Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Digital I&C; Notice of Meeting, 67688 [2012-27534]
Download as PDF
67688
Federal Register / Vol. 77, No. 219 / Tuesday, November 13, 2012 / Notices
srobinson on DSK4SPTVN1PROD with
Effective date: As of the date of
issuance and shall be implemented
within 30 days of issuance.
Amendment No.: Unit 3–2, and Unit
4–2.
Facility Combined Licenses No. NPF–
91 and NPF–92: Amendment revised the
Facility Combined Licenses.
Date of initial notice in Federal
Register: June 12, 2012 (77 FR 35076).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated October 25,
2012.
No significant hazards consideration
comments received: No.
For the Nuclear Regulatory Commission.
Michele G. Evans,
Director, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
Tennessee Valley Authority, Docket
Nos. 50–327 and 50–328, Sequoyah
Nuclear Plant, Units 1 and 2, Hamilton
County, Tennessee
Date of application for amendment:
May 23, 2012, supplemented by letter
dated August 23, 2012 (TS–SQN–12–
01).
Brief description of amendment: The
amendments revised Technical
Specification (TS) 3/4.8.1 to include a
surveillance requirement to demonstrate
the required offsite circuits OPERABLE
at least once per 18 months by manually
and automatically transferring the
power supply to a 6.9 KiloVolt unit
board from the normal supply to the
alternate supply. This change is
necessary as a result of the planned
modifications to the plant design and
operating configuration that will allow
use of the unit station service
transformers as a power supply to an
offsite circuit.
Date of issuance: October 31, 2012.
Effective date: As of the date of
issuance and shall be implemented
prior to startup from Unit 2 fall 2012
refueling outage.
Amendment Nos.: Unit 1–332 and
Unit 2–325.
Facility Operating License Nos. DPR–
77 and DPR–79: Amendments revised
the License and TSs.
Date of initial notice in Federal
Register: July 24, 2012 (76 FR 43379).
The supplement letter dated August 23,
2012, provided additional information
that clarified the application, did not
expand the scope of the application as
originally noticed, and did not change
the staff’s original proposed no
significant hazards consideration
determination.
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated October 31,
2012.
No significant hazards consideration
comments received: No.
The ACRS Subcommittee on Digital
I&C will hold a meeting on November
16, 2012, Room T–2B1, 11545 Rockville
Pike, Rockville, Maryland.
The entire meeting will be open to
public attendance.
The agenda for the subject meeting
shall be as follows:
Dated at Rockville, Maryland, this 1st day
of November 2012.
VerDate Mar<15>2010
17:08 Nov 09, 2012
Jkt 229001
[FR Doc. 2012–27384 Filed 11–9–12; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards (ACRS); Meeting of the
ACRS Subcommittee on Digital I&C;
Notice of Meeting
Friday, November 16, 2012—8:30 a.m.
until 5:00 p.m.
The Subcommittee will review and
discuss the Design Specific Review
Standard (DSRS) for Instrumentation
and Control of the Babcock & Wilcox
(B&W) mPower reactor. The
Subcommittee will hear presentations
by and hold discussions with the NRC
staff and other interested persons
regarding this matter. The
Subcommittee will gather information,
analyze relevant issues and facts, and
formulate proposed positions and
actions, as appropriate, for deliberation
by the Full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official (DFO), Christina
Antonescu (Telephone 301–415–6792 or
Email: Christina.Antonescu@nrc.gov)
five days prior to the meeting, if
possible, so that appropriate
arrangements can be made. Thirty-five
hard copies of each presentation or
handout should be provided to the DFO
thirty minutes before the meeting. In
addition, one electronic copy of each
presentation should be emailed to the
DFO one day before the meeting. If an
electronic copy cannot be provided
within this timeframe, presenters
should provide the DFO with a CD
containing each presentation at least
thirty minutes before the meeting.
Electronic recordings will be permitted
only during those portions of the
meeting that are open to the public.
Detailed procedures for the conduct of
and participation in ACRS meetings
were published in the Federal Register
on October 18, 2012, (77 FR 64146–
64147).
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
Detailed meeting agendas and meeting
transcripts are available on the NRC
Web site at https://www.nrc.gov/readingrm/doc-collections/acrs. Information
regarding topics to be discussed,
changes to the agenda, whether the
meeting has been canceled or
rescheduled, and the time allotted to
present oral statements can be obtained
from the Web site cited above or by
contacting the identified DFO.
