Liberty Energy (Georgia) Corp.; Notice of Application, 67639-67640 [2012-27506]
Download as PDF
Federal Register / Vol. 77, No. 219 / Tuesday, November 13, 2012 / Notices
67639
FERC–729—ELECTRIC TRANSMISSION FACILITIES
Number of respondents
Number of
responses
per
respondent
Total number
of responses
Average
burden hours
per response
Estimated total
annual burden
(A)
(B)
(A)×(B)=(C)
(D)
(C)×(D)
1 .......................................................................................................................
1
1
9,600
9,600
The total estimated annual cost
burden to respondents is $662,492.31
[9,600 hours ÷ 2,080 5 hours per year =
4.61538 * $143,540 = $662,492.31].
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Take notice that on October 25,
Liberty Energy (Georgia) Corp. (Liberty
Georgia), 2845 Bristol Circle, Oakville,
Ontario, Canada L6H 7H7, filed in
Docket No. CP13–10–000, an
application pursuant to section 7(f) of
the Natural Gas Act (NGA) requesting
the determination of a service area
within which Liberty Georgia may,
without further Commission
authorization, enlarge or expand its
natural gas distribution facilities.
Liberty Georgia also requests: (i) A
waiver of the Commission’s accounting
and reporting requirements and other
regulatory requirements ordinarily
applicable to natural gas companies
under the NGA and the NGPA; (ii)
pregranted abandonment of this service;
and (iii) such further relief the
Commission may deem appropriate, all
as more fully set forth in the
application, which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Liberty Georgia, a newly created
entity, states that it agreed on August 8,
2012, to purchase natural gas
distribution assets owned by Atmos
Energy Corporation (Atmos) in Georgia.1
Liberty Georgia now seeks a section 7(f)
service area determination in order to
provide natural gas service to
approximately 64,000 customers in
Georgia. The purchased Georgia
facilities will include approximately
1,313 miles of gas transmission and
distribution mains in Barrow,
Chattahoochee, Hall, Harris, Jackson,
Muscogee, and Oconee Counties. The
Georgia facilities also include the
distribution systems serving Columbus,
Georgia, and Gainesville, Georgia.
Liberty Georgia states that it would
also acquire from Atmos (i)
approximately 7,078 feet of 6-inch
diameter pipeline (ii) 14,040 feet of 6inch diameter pipeline, and (iii)
approximately 14,150 feet of 10-inch
pipeline that extend from an
interconnection with Southern Natural
Gas Company in Russell County,
Alabama, to the Alabama-Georgia border
at the northern bank of the
Chattahoochee River (Alabama
facilities), where they interconnect with
Atmos’ Georgia facilities that serve the
distribution system on the U.S. Army
base at Fort Benning, Georgia.
Any questions regarding this
application should be directed to
William F. Demarest, Jr., Husch
Blackwell LLP, 750 17th St. NW., Suite
900, Washington, DC 20006, or at (202)
5 2080 hours/year = 40 hours/week * 52 weeks/
year.
1 See Atmos Energy Corp., 126 FERC ¶ 62,118
(2009).
Dated: November 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–27508 Filed 11–9–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–10–000]
srobinson on DSK4SPTVN1PROD with
Liberty Energy (Georgia) Corp.; Notice
of Application
VerDate Mar<15>2010
17:08 Nov 09, 2012
Jkt 229001
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
378–2310 (telephone) or email:
william.demarest@huschblackwell..com.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
E:\FR\FM\13NON1.SGM
13NON1
67640
Federal Register / Vol. 77, No. 219 / Tuesday, November 13, 2012 / Notices
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link.
Comment Date: 5:00 p.m. Eastern time
on Tuesday, November 27, 2012.
Dated: November 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–27506 Filed 11–9–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
srobinson on DSK4SPTVN1PROD with
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC13–30–000.
Applicants: Canadian Hills Wind,
LLC, Canadian Hills Holdings Company,
LLC.
Description: Application for
Authorization Under Section 203 of the
FPA for Disposition of Jurisdictional
Facilities and Request for Expedited
Consideration and Confidential
Treatment of Canadian Hills Wind, LLC,
et al.
Filed Date: 11/2/12.
Accession Number: 20121102–5083.
Comments Due: 5 p.m. ET 11/23/12.
Docket Numbers: EC13–31–000.
Applicants: New York State Electric &
Gas Corporation.
