Actions Taken at September 20, 2012, Meeting, 66214-66215 [2012-26877]

Download as PDF 66214 Federal Register / Vol. 77, No. 213 / Friday, November 2, 2012 / Notices For the Commission, by the Division of Trading and Markets, pursuant to delegated authority.7 Kevin M. O’Neill, Deputy Secretary. [FR Doc. 2012–26861 Filed 11–1–12; 8:45 am] BILLING CODE 8011–01–P SMALL BUSINESS ADMINISTRATION [Disaster Declaration #13348 and #13349] Massachusetts Disaster # MA–00049 U.S. Small Business Administration. ACTION: Notice. AGENCY: This is a notice of an Administrative declaration of a disaster for the Commonwealth of Massachusetts dated 10/22/2012. Incident: Severe Storms and Flooding. Incident Period: 09/05/2012. Effective Date: 10/22/2012. Physical Loan Application Deadline Date: 12/21/2012. Economic Injury (EIDL) Loan Application Deadline Date: 07/22/2013. ADDRESSES: Submit completed loan applications to: U.S. Small Business Administration, Processing and Disbursement Center, 14925 Kingsport Road, Fort Worth, TX 76155. FOR FURTHER INFORMATION CONTACT: A. Escobar, Office of Disaster Assistance, U.S. Small Business Administration, 409 3rd Street SW., Suite 6050, Washington, DC 20416. SUPPLEMENTARY INFORMATION: Notice is hereby given that as a result of the Administrator’s disaster declaration, applications for disaster loans may be filed at the address listed above or other locally announced locations. The following areas have been determined to be adversely affected by the disaster: Primary Counties: Bristol. Contiguous Counties: Massachusetts: Norfolk. Rhode Island: Plymouth/Newport, Bristol, Providence. The Interest Rates are: emcdonald on DSK67QTVN1PROD with NOTICES SUMMARY: For Physical Damage: Homeowners With Credit Available Elsewhere ...................... Homeowners Without Credit Available Elsewhere .............. Businesses With Credit Available Elsewhere ...................... Businesses Without Credit Available Elsewhere .............. Non-Profit Organizations With Credit Available Elsewhere ... 7 17 CFR 200.30–3(a)(12). VerDate Mar<15>2010 12:56 Nov 01, 2012 Percent Non-Profit Organizations Without Credit Available Elsewhere ..................................... For Economic Injury: Businesses & Small Agricultural Cooperatives Without Credit Available Elsewhere .............. Non-Profit Organizations Without Credit Available Elsewhere ..................................... 3.000 4.000 3.000 The number assigned to this disaster for physical damage is 13348 6 and for economic injury is 13349 0. The States which received an EIDL Declaration # are Massachusetts, Rhode Island. (Catalog of Federal Domestic Assistance Numbers 59002 and 59008) Dated: October 22, 2012. Karen G. Mills, Administrator. [FR Doc. 2012–26846 Filed 11–1–12; 8:45 am] BILLING CODE 8025–01–P SUSQUEHANNA RIVER BASIN COMMISSION Actions Taken at September 20, 2012, Meeting Susquehanna River Basin Commission. ACTION: Notice. AGENCY: As part of its regular business meeting held on September 20, 2012, in Harrisburg, Pennsylvania, the Commission took the following actions: approved or tabled the applications of certain water resources projects; and took additional actions, as set forth in the Supplementary Information below. DATES: September 20, 2012 ADDRESSES: Susquehanna River Basin Commission, 1721 N. Front Street, Harrisburg, PA 17102–2391. FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel, telephone: (717) 238–0423, ext. 306; fax: (717) 238–2436; email: rcairo@srbc.net. Regular mail inquiries may be sent to Percent the above address. See also Commission Web site at www.srbc.net. SUPPLEMENTARY INFORMATION: In 3.375 addition to its related actions on projects identified in the summary 1.688 above and the listings below, the following items were also presented or 6.000 acted on at the business meeting: (1) 4.000 Approved/ratified grants involving the Chesapeake Bay Nutrient Monitoring 3.125 Program, the development of Total Maximum Daily Loads (TMDLs) studies, and the Public Water System Assistance Jkt 229001 SUMMARY: PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 Initiative Project with the PA Dept. of Environmental Protection; (2) amended the Water Quality Protection and Pollution Prevention Grant (known as the 106 grant); (3) authorized expansion of the SRBC Remote Water