Projects Approved for Consumptive Uses of Water, 66909-66910 [2012-27110]
Download as PDF
Federal Register / Vol. 77, No. 216 / Wednesday, November 7, 2012 / Notices
The Securities and Exchange
Commission published a document in
the Federal Register on October 26,
2012, concerning an Order Granting
Approval of Proposed Rule Change
Relating to Post-Trade Transparency for
Agency Pass-Through Mortgage-Backed
Securities Traded in Specified Pool
Transactions and SBA-Backed AssetBacked Securities Transactions. The
document contained a typographical
error.
FOR FURTHER INFORMATION CONTACT:
Michael P. Bradley, Division of Trading
and Markets, Securities and Exchange
Commission, 100 F Street NE.,
Washington, DC 20549, (202) 551–5594.
SUMMARY:
Correction
In the Federal Register of October 26,
2012 in FR Doc. 2012–65436, on page
65437, in the seventh line in the
paragraph under the heading
‘‘Regulatory Notice’’ in the second
column, correct the reference to 180
days instead to 270 days.
Dated: October 31, 2012.
Kevin M. O’Neill,
Deputy Secretary.
[FR Doc. 2012–27081 Filed 11–6–12; 8:45 am]
BILLING CODE 8011–01–P
DEPARTMENT OF STATE
[Public Notice 8080]
Notification of Contact Information
Change for the Benghazi
Accountability Review Board
On October 1, 2012, the
Department of State announced the
formation of the Benghazi
Accountability Review Board (ARB) in
the Federal Register (FR Doc. 2012–
24504). Effective November 5, 2012, the
ARB will permanently change offices.
The main telephone number will change
to (202) 647–2316. The main fax number
will change to (202) 647–3301.
SUMMARY:
Dated: October 31, 2012.
Patrick F. Kennedy,
Under Secretary of State for Management,
Department of State.
[FR Doc. 2012–27189 Filed 11–6–12; 8:45 am]
pmangrum on DSK3VPTVN1PROD with NOTICES
BILLING CODE 4710–35–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Projects Approved for Consumptive
Uses of Water
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
VerDate Mar<15>2010
15:43 Nov 06, 2012
Jkt 229001
This notice lists the projects
approved by rule by the Susquehanna
River Basin Commission during the
period set forth in DATES.
DATES: September 1, 2012, through
September 30, 2012.
ADDRESSES: Susquehanna River Basin
Commission, 1721 North Front Street,
Harrisburg, PA 17102–2391.
FOR FURTHER INFORMATION CONTACT:
Richard A. Cairo, General Counsel,
telephone: (717) 238–0423, ext. 306; fax:
(717) 238–2436; email: rcairo@srbc.net.
Regular mail inquiries may be sent to
the above address.
SUPPLEMENTARY INFORMATION: This
notice lists the projects, described
below, receiving approval for the
consumptive use of water pursuant to
the Commission’s approval by rule
process set forth in 18 CFR 806.22(f) for
the time period specified above:
SUMMARY:
Approvals by Rule Issued Under 18
CFR 806.22(f)
1. Southwestern Energy Production
Company, Pad ID: ENDLESS
MOUNTAIN RECREATION, ABR–
201209001, New Milford Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 4.999 mgd; Approval Date:
September 4, 2012.
2. Talisman Energy USA Inc., Pad ID:
05 112 Abell G, ABR–201209002,
Warren Township, Bradford County,
Pa.; Consumptive Use of Up to 6.000
mgd; Approval Date: September 10,
2012.
3. Atlas Resources, LLC, Pad ID:
Logue Pad B, ABR–201209003, Gamble
Township, Lycoming County, Pa.;
Consumptive Use of Up to 4.000 mgd;
Approval Date: September 11, 2012.
4. WPX Energy Appalachia, LLC, Pad
ID: Beckley Well Pad, ABR–201209004,
Franklin Township, Susquehanna
County, Pa.; Consumptive Use of Up to
4.000 mgd; Approval Date: September
11, 2012.
5. XTO Energy Incorporated, Pad ID:
West Brown B, ABR–201209005,
Moreland Township, Lycoming County,
Pa.; Consumptive Use of Up to 4.500
mgd; Approval Date: September 14,
2012.
6. Southwestern Energy Production
Company, Pad ID: WOOSMAN PAD,
ABR–201209006, New Milford
Township, Susquehanna County, Pa.;
Consumptive Use of Up to 4.999 mgd;
Approval Date: September 18, 2012.