Moreover, in view of the possibility that
the schedule for ACRS meetings may be
adjusted by the Chairman as necessary
to facilitate the conduct of the meeting,
persons planning to attend should check
with these references if such
rescheduling would result in a major
inconvenience.
If attending this meeting, please enter
through the One White Flint North
building, 11555 Rockville Pike,
Rockville, MD. After registering with
security, please contact Mr. Theron
Brown (Telephone 240–888–9835) to be
escorted to the meeting room.
Dated: November 6, 2012.
Antonio Dias,
Technical Advisor, Advisory Committee on
Reactor Safeguards.
[FR Doc. 2012–27534 Filed 11–9–12; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards (ACRS), Meeting of the
ACRS Subcommittee on Reliability and
PRA; Notice of Meeting
The ACRS Subcommittee on
Reliability and PRA will hold a meeting
on December 4, 2012, Room T–2B1,
11545 Rockville Pike, Rockville,
Maryland.
The entire meeting will be open to
public attendance.
The agenda for the subject meeting
shall be as follows:
Tuesday, December 4, 2012—1:00 p.m.
Until 5:00 p.m.
The Subcommittee will be briefed on
the progress of the Level 3 Probabilistic
Risk Assessment (PRA) development
plan. The Subcommittee will hear
presentations by and hold discussions
with the NRC staff and other interested
persons regarding this matter. The
Subcommittee will gather information,
analyze relevant issues and facts, and
formulate proposed positions and
actions, as appropriate, for deliberation
by the Full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
E:\FR\FM\13NON1.SGM
13NON1
Agencies
[Federal Register Volume 77, Number 219 (Tuesday, November 13, 2012)]
[Notices]
[Page 67688]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-27534]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the
ACRS Subcommittee on Digital I&C; Notice of Meeting
The ACRS Subcommittee on Digital I&C will hold a meeting on
November 16, 2012, Room T-2B1, 11545 Rockville Pike, Rockville,
Maryland.
The entire meeting will be open to public attendance.
The agenda for the subject meeting shall be as follows:
Friday, November 16, 2012--8:30 a.m. until 5:00 p.m.
The Subcommittee will review and discuss the Design Specific Review
Standard (DSRS) for Instrumentation and Control of the Babcock & Wilcox
(B&W) mPower reactor. The Subcommittee will hear presentations by and
hold discussions with the NRC staff and other interested persons
regarding this matter. The Subcommittee will gather information,
analyze relevant issues and facts, and formulate proposed positions and
actions, as appropriate, for deliberation by the Full Committee.
Members of the public desiring to provide oral statements and/or
written comments should notify the Designated Federal Official (DFO),
Christina Antonescu (Telephone 301-415-6792 or Email:
Christina.Antonescu@nrc.gov) five days prior to the meeting, if
possible, so that appropriate arrangements can be made. Thirty-five
hard copies of each presentation or handout should be provided to the
DFO thirty minutes before the meeting. In addition, one electronic copy
of each presentation should be emailed to the DFO one day before the
meeting. If an electronic copy cannot be provided within this
timeframe, presenters should provide the DFO with a CD containing each
presentation at least thirty minutes before the meeting. Electronic
recordings will be permitted only during those portions of the meeting
that are open to the public. Detailed procedures for the conduct of and
participation in ACRS meetings were published in the Federal Register
on October 18, 2012, (77 FR 64146-64147).
Detailed meeting agendas and meeting transcripts are available on
the NRC Web site at https://www.nrc.gov/reading-rm/doc-collections/acrs.
Information regarding topics to be discussed, changes to the agenda,
whether the meeting has been canceled or rescheduled, and the time
allotted to present oral statements can be obtained from the Web site
cited above or by contacting the identified DFO. Moreover, in view of
the possibility that the schedule for ACRS meetings may be adjusted by
the Chairman as necessary to facilitate the conduct of the meeting,
persons planning to attend should check with these references if such
rescheduling would result in a major inconvenience.
If attending this meeting, please enter through the One White Flint
North building, 11555 Rockville Pike, Rockville, MD. After registering
with security, please contact Mr. Theron Brown (Telephone 240-888-9835)
to be escorted to the meeting room.
Dated: November 6, 2012.
Antonio Dias,
Technical Advisor, Advisory Committee on Reactor Safeguards.
[FR Doc. 2012-27534 Filed 11-9-12; 8:45 am]
BILLING CODE 7590-01-P