Quality Monitoring Network; (4) approved two listing agreements with Latus Commercial Realty for sale of the current headquarters building and leasing of space in the new headquarters building now under construction; (5) approved the partial waiver of application fees when a project sponsor withdraws an application prior to SRBC beginning its technical review; (6) approved a request by Talon Holdings, LLC for a conditional transfer extension related to the Hawk Valley Golf Course, Lancaster County, Pa.; and (7) approved issuance of a corrective docket to Nature’s Way Purewater Systems, Inc. to correct an error misidentifying a project feature for which monitoring is required. Project Applications Approved The Commission approved the following project applications: 1. Project Sponsor and Facility: Borough of Adamstown, Adamstown Borough, Lancaster County, Pa. Renewal of groundwater withdrawal of up to 0.069 mgd (30-day average) from Well 4 (Docket No. 19801104). 2. Project Sponsor and Facility: Anadarko E&P Company LP (Second Fork Larrys Creek), Mifflin Township, Lycoming County, Pa. Surface water withdrawal of up to 0.200 mgd (peak day). 3. Project Sponsor and Facility: Cabot Oil & Gas Corporation (Susquehanna River), Susquehanna Depot Borough, Susquehanna County, Pa. Renewal of surface water withdrawal of up to 1.500 mgd (peak day) (Docket No. 20080908). 4. Project Sponsor and Facility: Cabot Oil & Gas Corporation (Susquehanna River), Great Bend Township, Susquehanna County, Pa. Renewal of surface water withdrawal of up to 2.000 mgd (peak day) (Docket No. 20080905). 5. Project Sponsor and Facility: Carrizo (Marcellus), LLC (Muddy Run), Gulich Township, Clearfield County, Pa. Surface water withdrawal of up to 0.720 mgd (peak day). 6. Project Sponsor and Facility: East Hempfield Township Municipal Authority, East Hempfield Township, Lancaster County, Pa. Surface water withdrawal of up to 0.070 mgd (30-day average) from S–1 (Baker Spring); and Groundwater withdrawal of up to 0.268 mgd (30-day average) from Well W–1, 0.673 mgd (30-day average) from Well W–2, 0.264 mgd (30-day average) from Well W–3, 0.321 mgd (30-day average) E:\FR\FM\02NON1.SGM 02NON1 emcdonald on DSK67QTVN1PROD with NOTICES Federal Register / Vol. 77, No. 213 / Friday, November 2, 2012 / Notices from Well W–4, and renewal of groundwater withdrawal of up to 0.632 mgd (30-day average) from Well W–5 (Docket No. 19810203). 7. Project Sponsor and Facility: Enerplus Resources (USA) Corporation (West Branch Susquehanna River), East Keating Township, Clinton County, Pa. Surface water withdrawal of up to 2.000 mgd (peak day). 8. Project Sponsor and Facility: EXCO Resources (PA), LLC (Larrys Creek), Mifflin Township, Lycoming County, Pa. Renewal of surface water withdrawal with modification, for a total of 0.200 mgd (peak day) (Docket No. 20080936). 9. Project Sponsor and Facility: Forest Springs Water Company, Wayne Township, Schuylkill County, Pa. Groundwater withdrawal of up to 0.075 mgd (30-day average) from Borehole BH–1, and modification to consumptive water use approval removing previous sources Spring 1 and Spring 2 and adding new source Borehole BH–1 (Docket No. 20010206). 10. Project Sponsor: Hydro RecoveryAntrim LP. Project Facility: Antrim Treatment Plant, Duncan Township, Tioga County, Pa. Modification to project features and to increase surface water withdrawal by an additional 1.152 mgd, for a total of 1.872 mgd (peak day) (Docket No. 20090902). 11. Project Sponsor and Facility: Keystone Clearwater Solutions, LLC (Lycoming Creek), Lewis Township, Lycoming County, Pa. Modification to increase surface water withdrawal, for a total of 2.125 mgd (peak day) (Docket No. 20110616). 12. Project Sponsor and Facility: Keystone Clearwater Solutions, LLC (Moshannon Creek), Snow Shoe Township, Centre County, Pa. Renewal of surface water withdrawal of up to 1.000 mgd (peak day) (Docket No. 20080946). 13. Project Sponsor and Facility: Keystone Clearwater Solutions, LLC (West Branch Susquehanna River), Goshen Township, Clearfield County, Pa. Renewal of surface water withdrawal of up to 1.000 mgd (peak day) (Docket No. 20080944). 