7. Southwestern Energy Production
Company, Pad ID: SWOPE PAD, ABR–
201209007, Jackson Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 4.999 mgd; Approval Date:
September 18, 2012.
8. Southwestern Energy Production
Company, Pad ID: MULLOY PAD, ABR–
PO 00000
Frm 00117
Fmt 4703
Sfmt 4703
66909
201209008, Jackson Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 4.999 mgd; Approval Date:
September 18, 2012.
9. Southwestern Energy Production
Company, Pad ID: MARVIN PAD, ABR–
201209009, Jackson Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 4.999 mgd; Approval Date:
September 18, 2012.
10. Southwestern Energy Production
Company, Pad ID: FREITAG PAD, ABR–
201209010, Jackson Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 4.999 mgd; Approval Date:
September 18, 2012.
11. Chesapeake Appalachia, LLC, Pad
ID: Gene, ABR–201209011, Overton
Township, Bradford County, Pa.;
Consumptive Use of Up to 7.500 mgd;
Approval Date: September 24, 2012.
12. Chesapeake Appalachia, LLC, Pad
ID: Yencha, ABR–201209012, Monroe
Township, Bradford County, Pa.;
Consumptive Use of Up to 7.500 mgd;
Approval Date: September 24, 2012.
13. SWEPI LP, Pad ID: Delaney 651,
ABR–201209013, Sullivan Township,
Tioga County, Pa.; Consumptive Use of
Up to 4.000 mgd; Approval Date:
September 24, 2012.
14. Chesapeake Appalachia, LLC, Pad
ID: Blueberry Hill, ABR–201209014,
Overton Township, Bradford County,
Pa.; Consumptive Use of Up to 7.500
mgd; Approval Date: September 25,
2012.
15. Chesapeake Appalachia, LLC, Pad
ID: Carr, ABR–201209015, Wilmot
Township, Bradford County, Pa.;
Consumptive Use of Up to 7.500 mgd;
Approval Date: September 25, 2012.
16. Talisman Energy USA Inc., Pad
ID: 01 099 Storch, ABR–201209016,
Troy Township, Bradford County, Pa.;
Consumptive Use of Up to 6.000 mgd;
Approval Date: September 25, 2012.
17. Southwestern Energy Production
Company, Pad ID: Cooley (Pad 2), ABR–
201209017, Orwell Township, Bradford
County, Pa.; Consumptive Use of Up to
4.999 mgd; Approval Date: September
25, 2012.
18. Southwestern Energy Production
Company, Pad ID: Gypsy HillEastabrook (Pad 5), ABR–201209018,
Orwell Township, Bradford County, Pa.;
Consumptive Use of Up to 4.999 mgd;
Approval Date: September 25, 2012.
19. Southwestern Energy Production
Company, Pad ID: Rabago Birk (Pad 10),
ABR–201209019, Herrick and Standing
Stone Townships, Bradford County, Pa.;
Consumptive Use of Up to 4.999 mgd;
Approval Date: September 25, 2012.
20. WPX Energy Appalachia, LLC,
Pad ID: Wootton East Well Pad, ABR–
201209020, Liberty Township,
Susquehanna County, Pa.; Consumptive
E:\FR\FM\07NON1.SGM
07NON1
66910
Federal Register / Vol. 77, No. 216 / Wednesday, November 7, 2012 / Notices
Use of Up to 4.000 mgd; Approval Date:
September 25, 2012.
21. Chief Oil & Gas LLC, Pad ID:
Romisoukas Drilling Pad, ABR–
201209021, Canton Township, Bradford
County, Pa.; Consumptive Use of Up to
2.000 mgd; Approval Date: September
25, 2012.
22. WPX Energy Appalachia, LLC,
Pad ID: McLallen Well Pad, ABR–
201209022, Choconut Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 4.000 mgd; Approval Date:
September 25, 2012.
23. WPX Energy Appalachia, LLC,
Pad ID: Mordovancey Well Pad, ABR–
201209023, Choconut Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 4.000 mgd; Approval Date:
September 25, 2012.
24. Talisman Energy USA Inc., Pad
ID: 02 101 Olson, ABR–201209024,
Hamilton Township, Tioga County, Pa.;
Consumptive Use of Up to 6.000 mgd;
Approval Date: September 27, 2012.
