Projects Approved for Consumptive Uses of Water, 66909-66910 [2012-27110]

Download as PDF Federal Register / Vol. 77, No. 216 / Wednesday, November 7, 2012 / Notices The Securities and Exchange Commission published a document in the Federal Register on October 26, 2012, concerning an Order Granting Approval of Proposed Rule Change Relating to Post-Trade Transparency for Agency Pass-Through Mortgage-Backed Securities Traded in Specified Pool Transactions and SBA-Backed AssetBacked Securities Transactions. The document contained a typographical error. FOR FURTHER INFORMATION CONTACT: Michael P. Bradley, Division of Trading and Markets, Securities and Exchange Commission, 100 F Street NE., Washington, DC 20549, (202) 551–5594. SUMMARY: Correction In the Federal Register of October 26, 2012 in FR Doc. 2012–65436, on page 65437, in the seventh line in the paragraph under the heading ‘‘Regulatory Notice’’ in the second column, correct the reference to 180 days instead to 270 days. Dated: October 31, 2012. Kevin M. O’Neill, Deputy Secretary. [FR Doc. 2012–27081 Filed 11–6–12; 8:45 am] BILLING CODE 8011–01–P DEPARTMENT OF STATE [Public Notice 8080] Notification of Contact Information Change for the Benghazi Accountability Review Board On October 1, 2012, the Department of State announced the formation of the Benghazi Accountability Review Board (ARB) in the Federal Register (FR Doc. 2012– 24504). Effective November 5, 2012, the ARB will permanently change offices. The main telephone number will change to (202) 647–2316. The main fax number will change to (202) 647–3301. SUMMARY: Dated: October 31, 2012. Patrick F. Kennedy, Under Secretary of State for Management, Department of State. [FR Doc. 2012–27189 Filed 11–6–12; 8:45 am] pmangrum on DSK3VPTVN1PROD with NOTICES BILLING CODE 4710–35–P SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water Susquehanna River Basin Commission. ACTION: Notice. AGENCY: VerDate Mar<15>2010 15:43 Nov 06, 2012 Jkt 229001 This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in DATES. DATES: September 1, 2012, through September 30, 2012. ADDRESSES: Susquehanna River Basin Commission, 1721 North Front Street, Harrisburg, PA 17102–2391. FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel, telephone: (717) 238–0423, ext. 306; fax: (717) 238–2436; email: rcairo@srbc.net. Regular mail inquiries may be sent to the above address. SUPPLEMENTARY INFORMATION: This notice lists the projects, described below, receiving approval for the consumptive use of water pursuant to the Commission’s approval by rule process set forth in 18 CFR 806.22(f) for the time period specified above: SUMMARY: Approvals by Rule Issued Under 18 CFR 806.22(f) 1. Southwestern Energy Production Company, Pad ID: ENDLESS MOUNTAIN RECREATION, ABR– 201209001, New Milford Township, Susquehanna County, Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date: September 4, 2012. 2. Talisman Energy USA Inc., Pad ID: 05 112 Abell G, ABR–201209002, Warren Township, Bradford County, Pa.; Consumptive Use of Up to 6.000 mgd; Approval Date: September 10, 2012. 3. Atlas Resources, LLC, Pad ID: Logue Pad B, ABR–201209003, Gamble Township, Lycoming County, Pa.; Consumptive Use of Up to 4.000 mgd; Approval Date: September 11, 2012. 4. WPX Energy Appalachia, LLC, Pad ID: Beckley Well Pad, ABR–201209004, Franklin Township, Susquehanna County, Pa.; Consumptive Use of Up to 4.000 mgd; Approval Date: September 11, 2012. 5. XTO Energy Incorporated, Pad ID: West Brown B, ABR–201209005, Moreland Township, Lycoming County, Pa.; Consumptive Use of Up to 4.500 mgd; Approval Date: September 14, 2012. 6. Southwestern Energy Production Company, Pad ID: WOOSMAN PAD, ABR–201209006, New Milford Township, Susquehanna County, Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date: September 18, 2012. 7. Southwestern Energy Production Company, Pad ID: SWOPE PAD, ABR– 201209007, Jackson Township, Susquehanna County, Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date: September 18, 2012. 8. Southwestern Energy Production Company, Pad ID: MULLOY PAD, ABR– PO 00000 Frm 00117 Fmt 4703 Sfmt 4703 66909 201209008, Jackson Township, Susquehanna County, Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date: September 18, 2012. 