14. Project Sponsor and Facility: Roaring Spring Water—Division of Roaring Spring Blank Book, Roaring Spring Borough, Blair County, Pa. Modification to increase consumptive water use by an additional 0.125 mgd, for a total of 0.255 mgd (peak day) (Docket No. 20120309), and to increase surface water withdrawal by an additional 0.131 mgd, for a total of 0.302 mgd (peak day) (Docket No. 20120309). 15. Project Sponsor and Facility: Talisman Energy USA Inc. VerDate Mar<15>2010 12:56 Nov 01, 2012 Jkt 229001 (Susquehanna River), Sheshequin Township, Bradford County, Pa. Renewal of surface water withdrawal of up to 1.500 mgd (peak day) (Docket No. 20080909). Project Applications Tabled The following project applications were tabled by the Commission: 1. Project Sponsor and Facility: Caernarvon Township Authority, Caernarvon Township, Berks County, Pa. Application for renewal of groundwater withdrawal of up to 0.035 mgd (30-day average) from Well 6 (Docket No. 19820912). 2. Project Sponsor and Facility: EQT Production Company (Pine Creek), Porter Township, Lycoming County, Pa. Application for surface water withdrawal of up to 1.000 mgd (peak day). 3. Project Sponsor and Facility: Falling Springs Water Works, Inc. (Falling Springs Reservoir), Ransom Township, Lackawanna County, Pa. Application for surface water withdrawal of up to 0.800 mgd (peak day). 4. Project Sponsor and Facility: Gaberseck Brothers (Odin Pond 2), Keating Township, Potter County, Pa. Application for surface water withdrawal of up to 0.249 mgd (peak day). 5. Project Sponsor and Facility: Houtzdale Municipal Authority (Beccaria Springs), Gulich Township, Clearfield County, Pa. Application for surface water withdrawal of up to 10.000 mgd (peak day). 6. Project Sponsor and Facility: Southwestern Energy Production Company (Middle Lake), New Milford Township, Susquehanna County, Pa. Application for surface water withdrawal of up to 0.720 mgd (peak day). Authority: Pub. L. 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808. Dated: October 19, 2012. Thomas W. Beauduy, Deputy Executive Director. [FR Doc. 2012–26877 Filed 11–1–12; 8:45 am] BILLING CODE 7040–01–P DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on the Tappan Zee Hudson River Crossing Project in New York Correction In notice document 2012–26799, appearing on page 65929 in the issue of PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 66215 Wednesday, October 31, 2012, make the following correction: On page 65929, in the first column, under the DATES heading, in the seventh line, ‘‘[Insert date 150 days after publication in the Federal Register]’’ should read ‘‘March 30, 2013’’. [FR Doc. C1–2012–26799 Filed 11–1–12; 8:45 am] BILLING CODE 1505–01–D DEPARTMENT OF TRANSPORTATION Federal Highway Administration Limitation of Claims Notice for Judicial Review of Actions by FHWA and Other Federal Agencies in the City of Cincinnati, Hamilton County, OH and the City of Covington, Kenton County, KY Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on claims for judicial review of actions by FHWA and other federal agencies. AGENCY: By this notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). The actions relate to a proposed project to improve the Brent Spence Bridge over the Ohio River, as well as improvements to Interstate Routes 71 and 75 and interchanges in the City of Cincinnati, Hamilton County, State of Ohio and City of Covington, Kenton County, Commonwealth of Kentucky, including a new bridge over the Ohio River. This notice covers those Federal agency actions to grant licenses, permits, and approvals for the project. DATES: A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before May 1, 2013. If the Federal law that authorizes judicial review of a claim provides a time period of less than 180 days for filing such claim, then that shorter time period still applies. FOR FURTHER INFORMATION CONTACT: Noel F. Mehlo Jr., Environmental Program Manager, Federal Highway Administration, 200 North High Street, Room 328, Columbus, Ohio 43215, Telephone: (614) 280–6896; or Stefan Spinosa, PE, Ohio Department of Transportation (ODOT), 505 South State Route 741, Lebanon, Ohio 45036, Telephone: (513) 933–6639. SUPPLEMENTARY INFORMATION: Notice is hereby given that the FHWA and other Federal agencies including, but not limited to; the United States Coast Guard, United States Army Corps of Engineers, United States Fish and Wildlife Service, Advisory Council on SUMMARY: E:\FR\FM\02NON1.SGM 02NON1