Telephone: (619) 688–0100, Email:
Bruce_April@dot.ca.gov.
SUPPLEMENTARY INFORMATION: The
FHWA, on behalf of the California
Department of Transportation (Caltrans)
is advising the general public that
Caltrans conducted studies of the
potential environmental impacts
associated with the proposed highway
project. The SR–75/282 Transportation
Corridor Project is located in San Diego
County, west of the San Diego-Coronado
Bridge and uses the Fourth Street and
Third Street couplet to the naval Station
Air Station North Island (NASNI). The
project proposed various alternatives to
improve traffic congestion encountered
along State Routes 75 and 282, which
included a Transportation Demand
Management/Transportation System
Management alternative, Grade
Separation alternatives, Cut and Cover
Tunnel alternatives and Bored Tunnel
alternatives. The distance of the project
is approximately 1.5 miles.
Authority: Pub. L. 91–575, 84 Stat. 1509 et
seq., 18 CFR parts 806, 807, and 808.
Dated: October 22, 2012.
Stephanie L. Richardson,
Secretary to the Commission.
Issued on: November 1, 2012.
´
Manuel E. Sanchez,
Senior Transportation Engineer/Border
Engineer, Federal Highway Administration,
San Diego, California.
[FR Doc. 2012–27110 Filed 11–6–12; 8:45 am]
[FR Doc. 2012–27227 Filed 11–6–12; 8:45 am]
BILLING CODE 7040–01–P
BILLING CODE 4910–22–P
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Federal Highway Administration
Environmental Impact Statement, San
Diego County, California
The FHWA is issuing this
notice to advise the public that the
Notice of Intent to prepare an
Environmental Impact Statement (EIS)
for the proposed State Route 75/282
Transportation Corridor Project in the
city of Coronado in San Diego County,
California (Federal Register Vol. 72, No
10; FR Doc E7–491) will be withdrawn.
FOR FURTHER INFORMATION CONTACT:
Manuel E. Sanchez, Senior
Transportation Engineer/Border
Engineer, Federal Highway
Administration—California Division,
401 B Street, Suite 800, San Diego, CA
92101, Regular Office Hours: 6:30 a.m.
to 4:00 p.m., Telephone: (619) 699–
7336, Email: manuel.sanchez@dot.gov,
or Bruce L. April, Deputy District
Director—Environmental, Caltrans
District 11, 4050 Taylor Street, MS 242,
San Diego, CA 92110, Regular Office
Hours: 8:00 a.m. to 5:00 p.m.,
pmangrum on DSK3VPTVN1PROD with NOTICES
VerDate Mar<15>2010
15:43 Nov 06, 2012
Jkt 229001
Notice of Final Federal Agency Actions
on Proposed Highway in California
Federal Highway
Administration (FHWA), DOT.
ACTION: Notice of Limitation on Claims
for Judicial Review of Actions by the
California Department of Transportation
(Caltrans), pursuant to 23 U.S.C. 327.
AGENCY:
Federal Highway
Administration (FHWA), DOT.
ACTION: Notice of Withdrawal.
AGENCY:
SUMMARY:
DEPARTMENT OF TRANSPORTATION
The FHWA, on behalf of
Caltrans, is issuing this notice to
announce actions taken by Caltrans, that
are final within the meaning of 23
U.S.C. 139(l)(1). The actions relate to a
proposed local bridge project, the 6th
Street Viaduct Seismic Improvement
Project in downtown Los Angeles over
the Los Angeles River (Bridge No. 53C–
1880) and the 6th Street Viaduct
Overcrossing, which spans the US 101
Hollywood Freeway (Bridge No. 53–
0595) in Los Angeles County, State of
California. Those actions grant licenses,
permits, and approvals for the project.
DATES: By this notice, the FHWA, on
behalf of Caltrans, is advising the public
of final agency actions subject to 23
U.S.C. 139(l)(1). A claim seeking
judicial review of the Federal agency
actions on the highway project will be
SUMMARY:
PO 00000
Frm 00118
Fmt 4703
Sfmt 4703
barred unless the claim is filed on or
before April 8, 2013 If the Federal law
that authorizes judicial review of a
claim provides a time period of less
than 150 days for filing such claim, then
that shorter time period still applies.
FOR FURTHER INFORMATION CONTACT: For
Caltrans: Carlos Montez, Senior
Environmental Planner, Division of
Environmental Analysis, California
Department of Transportation, 100 S.