9. Southwestern Energy Production Company, Pad ID: MARVIN PAD, ABR– 201209009, Jackson Township, Susquehanna County, Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date: September 18, 2012. 10. Southwestern Energy Production Company, Pad ID: FREITAG PAD, ABR– 201209010, Jackson Township, Susquehanna County, Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date: September 18, 2012. 11. Chesapeake Appalachia, LLC, Pad ID: Gene, ABR–201209011, Overton Township, Bradford County, Pa.; Consumptive Use of Up to 7.500 mgd; Approval Date: September 24, 2012. 12. Chesapeake Appalachia, LLC, Pad ID: Yencha, ABR–201209012, Monroe Township, Bradford County, Pa.; Consumptive Use of Up to 7.500 mgd; Approval Date: September 24, 2012. 13. SWEPI LP, Pad ID: Delaney 651, ABR–201209013, Sullivan Township, Tioga County, Pa.; Consumptive Use of Up to 4.000 mgd; Approval Date: September 24, 2012. 14. Chesapeake Appalachia, LLC, Pad ID: Blueberry Hill, ABR–201209014, Overton Township, Bradford County, Pa.; Consumptive Use of Up to 7.500 mgd; Approval Date: September 25, 2012. 15. Chesapeake Appalachia, LLC, Pad ID: Carr, ABR–201209015, Wilmot Township, Bradford County, Pa.; Consumptive Use of Up to 7.500 mgd; Approval Date: September 25, 2012. 16. Talisman Energy USA Inc., Pad ID: 01 099 Storch, ABR–201209016, Troy Township, Bradford County, Pa.; Consumptive Use of Up to 6.000 mgd; Approval Date: September 25, 2012. 17. Southwestern Energy Production Company, Pad ID: Cooley (Pad 2), ABR– 201209017, Orwell Township, Bradford County, Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date: September 25, 2012. 18. Southwestern Energy Production Company, Pad ID: Gypsy HillEastabrook (Pad 5), ABR–201209018, Orwell Township, Bradford County, Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date: September 25, 2012. 19. Southwestern Energy Production Company, Pad ID: Rabago Birk (Pad 10), ABR–201209019, Herrick and Standing Stone Townships, Bradford County, Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date: September 25, 2012. 20. WPX Energy Appalachia, LLC, Pad ID: Wootton East Well Pad, ABR– 201209020, Liberty Township, Susquehanna County, Pa.; Consumptive E:\FR\FM\07NON1.SGM 07NON1 66910 Federal Register / Vol. 77, No. 216 / Wednesday, November 7, 2012 / Notices Use of Up to 4.000 mgd; Approval Date: September 25, 2012. 21. Chief Oil & Gas LLC, Pad ID: Romisoukas Drilling Pad, ABR– 201209021, Canton Township, Bradford County, Pa.; Consumptive Use of Up to 2.000 mgd; Approval Date: September 25, 2012. 22. WPX Energy Appalachia, LLC, Pad ID: McLallen Well Pad, ABR– 201209022, Choconut Township, Susquehanna County, Pa.; Consumptive Use of Up to 4.000 mgd; Approval Date: September 25, 2012. 23. WPX Energy Appalachia, LLC, Pad ID: Mordovancey Well Pad, ABR– 201209023, Choconut Township, Susquehanna County, Pa.; Consumptive Use of Up to 4.000 mgd; Approval Date: September 25, 2012. 24. Talisman Energy USA Inc., Pad ID: 02 101 Olson, ABR–201209024, Hamilton Township, Tioga County, Pa.; Consumptive Use of Up to 6.000 mgd; Approval Date: September 27, 2012. Telephone: (619) 688–0100, Email: Bruce_April@dot.ca.gov. SUPPLEMENTARY INFORMATION: The FHWA, on behalf of the California Department of Transportation (Caltrans) is advising the general public that Caltrans conducted studies of the potential environmental impacts associated with the proposed highway project. The SR–75/282 Transportation Corridor Project is located in San Diego County, west of the San Diego-Coronado Bridge and uses the Fourth Street and Third Street couplet to the naval Station Air Station North Island (NASNI). The project proposed various alternatives to improve traffic congestion encountered along State Routes 75 and 282, which included a Transportation Demand Management/Transportation System Management alternative, Grade Separation alternatives, Cut and Cover Tunnel alternatives and Bored Tunnel alternatives. The distance of the project is approximately 1.5 miles. Authority: Pub. L. 