Agencies

[Federal Register Volume 77, Number 213 (Friday, November 2, 2012)]
[Notices]
[Pages 66214-66215]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-26877]


=======================================================================
-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Actions Taken at September 20, 2012, Meeting

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: As part of its regular business meeting held on September 20, 
2012, in Harrisburg, Pennsylvania, the Commission took the following 
actions: approved or tabled the applications of certain water resources 
projects; and took additional actions, as set forth in the 
Supplementary Information below.

DATES: September 20, 2012

ADDRESSES: Susquehanna River Basin Commission, 1721 N. Front Street, 
Harrisburg, PA 17102-2391.

FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel, 
telephone: (717) 238-0423, ext. 306; fax: (717) 238-2436; email: 
rcairo@srbc.net. Regular mail inquiries may be sent to the above 
address. See also Commission Web site at www.srbc.net.

SUPPLEMENTARY INFORMATION: In addition to its related actions on 
projects identified in the summary above and the listings below, the 
following items were also presented or acted on at the business 
meeting: (1) Approved/ratified grants involving the Chesapeake Bay 
Nutrient Monitoring Program, the development of Total Maximum Daily 
Loads (TMDLs) studies, and the Public Water System Assistance 
Initiative Project with the PA Dept. of Environmental Protection; (2) 
amended the Water Quality Protection and Pollution Prevention Grant 
(known as the 106 grant); (3) authorized expansion of the SRBC Remote 
Water Quality Monitoring Network; (4) approved two listing agreements 
with Latus Commercial Realty for sale of the current headquarters 
building and leasing of space in the new headquarters building now 
under construction; (5) approved the partial waiver of application fees 
when a project sponsor withdraws an application prior to SRBC beginning 
its technical review; (6) approved a request by Talon Holdings, LLC for 
a conditional transfer extension related to the Hawk Valley Golf 
Course, Lancaster County, Pa.; and (7) approved issuance of a 
corrective docket to Nature's Way Purewater Systems, Inc. to correct an 
error misidentifying a project feature for which monitoring is 
required.

Project Applications Approved

    The Commission approved the following project applications:
    1. Project Sponsor and Facility: Borough of Adamstown, Adamstown 
Borough, Lancaster County, Pa. Renewal of groundwater withdrawal of up 
to 0.069 mgd (30-day average) from Well 4 (Docket No. 19801104).
    2. Project Sponsor and Facility: Anadarko E&P Company LP (Second 
Fork Larrys Creek), Mifflin Township, Lycoming County, Pa. Surface 
water withdrawal of up to 0.200 mgd (peak day).
    3. Project Sponsor and Facility: Cabot Oil & Gas Corporation 
(Susquehanna River), Susquehanna Depot Borough, Susquehanna County, Pa. 
Renewal of surface water withdrawal of up to 1.500 mgd (peak day) 
(Docket No. 20080908).
    4. Project Sponsor and Facility: Cabot Oil & Gas Corporation 
(Susquehanna River), Great Bend Township, Susquehanna County, Pa. 
Renewal of surface water withdrawal of up to 2.000 mgd (peak day) 
(Docket No. 20080905).
    5. Project Sponsor and Facility: Carrizo (Marcellus), LLC (Muddy 
Run), Gulich Township, Clearfield County, Pa. Surface water withdrawal 
of up to 0.720 mgd (peak day).
    6. Project Sponsor and Facility: East Hempfield Township Municipal 
Authority, East Hempfield Township, Lancaster County, Pa. Surface water 
withdrawal of up to 0.070 mgd (30-day average) from S-1 (Baker Spring); 
and Groundwater withdrawal of up to 0.268 mgd (30-day average) from 
Well W-1, 0.673 mgd (30-day average) from Well W-2, 0.264 mgd (30-day 
average) from Well W-3, 0.321 mgd (30-day average)