Description: Application for
Authorization Under Section 203 of the
FPA and Request for Waivers and
Expedited Action of New York State
Electric & Gas Corporation.
Filed Date: 11/1/12.
Accession Number: 20121101–5192.
Comments Due: 5 p.m. ET 11/23/12.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–3084–004;
ER11–2954–003; ER10–1277–003; ER10–
1186–003; ER11–3097–004; ER10–1211–
VerDate Mar<15>2010
17:08 Nov 09, 2012
Jkt 229001
003; ER10–1212–003; ER10–1188–003;
ER11–4626–002; ER10–1329–004; ER10–
1187–002.
Applicants: The Detroit Edison
Company, DTE Calvert City, LLC, DTE
East China, LLC, DTE Energy Supply,
Inc., DTE Energy Trading, Inc., DTE
Pontiac North, LLC, DTE River Rouge
No. 1, L.L.C., DTE Stoneman, LLC, Mt.
Poso Cogeneration Company, LLC, St.
Paul Cogeneration, LLC, Woodland
Biomass Power Ltd.
Description: Notice of Change in
Status of The Detroit Edison Company,
et al.
Filed Date: 10/31/12.
Accession Number: 20121031–5417.
Comments Due: 5 p.m. ET 11/21/12.
Docket Numbers: ER11–4711–002.
Applicants: R&R Energy, Inc.
Description: R&R Compliance Filing
103012 to be effective 12/31/2012.
Filed Date: 11/2/12.
Accession Number: 20121102–5006.
Comments Due: 5 p.m. ET 11/23/12.
Docket Numbers: ER12–911–002.
Applicants: CPV Sentinel, LLC.
Description: Notice of Change in Facts
of CPV Sentinel, LLC.
Filed Date: 10/31/12.
Accession Number: 20121031–5416.
Comments Due: 5 p.m. ET 11/21/12.
Docket Numbers: ER13–29–001.
Applicants: BITH Solar 1, LLC.
Description: Amendment of Pending
Filing 1 to be effective 12/1/2012.
Filed Date: 11/2/12.
Accession Number: 20121102–5005.
Comments Due: 5 p.m. ET 11/23/12.
Docket Numbers: ER13–48–001.
Applicants: BITH Energy, Inc.
Description: Amendment of Pending
Tariff Filing 1 to be effective 12/1/2012.
Filed Date: 11/2/12.
Accession Number: 20121102–5004.
Comments Due: 5 p.m. ET 11/23/12.
Docket Numbers: ER13–286–000.
Applicants: AEP Generating
Company.
Description: Unit Power Agreements
Amendment to be effective 12/31/2012.
Filed Date: 11/1/12.
Accession Number: 20121101–5114.
Comments Due: 5 p.m. ET 11/23/12.
Docket Numbers: ER13–287–000.
Applicants: AEP Texas Central
Company.
Description: TCC–IPA Coleto CreekSouth Texas EC GIA Cancellation to be
effective 7/20/2012.
Filed Date: 11/1/12.
Accession Number: 20121101–5120.
Comments Due: 5 p.m. ET 11/23/12.
Docket Numbers: ER13–288–000.
Applicants: Entergy Arkansas, Inc.
Description: Attachment Y—
Transmission Service Monitoring
Agreement to be effective 12/1/2012.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Filed Date: 11/1/12.
Accession Number: 20121101–5144.
Comments Due: 5 p.m. ET 11/23/12.
Docket Numbers: ER13–289–000.
Applicants: Ri-Corp. Development,
Inc.
Description: RDC Tariff to be effective
11/2/2012.
Filed Date: 11/1/12.
Accession Number: 20121101–5158.
Comments Due: 5 p.m. ET 11/23/12.
Docket Numbers: ER13–290–000.
Applicants: Michigan Power Limited
Partnership.
Description: Revision to Market-Based
Rate Tariff to be effective 11/2/2012.
Filed Date: 11/1/12.
Accession Number: 20121101–5161.
Comments Due: 5 p.m. ET 11/23/12.
Docket Numbers: ER13–291–000.
Applicants: EnergyMark, LLC.
Description: EnergyMark MBR
Application to be effective 1/2/2013.
Filed Date: 11/2/12.
Accession Number: 20121102–5023.
Comments Due: 5 p.m. ET 11/23/12.
Docket Numbers: ER13–292–000.
Applicants: EBC Energy, LLC.
Description: EBC Energy, LLC submits
tariff filing per 35.12: EBC Energy LLC,
FERC Electric Tariff to be effective 12/
19/2013.