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808. Dated: October 22, 2012. Stephanie L. Richardson, Secretary to the Commission. Issued on: November 1, 2012. ´ Manuel E. Sanchez, Senior Transportation Engineer/Border Engineer, Federal Highway Administration, San Diego, California. [FR Doc. 2012–27110 Filed 11–6–12; 8:45 am] [FR Doc. 2012–27227 Filed 11–6–12; 8:45 am] BILLING CODE 7040–01–P BILLING CODE 4910–22–P DEPARTMENT OF TRANSPORTATION Federal Highway Administration Federal Highway Administration Environmental Impact Statement, San Diego County, California The FHWA is issuing this notice to advise the public that the Notice of Intent to prepare an Environmental Impact Statement (EIS) for the proposed State Route 75/282 Transportation Corridor Project in the city of Coronado in San Diego County, California (Federal Register Vol. 72, No 10; FR Doc E7–491) will be withdrawn. FOR FURTHER INFORMATION CONTACT: Manuel E. Sanchez, Senior Transportation Engineer/Border Engineer, Federal Highway Administration—California Division, 401 B Street, Suite 800, San Diego, CA 92101, Regular Office Hours: 6:30 a.m. to 4:00 p.m., Telephone: (619) 699– 7336, Email: manuel.sanchez@dot.gov, or Bruce L. April, Deputy District Director—Environmental, Caltrans District 11, 4050 Taylor Street, MS 242, San Diego, CA 92110, Regular Office Hours: 8:00 a.m. to 5:00 p.m., pmangrum on DSK3VPTVN1PROD with NOTICES VerDate Mar<15>2010 15:43 Nov 06, 2012 Jkt 229001 Notice of Final Federal Agency Actions on Proposed Highway in California Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 327. AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Withdrawal. AGENCY: SUMMARY: DEPARTMENT OF TRANSPORTATION The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans, that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed local bridge project, the 6th Street Viaduct Seismic Improvement Project in downtown Los Angeles over the Los Angeles River (Bridge No. 53C– 1880) and the 6th Street Viaduct Overcrossing, which spans the US 101 Hollywood Freeway (Bridge No. 53– 0595) in Los Angeles County, State of California. Those actions grant licenses, permits, and approvals for the project. DATES: By this notice, the FHWA, on behalf of Caltrans, is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be SUMMARY: PO 00000 Frm 00118 Fmt 4703 Sfmt 4703 barred unless the claim is filed on or before April 8, 2013 If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies. FOR FURTHER INFORMATION CONTACT: For Caltrans: Carlos Montez, Senior Environmental Planner, Division of Environmental Analysis, California Department of Transportation, 100 S. Main St., Los Angeles, CA 900012, Regular Office Hours 8:00 a.m. to 5:00 p.m., Telephone number 213–897–9116, email carlos_montez@dot.ca.gov. SUPPLEMENTARY INFORMATION: Effective July 1, 2007, the Federal Highway Administration (FHWA) assigned, and the California Department of Transportation (Caltrans) assumed, environmental responsibilities for this project pursuant to 23 U.S.C. 327. Notice is hereby given that the Caltrans, have taken final agency actions subject to 23 U.S.C. 139(l)(1) by issuing licenses, permits, and approvals for the following highway project in the State of California: The proposed project would replace the existing 6th Street Viaduct over the Los Angeles River and the overcrossing, which also spans the US 101 Hollywood Freeway. The purpose of this project is to reduce the vulnerability of the structure in a major earthquake event and resolve design deficiencies. The project will take approximately four years to complete. The FHWA project reference number is 5006 (342). The actions by the Federal agencies, and the laws under which such actions were taken, are described in the Final Environmental Impact Statement (FEIS) for the project, approved on October 5, 2011, in the FHWA Record of Decision (ROD) issued on December 21, 2011, and in other documents in the FHWA project records. The FEIS, ROD, and other project records are available by contacting Caltrans at the addresses provided above. The Caltrans FEIS and ROD can be viewed and downloaded from the project web site at https:// www.dot.ca.gov/dist07/resources/ envdocs/. This notice applies to all Federal agency decisions as of the issuance date of this notice and all laws under which such actions were taken, including but not limited to 1. National Environmental Policy Act (NEPA) 2. Safe, Accountable, Flexible and Efficient, Transportation Equity Act, A Legacy for Users (SAFETEA– LU) 3. MAP 21—Moving Ahead for Progress in the 21st Century E:\FR\FM\07NON1.SGM 07NON1

