Advisory Committee on Reactor Safeguards (ACRS), Meeting of the ACRS Subcommittee on Reliability and PRA; Notice of Meeting, 67688-67689 [2012-27520]

Download as PDF 67688 Federal Register / Vol. 77, No. 219 / Tuesday, November 13, 2012 / Notices srobinson on DSK4SPTVN1PROD with Effective date: As of the date of issuance and shall be implemented within 30 days of issuance. Amendment No.: Unit 3–2, and Unit 4–2. Facility Combined Licenses No. NPF– 91 and NPF–92: Amendment revised the Facility Combined Licenses. Date of initial notice in Federal Register: June 12, 2012 (77 FR 35076). The Commission’s related evaluation of the amendment is contained in a Safety Evaluation dated October 25, 2012. No significant hazards consideration comments received: No. For the Nuclear Regulatory Commission. Michele G. Evans, Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. Tennessee Valley Authority, Docket Nos. 50–327 and 50–328, Sequoyah Nuclear Plant, Units 1 and 2, Hamilton County, Tennessee Date of application for amendment: May 23, 2012, supplemented by letter dated August 23, 2012 (TS–SQN–12– 01). Brief description of amendment: The amendments revised Technical Specification (TS) 3/4.8.1 to include a surveillance requirement to demonstrate the required offsite circuits OPERABLE at least once per 18 months by manually and automatically transferring the power supply to a 6.9 KiloVolt unit board from the normal supply to the alternate supply. This change is necessary as a result of the planned modifications to the plant design and operating configuration that will allow use of the unit station service transformers as a power supply to an offsite circuit. Date of issuance: October 31, 2012. Effective date: As of the date of issuance and shall be implemented prior to startup from Unit 2 fall 2012 refueling outage. Amendment Nos.: Unit 1–332 and Unit 2–325. Facility Operating License Nos. DPR– 77 and DPR–79: Amendments revised the License and TSs. Date of initial notice in Federal Register: July 24, 2012 (76 FR 43379). The supplement letter dated August 23, 2012, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff’s original proposed no significant hazards consideration determination. The Commission’s related evaluation of the amendment is contained in a Safety Evaluation dated October 31, 2012. No significant hazards consideration comments received: No. The ACRS Subcommittee on Digital I&C will hold a meeting on November 16, 2012, Room T–2B1, 11545 Rockville Pike, Rockville, Maryland. The entire meeting will be open to public attendance. The agenda for the subject meeting shall be as follows: Dated at Rockville, Maryland, this 1st day of November 2012. VerDate Mar<15>2010 17:08 Nov 09, 2012 Jkt 229001 [FR Doc. 2012–27384 Filed 11–9–12; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Digital I&C; Notice of Meeting Friday, November 16, 2012—8:30 a.m. until 5:00 p.m. The Subcommittee will review and discuss the Design Specific Review Standard (DSRS) for Instrumentation and Control of the Babcock & Wilcox (B&W) mPower reactor. The Subcommittee will hear presentations by and hold discussions with the NRC staff and other interested persons regarding this matter. The Subcommittee will gather information, analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the Full Committee. Members of the public desiring to provide oral statements and/or written comments should notify the Designated Federal Official (DFO), Christina Antonescu (Telephone 301–415–6792 or Email: Christina.Antonescu@nrc.gov) five days prior to the meeting, if possible, so that appropriate arrangements can be made. Thirty-five hard copies of each presentation or handout should be provided to the DFO thirty minutes before the meeting. In addition, one electronic copy of each presentation should be emailed to the DFO one day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the DFO with a CD containing each presentation at least thirty minutes before the meeting. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. Detailed procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on October 18, 2012, (77 FR 64146– 64147). PO 00000 Frm 00062 Fmt 4703 Sfmt 4703 Detailed meeting agendas and meeting transcripts are available on the NRC Web site at https://www.nrc.gov/readingrm/doc-collections/acrs. Information regarding topics to be discussed, changes to the agenda, whether the meeting has been canceled or rescheduled, and the time allotted to present oral statements can be obtained from the Web site cited above or by contacting the identified DFO. Moreover, in view of the possibility that the schedule for ACRS meetings may be adjusted by the Chairman as necessary to facilitate the conduct of the meeting, persons planning to attend should check with these references if such rescheduling would result in a major inconvenience. If attending this meeting, please enter through the One White Flint North building, 11555 Rockville Pike, Rockville, MD. After registering with security, please contact Mr. Theron Brown (Telephone 240–888–9835) to be escorted to the meeting room. Dated: November 6, 2012. Antonio Dias, Technical Advisor, Advisory Committee on Reactor Safeguards. [FR Doc. 2012–27534 Filed 11–9–12; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS), Meeting of the ACRS Subcommittee on Reliability and PRA; Notice of Meeting The ACRS Subcommittee on Reliability and PRA will hold a meeting on December 4, 2012, Room T–2B1, 11545 Rockville Pike, Rockville, Maryland. The entire meeting will be open to public attendance. The agenda for the subject meeting shall be as follows: Tuesday, December 4, 2012—1:00 p.m. Until 5:00 p.m. The Subcommittee will be briefed on the progress of the Level 3 Probabilistic Risk Assessment (PRA) development plan. The Subcommittee will hear presentations by and hold discussions with the NRC staff and other interested persons regarding this matter. The Subcommittee will gather information, analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the Full Committee. Members of the public desiring to provide oral statements and/or written comments should notify the Designated E:\FR\FM\13NON1.SGM 13NON1 Federal Register / Vol. 77, No. 219 / Tuesday, November 13, 2012 / Notices Federal Official (DFO), John Lai (Telephone 301–415–5197 or Email: John.Lai@nrc.gov) five days prior to the meeting, if possible, so that appropriate arrangements can be made. Thirty-five hard copies of each presentation or handout should be provided to the DFO thirty minutes before the meeting. In addition, one electronic copy of each presentation should be emailed to the DFO one day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the DFO with a CD containing each presentation at least thirty minutes before the meeting. