Drawbridge Operation Regulation; Columbia River, Vancouver, WA, 66714 [2012-27251]
Download as PDF
66714
Federal Register / Vol. 77, No. 216 / Wednesday, November 7, 2012 / Rules and Regulations
The regulations in 33 CFR
100.1101 will be enforced on November
11, 2012 from 7 a.m. until 11:30 a.m.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this notice, call
or email Petty Officer Bryan Gollogly,
Waterways Management, U.S. Coast
Guard Sector San Diego, CA; telephone
(619) 278–7656, email D11-PFMarineEventsSanDiego@uscg.mil.
DATES:
The Coast
Guard will enforce the special local
regulations in 33 CFR 100.1101 on
November 11, 2012 from 7 a.m. to 11:30
a.m. in support of the annual San Diego
Fall Classic (Item 1 on Table 1 of 33 CFR
100.1101). The Coast Guard will enforce
the special local regulations on the
navigable waters of Mission Bay from
Fiesta Island and along the southern and
western shore of Vacation Isle. The
event will consist of approximately 100
participants in rowing shells ranging
from 26 to 55 feet in length. Each race
will consist of heats of approximately
six to eight rowing shells. The sponsor
will provide seven to nine safety
perimeter vessels to patrol the
racecourse.
Under the provisions of 33 CFR
100.1101, persons and vessels are
prohibited from entering into, transiting
through, or anchoring within this safety
zone unless authorized by the Captain
of the Port, or his designated
representative. The Coast Guard may be
assisted by other Federal, State, or local
law enforcement agencies in enforcing
this regulation.
This notice is issued under authority
of 33 CFR 100.1101 and 5 U.S.C. 552(a).
In addition to this notice in the Federal
Register, the Coast Guard will provide
the maritime community with extensive
advance notification of this enforcement
period via the Local Notice to Mariners,
state, or local agencies.
SUPPLEMENTARY INFORMATION:
Dated: October 18, 2012.
S.M. Mahoney,
Captain of the Port San Diego, United States
Coast Guard.
[FR Doc. 2012–27252 Filed 11–6–12; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
srobinson on DSK4SPTVN1PROD with
33 CFR Part 117
[Docket No. USCG–2012–0978]
Drawbridge Operation Regulation;
Columbia River, Vancouver, WA
AGENCY:
Coast Guard, DHS.
VerDate Mar<15>2010
17:07 Nov 06, 2012
Jkt 229001
Notice of temporary deviation
from regulations.
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Murray
Morgan Bridge, also known as the South
11th Street Bridge, across the Thea Foss
Waterway, mile 0.6, previously known
as City Waterway, at Tacoma, WA. This
deviation is necessary to perform
extensive maintenance and repair work
on the bridge as part a major bridge
rehabilitation project. This deviation
allows the bridge to remain in the
closed position during construction
activities.
DATES: This deviation is effective from
8 a.m. on November 10, 2012 through 8
p.m. December 21, 2012.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2012–
0978 and are available online by going
to https://www.regulations.gov, inserting
USCG–2012–0978 in the ‘‘Keyword’’
box and then clicking ‘‘Search’’. They
are also available for inspection or
copying at the Docket Management
Facility (M–30), U.S. Department of
Transportation, West Building Ground
Floor, Room W12–140, 1200 New Jersey
Avenue SE., Washington, DC 20590,
between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
email the Bridge Administrator, Coast
Guard Thirteenth District; telephone
206–220–7282 email
randall.d.overton@uscg.mil. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The City
of Tacoma has requested to place the
Murray Morgan Bridge (South 11th
Street Bridge) in the closed or down
position and to not open the bridge for
vessel traffic to facilitate a major
rehabilitation project on the bridge. The
Murray Morgan Bridge crosses Thea
Foss Waterway (previously known as
City Waterway) at mile 0.6, at Tacoma,
WA. The Murray Morgan Bridge is a
vertical lift bridge. During this deviation
the bridge will be placed in the closed
or down position. There will be a debris
containment system attached to the
underside of the bridge for the duration
of construction activities. A minimum
vertical clearance of 57 feet above mean
high water will be provided beneath the
bridge and the attached debris
containment system, at all times during
the deviation period. Vessels which do
not require a bridge opening may
SUMMARY:
PO 00000
Frm 00012
Fmt 4700
Sfmt 4700
continue to transit beneath the bridge
during this closure period. Under
normal operations the bridge operates
under 33 CFR 117.1063 which requires
a two hour notice for an opening and
allows the bridge to remain closed
during morning and afternoon rush
hours. This current deviation states the
lift span of the Murray Morgan Bridge
across Thea Foss Waterway, mile 0.6,
need not open from 8 a.m. on November
10, 2012 through 8 p.m. December 21,
2012; except as otherwise outlined in
this article and through ongoing
coordination with waterway users.