Agencies

[Federal Register Volume 77, Number 216 (Wednesday, November 7, 2012)]
[Notices]
[Pages 66909-66910]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-27110]


=======================================================================
-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Projects Approved for Consumptive Uses of Water

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: This notice lists the projects approved by rule by the 
Susquehanna River Basin Commission during the period set forth in 
DATES.

DATES: September 1, 2012, through September 30, 2012.

ADDRESSES: Susquehanna River Basin Commission, 1721 North Front Street, 
Harrisburg, PA 17102-2391.

FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel, 
telephone: (717) 238-0423, ext. 306; fax: (717) 238-2436; email: 
rcairo@srbc.net. Regular mail inquiries may be sent to the above 
address.

SUPPLEMENTARY INFORMATION: This notice lists the projects, described 
below, receiving approval for the consumptive use of water pursuant to 
the Commission's approval by rule process set forth in 18 CFR 806.22(f) 
for the time period specified above:

Approvals by Rule Issued Under 18 CFR 806.22(f)

    1. Southwestern Energy Production Company, Pad ID: ENDLESS MOUNTAIN 
RECREATION, ABR-201209001, New Milford Township, Susquehanna County, 
Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date: September 4, 
2012.
    2. Talisman Energy USA Inc., Pad ID: 05 112 Abell G, ABR-201209002, 
Warren Township, Bradford County, Pa.; Consumptive Use of Up to 6.000 
mgd; Approval Date: September 10, 2012.
    3. Atlas Resources, LLC, Pad ID: Logue Pad B, ABR-201209003, Gamble 
Township, Lycoming County, Pa.; Consumptive Use of Up to 4.000 mgd; 
Approval Date: September 11, 2012.
    4. WPX Energy Appalachia, LLC, Pad ID: Beckley Well Pad, ABR-
201209004, Franklin Township, Susquehanna County, Pa.; Consumptive Use 
of Up to 4.000 mgd; Approval Date: September 11, 2012.
    5. XTO Energy Incorporated, Pad ID: West Brown B, ABR-201209005, 
Moreland Township, Lycoming County, Pa.; Consumptive Use of Up to 4.500 
mgd; Approval Date: September 14, 2012.
    6. Southwestern Energy Production Company, Pad ID: WOOSMAN PAD, 
ABR-201209006, New Milford Township, Susquehanna County, Pa.; 
Consumptive Use of Up to 4.999 mgd; Approval Date: September 18, 2012.
    7. Southwestern Energy Production Company, Pad ID: SWOPE PAD, ABR-
201209007, Jackson Township, Susquehanna County, Pa.; Consumptive Use 
of Up to 4.999 mgd; Approval Date: September 18, 2012.
    8. Southwestern Energy Production Company, Pad ID: MULLOY PAD, ABR-
201209008, Jackson Township, Susquehanna County, Pa.; Consumptive Use 
of Up to 4.999 mgd; Approval Date: September 18, 2012.
    9. Southwestern Energy Production Company, Pad ID: MARVIN PAD, ABR-
201209009, Jackson Township, Susquehanna County, Pa.; Consumptive Use 
of Up to 4.999 mgd; Approval Date: September 18, 2012.
    10. Southwestern Energy Production Company, Pad ID: FREITAG PAD, 