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. Detailed procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on October 18, 2012, (77 FR 64146– 64147). Detailed meeting agendas and meeting transcripts are available on the NRC Web site at https://www.nrc.gov/readingrm/doc-collections/acrs. Information regarding topics to be discussed, changes to the agenda, whether the meeting has been canceled or rescheduled, and the time allotted to present oral statements can be obtained from the Web site cited above or by contacting the identified DFO. Moreover, in view of the possibility that the schedule for ACRS meetings may be adjusted by the Chairman as necessary to facilitate the conduct of the meeting, persons planning to attend should check with these references if such rescheduling would result in a major inconvenience. If attending this meeting, please enter through the One White Flint North building, 11555 Rockville Pike, Rockville, MD. After registering with security, please contact Mr. Theron Brown (Telephone 240–888–9835) to be escorted to the meeting room. Dates: November 6, 2012. Antonio Dias, Technical Advisor, Advisory Committee on Reactor Safeguards. [FR Doc. 2012–27520 Filed 11–9–12; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION srobinson on DSK4SPTVN1PROD with [NRC–2012–0002] Sunshine Federal Register Notice AGENCY HOLDING THE MEETINGS: Nuclear Regulatory Commission. DATE: Week of November 5, 2012. VerDate Mar<15>2010 17:08 Nov 09, 2012 Jkt 229001 Commissioners’ Conference Room, 11555 Rockville Pike, Rockville, Maryland. STATUS: Public and Closed. ADDITIONAL ITEMS TO BE CONSIDERED: PLACE: 67689 or send an email to darlene.wright@nrc.gov. Dated: November 7, 2012. Rochelle C. Bavol, Policy Coordinator, Office of the Secretary. [FR Doc. 2012–27624 Filed 11–8–12; 11:15 am] Week of November 5, 2012 BILLING CODE 7590–01–P Thursday, November 8, 2012 9:00 a.m. Affirmation Session (Public Meeting) (Tentative). Southern California Edison Co. (San Onofre Nuclear Generating Station), Docket Nos. 50–361 and 50–362– CAL, Petition to Intervene, Request for Hearing, and Stay Application (June 18, 2012) (Tentative). This meeting will be webcast live at the Web address—www.nrc.gov. * * * * * * The schedule for Commission meetings is subject to change on short notice. To verify the status of meetings, call (recording)—(301) 415–1292. Contact person for more information: Rochelle Bavol, (301) 415–1651. * * * * * Additional Information The Affirmation session, Southern California Edison Co. (San Onofre Nuclear Generating Station), Docket Nos. 50–361 and 50–362–CAL, Petition to Intervene, Request for Hearing, and Stay Application (June 18, 2012), previously scheduled on October 30, 2012, was postponed, and has been rescheduled on November 8, 2012. * * * * * The NRC Commission Meeting Schedule can be found on the Internet at: www.nrc.gov/about-nrc/policymaking/schedule.html. * * * * * The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in these public meetings, or need this meeting notice or the transcript or other information from the public meetings in another format (e.g. braille, large print), please notify Bill Dosch, Chief, Work Life and Benefits Branch, at 301–415–6200, TDD: 301– 415–2100, or by email at william.dosch@nrc.gov. Determinations on requests for reasonable accommodation will be made on a caseby-case basis. * * * * * This notice is distributed electronically to subscribers. If you no longer wish to receive it, or would like to be added to the distribution, please contact the Office of the Secretary, Washington, DC 20555 (301–415–1969), PO 00000 Frm 00063 Fmt 4703 Sfmt 4703 SECURITIES AND EXCHANGE COMMISSION [Investment Company Act Release No. 30258; File No. 812–13731] Fidelity Aberdeen Street Trust, et al.; Notice of Application November 6, 2012. Securities and Exchange Commission (‘‘Commission’’). ACTION: Notice of an application to amend a prior order under (a) section 6(c) of the Investment Company Act of 1940 (‘‘Act’’) granting an exemption from sections 18(f) and 21(b) of the Act; (b) section 12(d)(1)(J) of the Act granting an exemption from section 12(d)(1) of the Act; (c) sections 6(c) and 17(b) of the Act granting an exemption from sections 17(a)(1) and 17(a)(3) of the Act; and (d) section 17(d) of the Act and rule 17d– 1 under the Act to permit certain joint arrangements (‘‘Prior Order’’).1 AGENCY: Summary of the Application: The Prior Order permitted certain registered open-end management investment companies to participate in a joint lending and borrowing facility. Applicants seek to amend the Prior Order to modify the Rate Conditions (as defined below) and to request an exemption from section 17(a)(2) of the Act. Applicants: Fidelity Aberdeen Street Trust; Fidelity Advisor Series I; Fidelity Advisor Series II; Fidelity Advisor Series IV; Fidelity Advisor Series VII; Fidelity Advisor Series VIII; Fidelity Beacon Street Trust; Fidelity Boylston Street Trust; Fidelity California Municipal Trust; Fidelity California Municipal Trust II; Fidelity Capital Trust; Fidelity Central Investment Portfolios LLC; Fidelity Central Investment Portfolios II LLC; Fidelity Charles Street Trust; Fidelity Colchester Street Trust; Fidelity Commonwealth Trust; Fidelity Commonwealth Trust II; Fidelity Concord Street Trust; Fidelity 1 Colchester Street Trust, et al., Investment Company Act Release Nos. 24563 (Jul. 24, 2000) (notice) and 24602 (Aug. 21, 2000) (‘‘Prior Order’’), amending, Colchester Street Trust, et al., Investment Company Act Release Nos. 23787 (Apr. 15, 1999) (notice) and 23831 (May 11, 1999) (order), superseding, Daily Money Fund, et al., Investment Company Act Release Nos. 17257 (Dec. 8, 1989) (notice) and 17303 (Jan. 11, 1990) (order). E:\FR\FM\13NON1.SGM 13NON1