During this deviation period the bridge
will be placed in the open position from
8 a.m. November 22 through 8 p.m.
November 25, 2012 and from 8 a.m.
December 8 through 8 p.m. December 9,
2012.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: October 29, 2012.
Randall D. Overton,
Bridge Administrator.
[FR Doc. 2012–27251 Filed 11–6–12; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2012–0965]
Drawbridge Operation Regulation;
China Basin, San Francisco, CA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Third Street
Drawbridge across China Basin, mile
0.0, at San Francisco, CA. The deviation
is necessary to allow the public to cross
the bridge to participate in the
scheduled RedBull Flugtag, a
community event. This deviation allows
the bridge to remain in the closed-tonavigation position during the deviation
period.
DATES: This deviation is effective from
9 a.m. to 6 p.m. on November 10, 2012.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of the docket USCG–
2012–0965 and are available online by
going to https://www.regulations.gov,
SUMMARY:
E:\FR\FM\07NOR1.SGM
07NOR1
Agencies
[Federal Register Volume 77, Number 216 (Wednesday, November 7, 2012)]
[Rules and Regulations]
[Page 66714]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-27251]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2012-0978]
Drawbridge Operation Regulation; Columbia River, Vancouver, WA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Murray Morgan Bridge, also known as
the South 11th Street Bridge, across the Thea Foss Waterway, mile 0.6,
previously known as City Waterway, at Tacoma, WA. This deviation is
necessary to perform extensive maintenance and repair work on the
bridge as part a major bridge rehabilitation project. This deviation
allows the bridge to remain in the closed position during construction
activities.
DATES: This deviation is effective from 8 a.m. on November 10, 2012
through 8 p.m. December 21, 2012.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2012-0978 and are available online
by going to https://www.regulations.gov, inserting USCG-2012-0978 in the
``Keyword'' box and then clicking ``Search''. They are also available
for inspection or copying at the Docket Management Facility (M-30),
U.S. Department of Transportation, West Building Ground Floor, Room
W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or email the Bridge Administrator, Coast Guard Thirteenth
District; telephone 206-220-7282 email randall.d.overton@uscg.mil. If
you have questions on viewing the docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The City of Tacoma has requested to place
the Murray Morgan Bridge (South 11th Street Bridge) in the closed or
down position and to not open the bridge for vessel traffic to
facilitate a major rehabilitation project on the bridge. The Murray
Morgan Bridge crosses Thea Foss Waterway (previously known as City
Waterway) at mile 0.6, at Tacoma, WA. The Murray Morgan Bridge is a
vertical lift bridge. During this deviation the bridge will be placed
in the closed or down position. There will be a debris containment
system attached to the underside of the bridge for the duration of
construction activities. A minimum vertical clearance of 57 feet above
mean high water will be provided beneath the bridge and the attached
debris containment system, at all times during the deviation period.
Vessels which do not require a bridge opening may continue to transit
beneath the bridge during this closure period. Under normal operations
the bridge operates under 33 CFR 117.1063 which requires a two hour
notice for an opening and allows the bridge to remain closed during
morning and afternoon rush hours. This current deviation states the
lift span of the Murray Morgan Bridge across Thea Foss Waterway, mile
0.6, need not open from 8 a.m. on November 10, 2012 through 8 p.m.
December 21, 2012; except as otherwise outlined in this article and
through ongoing coordination with waterway users. During this deviation
period the bridge will be placed in the open position from 8 a.m.
November 22 through 8 p.m. November 25, 2012 and from 8 a.m. December 8
through 8 p.m. December 9, 2012.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: October 29, 2012.
Randall D. Overton,
Bridge Administrator.
[FR Doc. 2012-27251 Filed 11-6-12; 8:45 am]
BILLING CODE 9110-04-P