Main St., Los Angeles, CA 900012,
Regular Office Hours 8:00 a.m. to 5:00
p.m., Telephone number 213–897–9116,
email carlos_montez@dot.ca.gov.
SUPPLEMENTARY INFORMATION: Effective
July 1, 2007, the Federal Highway
Administration (FHWA) assigned, and
the California Department of
Transportation (Caltrans) assumed,
environmental responsibilities for this
project pursuant to 23 U.S.C. 327.
Notice is hereby given that the Caltrans,
have taken final agency actions subject
to 23 U.S.C. 139(l)(1) by issuing
licenses, permits, and approvals for the
following highway project in the State
of California: The proposed project
would replace the existing 6th Street
Viaduct over the Los Angeles River and
the overcrossing, which also spans the
US 101 Hollywood Freeway. The
purpose of this project is to reduce the
vulnerability of the structure in a major
earthquake event and resolve design
deficiencies. The project will take
approximately four years to complete.
The FHWA project reference number is
5006 (342). The actions by the Federal
agencies, and the laws under which
such actions were taken, are described
in the Final Environmental Impact
Statement (FEIS) for the project,
approved on October 5, 2011, in the
FHWA Record of Decision (ROD) issued
on December 21, 2011, and in other
documents in the FHWA project
records. The FEIS, ROD, and other
project records are available by
contacting Caltrans at the addresses
provided above. The Caltrans FEIS and
ROD can be viewed and downloaded
from the project web site at https://
www.dot.ca.gov/dist07/resources/
envdocs/. This notice applies to all
Federal agency decisions as of the
issuance date of this notice and all laws
under which such actions were taken,
including but not limited to
1. National Environmental Policy Act
(NEPA)
2. Safe, Accountable, Flexible and
Efficient, Transportation Equity
Act, A Legacy for Users (SAFETEA–
LU)
3. MAP 21—Moving Ahead for Progress
in the 21st Century
E:\FR\FM\07NON1.SGM
07NON1
Agencies
[Federal Register Volume 77, Number 216 (Wednesday, November 7, 2012)]
[Notices]
[Pages 66909-66910]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-27110]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Projects Approved for Consumptive Uses of Water
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice lists the projects approved by rule by the
Susquehanna River Basin Commission during the period set forth in
DATES.
DATES: September 1, 2012, through September 30, 2012.
ADDRESSES: Susquehanna River Basin Commission, 1721 North Front Street,
Harrisburg, PA 17102-2391.
FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel,
telephone: (717) 238-0423, ext. 306; fax: (717) 238-2436; email:
rcairo@srbc.net. Regular mail inquiries may be sent to the above
address.
SUPPLEMENTARY INFORMATION: This notice lists the projects, described
below, receiving approval for the consumptive use of water pursuant to
the Commission's approval by rule process set forth in 18 CFR 806.22(f)
for the time period specified above:
Approvals by Rule Issued Under 18 CFR 806.22(f)
1. Southwestern Energy Production Company, Pad ID: ENDLESS MOUNTAIN
RECREATION, ABR-201209001, New Milford Township, Susquehanna County,
Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date: September 4,
2012.
2. Talisman Energy USA Inc., Pad ID: 05 112 Abell G, ABR-201209002,
Warren Township, Bradford County, Pa.; Consumptive Use of Up to 6.000
mgd; Approval Date: September 10, 2012.
3. Atlas Resources, LLC, Pad ID: Logue Pad B, ABR-201209003, Gamble
Township, Lycoming County, Pa.; Consumptive Use of Up to 4.000 mgd;
Approval Date: September 11, 2012.
4. WPX Energy Appalachia, LLC, Pad ID: Beckley Well Pad, ABR-
201209004, Franklin Township, Susquehanna County, Pa.; Consumptive Use
of Up to 4.000 mgd; Approval Date: September 11, 2012.
5. XTO Energy Incorporated, Pad ID: West Brown B, ABR-201209005,
Moreland Township, Lycoming County, Pa.; Consumptive Use of Up to 4.500
mgd; Approval Date: September 14, 2012.
6. Southwestern Energy Production Company, Pad ID: WOOSMAN PAD,
ABR-201209006, New Milford Township, Susquehanna County, Pa.;
Consumptive Use of Up to 4.999 mgd; Approval Date: September 18, 2012.