Agencies

[Federal Register Volume 77, Number 219 (Tuesday, November 13, 2012)]
[Notices]
[Pages 67688-67689]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-27520]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION


Advisory Committee on Reactor Safeguards (ACRS), Meeting of the 
ACRS Subcommittee on Reliability and PRA; Notice of Meeting

    The ACRS Subcommittee on Reliability and PRA will hold a meeting on 
December 4, 2012, Room T-2B1, 11545 Rockville Pike, Rockville, 
Maryland.
    The entire meeting will be open to public attendance.
    The agenda for the subject meeting shall be as follows:

Tuesday, December 4, 2012--1:00 p.m. Until 5:00 p.m.

    The Subcommittee will be briefed on the progress of the Level 3 
Probabilistic Risk Assessment (PRA) development plan. The Subcommittee 
will hear presentations by and hold discussions with the NRC staff and 
other interested persons regarding this matter. The Subcommittee will 
gather information, analyze relevant issues and facts, and formulate 
proposed positions and actions, as appropriate, for deliberation by the 
Full Committee.
    Members of the public desiring to provide oral statements and/or 
written comments should notify the Designated

[[Page 67689]]

Federal Official (DFO), John Lai (Telephone 301-415-5197 or Email: 
John.Lai@nrc.gov) five days prior to the meeting, if possible, so that 
appropriate arrangements can be made. Thirty-five hard copies of each 
presentation or handout should be provided to the DFO thirty minutes 
before the meeting. In addition, one electronic copy of each 
presentation should be emailed to the DFO one day before the meeting. 
If an electronic copy cannot be provided within this timeframe, 
presenters should provide the DFO with a CD containing each 
presentation at least thirty minutes before the meeting. Electronic 
recordings will be permitted only during those portions of the meeting 
that are open to the public. Detailed procedures for the conduct of and 
participation in ACRS meetings were published in the Federal Register 
on October 18, 2012, (77 FR 64146-64147).
    Detailed meeting agendas and meeting transcripts are available on 
the NRC Web site at https://www.nrc.gov/reading-rm/doc-collections/acrs. 
Information regarding topics to be discussed, changes to the agenda, 
whether the meeting has been canceled or rescheduled, and the time 
allotted to present oral statements can be obtained from the Web site 
cited above or by contacting the identified DFO. Moreover, in view of 
the possibility that the schedule for ACRS meetings may be adjusted by 
the Chairman as necessary to facilitate the conduct of the meeting, 
persons planning to attend should check with these references if such 
rescheduling would result in a major inconvenience.
    If attending this meeting, please enter through the One White Flint 
North building, 11555 Rockville Pike, Rockville, MD. After registering 
with security, please contact Mr. Theron Brown (Telephone 240-888-9835) 
to be escorted to the meeting room.

    Dates: November 6, 2012.
Antonio Dias,
Technical Advisor, Advisory Committee on Reactor Safeguards.
[FR Doc. 2012-27520 Filed 11-9-12; 8:45 am]
BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.