC,
Stetson Wind II, LLC, Vermont Wind, LLC, Stetson Holdings, LLC, Erie
Wind, LLC, Canandaigua Power Partners II, LLC.
Description: Supplement to Notice of Change in Status of
Canandaigua Power Partners LLC, et al.
Filed Date: 10/15/12.
Accession Number: 20121015-5168.
Comments Due: 5 p.m. ET 11/19/12.
Docket Numbers: ER10-2460-003; ER10-2461-003; ER12-682-004; ER10-
2463-003; ER11-2201-007; ER12-1311-003; ER10-2466-004; ER11-4029-003.
Applicants: Canandaigua Power Partners, LLC, Canandaigua Power
Partners II, LLC, Erie Wind, LLC, Evergreen Wind Power, LLC, Evergreen
Wind Power III, LLC, Stetson Holdings, LLC, Stetson Wind II, LLC,
Vermont Wind, LLC.
Description: Notice of Change in Status of Canandaigua Power
Partners, LLC, et al.
Filed Date: 11/7/12.
Accession Number: 20121107-5082.
Comments Due: 5 p.m. ET 11/28/12.
Docket Numbers: ER12-162-005; ER11-3876-007; ER11-2044-008; ER10-
2611-005.
Applicants: Bishop Hill Energy II LLC, Cordova Energy Company LLC,
MidAmerican Energy Company, Saranac Power Partners, L.P.
Description: Notice of Change in Status of Bishop Hill Energy II
LLC, et al.
Filed Date: 11/7/12.
Accession Number: 20121107-5081.
Comments Due: 5 p.m. ET 11/28/12.
Docket Numbers: ER12-2145-002; ER10-2834-002; ER11-2905-001; ER11-
2904-001; ER10-2821-002.
Applicants: Munnsville Wind Farm, LLC, Pioneer Trail Wind Farm,
LLC, Settlers Trail Wind Farm, LLC, Stony Creek Wind Farm, LLC, EC&R
O&M, LLC.
[[Page 68760]]
Description: EC&R O&M, LLC, et al. submits Notice of Change in
Status.
Filed Date: 11/6/12.
Accession Number: 20121106-5171.
Comments Due: 5 p.m. ET 11/27/12.
Docket Numbers: ER13-321-001.
Applicants: Fairless Energy, LLC.
Description: Fairless Energy, LLC submits tariff filing per 35:
Amended Baseline Single Market-Based Rate Tariff to be effective 11/8/
2012.
Filed Date: 11/7/12.
Accession Number: 20121107-5044.
Comments Due: 5 p.m. ET 11/28/12.
Docket Numbers: ER13-336-000.
Applicants: PJM Interconnection, L.L.C.
Description: Original Service Agreement No. 3416; Queue No. X2-085
to be effective 10/24/2012.
Filed Date: 11/7/12.
Accession Number: 20121107-5033.
Comments Due: 5 p.m. ET 11/28/12.
Docket Numbers: ER13-337-000.
Applicants: Florida Power Corporation.
Description: Florida Power Corporation submits Notice of
Cancellation of Rate Schedule No. 207, Power Sales Agreement with
Gainesville Regional Utilities.
Filed Date: 11/7/12.
Accession Number: 20121107-5076.
Comments Due: 5 p.m. ET 11/28/12.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR Sec. 385.211 and Sec. 385.214) on or
before 5:00 p.m. Eastern time on the specified comment date. Protests
may be considered, but intervention is necessary to become a party to
the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: November 7, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-27893 Filed 11-15-12; 8:45 am]