Filed Date: 11/2/12.
Accession Number: 20121102–5032.
Comments Due: 5 p.m. ET 11/23/12.
Docket Numbers: ER13–293–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
submits tariff filing per 35.13(a)(2)(iii:
2013 NESCOE Budget to be effective 1/
1/2013.
Filed Date: 11/2/12.
Accession Number: 20121102–5033.
Comments Due: 5 p.m. ET 11/23/12.
Docket Numbers: ER13–294–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii:
SA 2486 Bison T–T to be effective 11/
3/2012.
Filed Date: 11/2/12.
Accession Number: 20121102–5036.
Comments Due: 5 p.m. ET 11/23/12.
Docket Numbers: ER13–295–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits tariff filing per
35.13(a)(2)(iii: 2486 ITC Great Plains/
NPPD/Midwest Interconnection
Agreement to be effective 12/31/9998.
Filed Date: 11/1/12.
Accession Number: 20121101–5186.
Comments Due: 5 p.m. ET 11/23/12.
Docket Numbers: ER13–296–000.
E:\FR\FM\13NON1.SGM
13NON1
Agencies
[Federal Register Volume 77, Number 219 (Tuesday, November 13, 2012)]
[Notices]
[Pages 67639-67640]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-27506]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP13-10-000]
Liberty Energy (Georgia) Corp.; Notice of Application
Take notice that on October 25, Liberty Energy (Georgia) Corp.
(Liberty Georgia), 2845 Bristol Circle, Oakville, Ontario, Canada L6H
7H7, filed in Docket No. CP13-10-000, an application pursuant to
section 7(f) of the Natural Gas Act (NGA) requesting the determination
of a service area within which Liberty Georgia may, without further
Commission authorization, enlarge or expand its natural gas
distribution facilities. Liberty Georgia also requests: (i) A waiver of
the Commission's accounting and reporting requirements and other
regulatory requirements ordinarily applicable to natural gas companies
under the NGA and the NGPA; (ii) pregranted abandonment of this
service; and (iii) such further relief the Commission may deem
appropriate, all as more fully set forth in the application, which is
on file with the Commission and open to public inspection. The filing
may also be viewed on the web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
Liberty Georgia, a newly created entity, states that it agreed on
August 8, 2012, to purchase natural gas distribution assets owned by
Atmos Energy Corporation (Atmos) in Georgia.\1\ Liberty Georgia now
seeks a section 7(f) service area determination in order to provide
natural gas service to approximately 64,000 customers in Georgia. The
purchased Georgia facilities will include approximately 1,313 miles of
gas transmission and distribution mains in Barrow, Chattahoochee, Hall,
Harris, Jackson, Muscogee, and Oconee Counties. The Georgia facilities
also include the distribution systems serving Columbus, Georgia, and
Gainesville, Georgia.
---------------------------------------------------------------------------
\1\ See Atmos Energy Corp., 126 FERC ] 62,118 (2009).
---------------------------------------------------------------------------
Liberty Georgia states that it would also acquire from Atmos (i)
approximately 7,078 feet of 6-inch diameter pipeline (ii) 14,040 feet
of 6-inch diameter pipeline, and (iii) approximately 14,150 feet of 10-
inch pipeline that extend from an interconnection with Southern Natural
Gas Company in Russell County, Alabama, to the Alabama-Georgia border
at the northern bank of the Chattahoochee River (Alabama facilities),
where they interconnect with Atmos' Georgia facilities that serve the
distribution system on the U.S. Army base at Fort Benning, Georgia.
Any questions regarding this application should be directed to
William F. Demarest, Jr., Husch Blackwell LLP, 750 17th St. NW., Suite
900, Washington, DC 20006, or at (202) 378-2310 (telephone) or email:
william.demarest@huschblackwell..com.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 14 copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's
[[Page 67640]]
environmental review process. Environmental commenters will not be
required to serve copies of filed documents on all other parties.
However, the non-party commenters will not receive copies of all
documents filed by other parties or issued by the Commission (except
for the mailing of environmental documents issued by the Commission)
and will not have the right to seek court review of the Commission's
final order.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under the ``e-Filing''
link.
Comment Date: 5:00 p.m. Eastern time on Tuesday, November 27, 2012.
Dated: November 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-27506 Filed 11-9-12; 8:45 am]
BILLING CODE 6717-01-P