ABR-201209010, Jackson Township, Susquehanna County, Pa.; Consumptive 
Use of Up to 4.999 mgd; Approval Date: September 18, 2012.
    11. Chesapeake Appalachia, LLC, Pad ID: Gene, ABR-201209011, 
Overton Township, Bradford County, Pa.; Consumptive Use of Up to 7.500 
mgd; Approval Date: September 24, 2012.
    12. Chesapeake Appalachia, LLC, Pad ID: Yencha, ABR-201209012, 
Monroe Township, Bradford County, Pa.; Consumptive Use of Up to 7.500 
mgd; Approval Date: September 24, 2012.
    13. SWEPI LP, Pad ID: Delaney 651, ABR-201209013, Sullivan 
Township, Tioga County, Pa.; Consumptive Use of Up to 4.000 mgd; 
Approval Date: September 24, 2012.
    14. Chesapeake Appalachia, LLC, Pad ID: Blueberry Hill, ABR-
201209014, Overton Township, Bradford County, Pa.; Consumptive Use of 
Up to 7.500 mgd; Approval Date: September 25, 2012.
    15. Chesapeake Appalachia, LLC, Pad ID: Carr, ABR-201209015, Wilmot 
Township, Bradford County, Pa.; Consumptive Use of Up to 7.500 mgd; 
Approval Date: September 25, 2012.
    16. Talisman Energy USA Inc., Pad ID: 01 099 Storch, ABR-201209016, 
Troy Township, Bradford County, Pa.; Consumptive Use of Up to 6.000 
mgd; Approval Date: September 25, 2012.
    17. Southwestern Energy Production Company, Pad ID: Cooley (Pad 2), 
ABR-201209017, Orwell Township, Bradford County, Pa.; Consumptive Use 
of Up to 4.999 mgd; Approval Date: September 25, 2012.
    18. Southwestern Energy Production Company, Pad ID: Gypsy Hill-
Eastabrook (Pad 5), ABR-201209018, Orwell Township, Bradford County, 
Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date: September 25, 
2012.
    19. Southwestern Energy Production Company, Pad ID: Rabago Birk 
(Pad 10), ABR-201209019, Herrick and Standing Stone Townships, Bradford 
County, Pa.; Consumptive Use of Up to 4.999 mgd; Approval Date: 
September 25, 2012.
    20. WPX Energy Appalachia, LLC, Pad ID: Wootton East Well Pad, ABR-
201209020, Liberty Township, Susquehanna County, Pa.; Consumptive

[[Page 66910]]

Use of Up to 4.000 mgd; Approval Date: September 25, 2012.
    21. Chief Oil & Gas LLC, Pad ID: Romisoukas Drilling Pad, ABR-
201209021, Canton Township, Bradford County, Pa.; Consumptive Use of Up 
to 2.000 mgd; Approval Date: September 25, 2012.
    22. WPX Energy Appalachia, LLC, Pad ID: McLallen Well Pad, ABR-
201209022, Choconut Township, Susquehanna County, Pa.; Consumptive Use 
of Up to 4.000 mgd; Approval Date: September 25, 2012.
    23. WPX Energy Appalachia, LLC, Pad ID: Mordovancey Well Pad, ABR-
201209023, Choconut Township, Susquehanna County, Pa.; Consumptive Use 
of Up to 4.000 mgd; Approval Date: September 25, 2012.
    24. Talisman Energy USA Inc., Pad ID: 02 101 Olson, ABR-201209024, 
Hamilton Township, Tioga County, Pa.; Consumptive Use of Up to 6.000 
mgd; Approval Date: September 27, 2012.

    Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 
806, 807, and 808.

    Dated: October 22, 2012.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2012-27110 Filed 11-6-12; 8:45 am]
BILLING CODE 7040-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.