Water Wheel Ranch; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions, 68116 [2012-27731]
Download as PDF
68116
Federal Register / Vol. 77, No. 221 / Thursday, November 15, 2012 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6952–008]
TKELLEY on DSK3SPTVN1PROD with NOTICES
Water Wheel Ranch; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, Protests,
Recommendations, and Terms and
Conditions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Amendment
of Exemption.
b. Project No.: 6952–008.
c. Date filed: December 12, 2011, and
supplemented on October 8, 2012.
d. Applicant: Water Wheel Ranch.
e. Name of Project: Water Wheel
Ranch Hydroelectric Project.
f. Location: The Water Wheel Ranch
Hydroelectric Project would be located
on the North Fork Little Cow Creek in
Shasta County, California. The land on
which all the project structures are
located is owned by the applicant.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a—825r.
h. Applicant Contact: Mr. Finley
McMillan, P.O. Box 130, Round
Mountain, CA 96084. Phone (530) 337–
6581.
i. FERC Contact: Robert Bell, (202)
502–6062, robert.bell@ferc.gov.
j. Status of Environmental Analysis:
This application is ready for
environmental analysis at this time, and
the Commission is requesting
comments, reply comments,
recommendations, terms and
conditions, and prescriptions.
k. Deadline for filing responsive
documents: All comments, motions to
intervene, protests, recommendations,
terms and conditions, and prescriptions
due within 30 days from the issuance
date of this notice. All reply comments
filed in response to comments
submitted by any resource agency,
Indian tribe, or person, must be filed
with the Commission within 15 days
from the issuance date of this notice.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s web
site at https://www.ferc.gov/docs-filing/
efiling.asp. The Commission strongly
encourages electronic filings.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
VerDate Mar<15>2010
16:22 Nov 14, 2012
Jkt 229001
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
l. Description of the project: The
amended Water Wheel Ranch
Hydroelectric Project would consist of:
(1) Relocating powerhouse No. 2, which
was destroyed by a forest fire, 850 feet
closer to the dam, up the existing
penstock, (2) installing a new 100-footlong tailrace which would discharge
into Cedar Creek, 1,400 feet upstream of
the current discharge location and (3)
appurtenant facilities. The applicant
states there would be no change in
project capacity.
m. This filing is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the web at https://www.ferc.gov/docsfiling/elibrary.asp using the ‘‘eLibrary’’
link. Enter the docket number, P–6952,
in the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for review and reproduction at
the address in item h above.
n. Protests or Motions to Intervene—
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
q. All filings must (1) bear in all
capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’,
‘‘COMMENTS’’, ‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading, the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Any of these documents
must be filed by providing the original
and seven copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. An additional copy must be sent
to Director, Division of Hydropower
Administration and Compliance, Office
of Energy Projects, Federal Energy
Regulatory Commission, at the above
address. A copy of any protest or motion
to intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: November 8, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–27731 Filed 11–14–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR13–5–000]
TEAK Texana Transmission Company,
LP; Notice of Petition for Rate
Approval
Take notice that on November 2,
2012, TEAK Texana Transmission
Company, LP (TEAK) filed a Petition for
Rate Approval pursuant to 284.123(b)(2)
of the Commissions regulations for firm
and interruptible natural gas
transportation services, as more fully
detailed in the petition.
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
E:\FR\FM\15NON1.SGM
15NON1
Agencies
[Federal Register Volume 77, Number 221 (Thursday, November 15, 2012)]
[Notices]
[Page 68116]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-27731]
[[Page 68116]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6952-008]
Water Wheel Ranch; Notice of Application Accepted for Filing and
Soliciting Comments, Motions To Intervene, Protests, Recommendations,
and Terms and Conditions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Amendment of Exemption.
b. Project No.: 6952-008.
c. Date filed: December 12, 2011, and supplemented on October 8,
2012.
d. Applicant: Water Wheel Ranch.
e. Name of Project: Water Wheel Ranch Hydroelectric Project.
f. Location: The Water Wheel Ranch Hydroelectric Project would be
located on the North Fork Little Cow Creek in Shasta County,
California. The land on which all the project structures are located is
owned by the applicant.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a--825r.
h. Applicant Contact: Mr. Finley McMillan, P.O. Box 130, Round
Mountain, CA 96084. Phone (530) 337-6581.
i. FERC Contact: Robert Bell, (202) 502-6062, robert.bell@ferc.gov.
j. Status of Environmental Analysis: This application is ready for
environmental analysis at this time, and the Commission is requesting
comments, reply comments, recommendations, terms and conditions, and
prescriptions.
k. Deadline for filing responsive documents: All comments, motions
to intervene, protests, recommendations, terms and conditions, and
prescriptions due within 30 days from the issuance date of this notice.
All reply comments filed in response to comments submitted by any
resource agency, Indian tribe, or person, must be filed with the
Commission within 15 days from the issuance date of this notice.
Comments, protests, and interventions may be filed electronically
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's web site at https://www.ferc.gov/docs-filing/efiling.asp. The Commission strongly encourages electronic
filings.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
l. Description of the project: The amended Water Wheel Ranch
Hydroelectric Project would consist of: (1) Relocating powerhouse No.
2, which was destroyed by a forest fire, 850 feet closer to the dam, up
the existing penstock, (2) installing a new 100-foot-long tailrace
which would discharge into Cedar Creek, 1,400 feet upstream of the
current discharge location and (3) appurtenant facilities. The
applicant states there would be no change in project capacity.
m. This filing is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may also be viewed on the web at
https://www.ferc.gov/docs-filing/elibrary.asp using the ``eLibrary''
link. Enter the docket number, P-6952, in the docket number field to
access the document. For assistance, call toll-free 1-866-208-3676 or
email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy
is also available for review and reproduction at the address in item h
above.
n. Protests or Motions to Intervene--Anyone may submit a protest or
a motion to intervene in accordance with the requirements of Rules of
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In
determining the appropriate action to take, the Commission will
consider all protests filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any protests or motions to intervene must be
received on or before the specified deadline date for the particular
application.
q. All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS'', ``REPLY COMMENTS,''
``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;''
(2) set forth in the heading, the name of the applicant and the project
number of the application to which the filing responds; (3) furnish the
name, address, and telephone number of the person protesting or
intervening; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All comments, recommendations, terms and
conditions or prescriptions must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may
obtain copies of the application directly from the applicant. Any of
these documents must be filed by providing the original and seven
copies to: The Secretary, Federal Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426. An additional copy must be sent
to Director, Division of Hydropower Administration and Compliance,
Office of Energy Projects, Federal Energy Regulatory Commission, at the
above address. A copy of any protest or motion to intervene must be
served upon each representative of the applicant specified in the
particular application. A copy of all other filings in reference to
this application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Dated: November 8, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-27731 Filed 11-14-12; 8:45 am]
BILLING CODE 6717-01-P