7. Southwestern Energy Production Company, Pad ID: SWOPE PAD, ABR-
201209007, Jackson Township, Susquehanna County, Pa.; Consumptive Use
of Up to 4.999 mgd; Approval Date: September 18, 2012.
8. Southwestern Energy Production Company, Pad ID: MULLOY PAD, ABR-
201209008, Jackson Township, Susquehanna County, Pa.; Consumptive Use
of Up to 4.999 mgd; Approval Date: September 18, 2012.
9. Southwestern Energy Production Company, Pad ID: MARVIN PAD, ABR-
201209009, Jackson Township, Susquehanna County, Pa.; Consumptive Use
of Up to 4.999 mgd; Approval Date: September 18, 2012.
10. Southwestern Energy Production Company, Pad ID: FREITAG PAD,
ABR-201209010, Jackson Township, Susquehanna County, Pa.; Consumptive
Use of Up to 4.999 mgd; Approval Date: September 18, 2012.
11. Chesapeake Appalachia, LLC, Pad ID: Gene, ABR-201209011,
Overton Township, Bradford County, Pa.; Consumptive Use of Up to 7.500
mgd; Approval Date: September 24, 2012.
12. Chesapeake Appalachia, LLC, Pad ID: Yencha, ABR-201209012,
Monroe Township, Bradford County, Pa.; Consumptive Use of Up to 7.500
mgd; Approval Date: September 24, 2012.
13. SWEPI LP, Pad ID: Delaney 651, ABR-201209013, Sullivan
Township, Tioga County, Pa.; Consumptive Use of Up to 4.000 mgd;
Approval Date: September 24, 2012.
14. Chesapeake Appalachia, LLC, Pad ID: Blueberry Hill, ABR-
201209014, Overton Township, Bradford County, Pa.; Consumptive Use of
Up to 7.500 mgd; Approval Date: September 25, 2012.
15. Chesapeake Appalachia, LLC, Pad ID: Carr, ABR-201209015, Wilmot
Township, Bradford County, Pa.; Consumptive Use of Up to 7.500 mgd;
Approval Date: September 25, 2012.
16. Talisman Energy USA Inc., Pad ID: 01 099 Storch, ABR-201209016,
Troy Township, Bradford County, Pa.; Consumptive Use of Up to 6.000
mgd; Approval Date: September 25, 2012.
17. Southwestern Energy Production Company, Pad ID: Cooley (Pad 2),
ABR-201209017, Orwell Township, Bradford County, Pa.; Consumptive Use
of Up to 4.999 mgd; Approval Date: September 25, 2012.
18. Southwestern Energy Production Company, Pad ID: Gypsy Hill-
Eastabrook (Pad 5), ABR-201209018, Orwell Township, Bradford County,
Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date: September 25,
2012.
19. Southwestern Energy Production Company, Pad ID: Rabago Birk
(Pad 10), ABR-201209019, Herrick and Standing Stone Townships, Bradford
County, Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date:
September 25, 2012.
20. WPX Energy Appalachia, LLC, Pad ID: Wootton East Well Pad, ABR-
201209020, Liberty Township, Susquehanna County, Pa.; Consumptive
[[Page 66910]]
Use of Up to 4.000 mgd; Approval Date: September 25, 2012.
21. Chief Oil & Gas LLC, Pad ID: Romisoukas Drilling Pad, ABR-
201209021, Canton Township, Bradford County, Pa.; Consumptive Use of Up
to 2.000 mgd; Approval Date: September 25, 2012.
22. WPX Energy Appalachia, LLC, Pad ID: McLallen Well Pad, ABR-
201209022, Choconut Township, Susquehanna County, Pa.; Consumptive Use
of Up to 4.000 mgd; Approval Date: September 25, 2012.
23. WPX Energy Appalachia, LLC, Pad ID: Mordovancey Well Pad, ABR-
201209023, Choconut Township, Susquehanna County, Pa.; Consumptive Use
of Up to 4.000 mgd; Approval Date: September 25, 2012.
24. Talisman Energy USA Inc., Pad ID: 02 101 Olson, ABR-201209024,
Hamilton Township, Tioga County, Pa.; Consumptive Use of Up to 6.000
mgd; Approval Date: September 27, 2012.
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806, 807, and 808.
Dated: October 22, 2012.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2012-27110 Filed 11-6-12; 8:45 am]
BILLING CODE 7040-01-P