[[Page 66215]]

from Well W-4, and renewal of groundwater withdrawal of up to 0.632 mgd 
(30-day average) from Well W-5 (Docket No. 19810203).
    7. Project Sponsor and Facility: Enerplus Resources (USA) 
Corporation (West Branch Susquehanna River), East Keating Township, 
Clinton County, Pa. Surface water withdrawal of up to 2.000 mgd (peak 
day).
    8. Project Sponsor and Facility: EXCO Resources (PA), LLC (Larrys 
Creek), Mifflin Township, Lycoming County, Pa. Renewal of surface water 
withdrawal with modification, for a total of 0.200 mgd (peak day) 
(Docket No. 20080936).
    9. Project Sponsor and Facility: Forest Springs Water Company, 
Wayne Township, Schuylkill County, Pa. Groundwater withdrawal of up to 
0.075 mgd (30-day average) from Borehole BH-1, and modification to 
consumptive water use approval removing previous sources Spring 1 and 
Spring 2 and adding new source Borehole BH-1 (Docket No. 20010206).
    10. Project Sponsor: Hydro Recovery-Antrim LP. Project Facility: 
Antrim Treatment Plant, Duncan Township, Tioga County, Pa. Modification 
to project features and to increase surface water withdrawal by an 
additional 1.152 mgd, for a total of 1.872 mgd (peak day) (Docket No. 
20090902).
    11. Project Sponsor and Facility: Keystone Clearwater Solutions, 
LLC (Lycoming Creek), Lewis Township, Lycoming County, Pa. Modification 
to increase surface water withdrawal, for a total of 2.125 mgd (peak 
day) (Docket No. 20110616).
    12. Project Sponsor and Facility: Keystone Clearwater Solutions, 
LLC (Moshannon Creek), Snow Shoe Township, Centre County, Pa. Renewal 
of surface water withdrawal of up to 1.000 mgd (peak day) (Docket No. 
20080946).
    13. Project Sponsor and Facility: Keystone Clearwater Solutions, 
LLC (West Branch Susquehanna River), Goshen Township, Clearfield 
County, Pa. Renewal of surface water withdrawal of up to 1.000 mgd 
(peak day) (Docket No. 20080944).
    14. Project Sponsor and Facility: Roaring Spring Water--Division of 
Roaring Spring Blank Book, Roaring Spring Borough, Blair County, Pa. 
Modification to increase consumptive water use by an additional 0.125 
mgd, for a total of 0.255 mgd (peak day) (Docket No. 20120309), and to 
increase surface water withdrawal by an additional 0.131 mgd, for a 
total of 0.302 mgd (peak day) (Docket No. 20120309).
    15. Project Sponsor and Facility: Talisman Energy USA Inc. 
(Susquehanna River), Sheshequin Township, Bradford County, Pa. Renewal 
of surface water withdrawal of up to 1.500 mgd (peak day) (Docket No. 
20080909).

Project Applications Tabled

    The following project applications were tabled by the Commission:
    1. Project Sponsor and Facility: Caernarvon Township Authority, 
Caernarvon Township, Berks County, Pa. Application for renewal of 
groundwater withdrawal of up to 0.035 mgd (30-day average) from Well 6 
(Docket No. 19820912).
    2. Project Sponsor and Facility: EQT Production Company (Pine 
Creek), Porter Township, Lycoming County, Pa. Application for surface 
water withdrawal of up to 1.000 mgd (peak day).
    3. Project Sponsor and Facility: Falling Springs Water Works, Inc. 
(Falling Springs Reservoir), Ransom Township, Lackawanna County, Pa. 
Application for surface water withdrawal of up to 0.800 mgd (peak day).
    4. Project Sponsor and Facility: Gaberseck Brothers (Odin Pond 2), 
Keating Township, Potter County, Pa. Application for surface water 
withdrawal of up to 0.249 mgd (peak day).
    5. Project Sponsor and Facility: Houtzdale Municipal Authority 
(Beccaria Springs), Gulich Township, Clearfield County, Pa. Application 
for surface water withdrawal of up to 10.000 mgd (peak day).
    6. Project Sponsor and Facility: Southwestern Energy Production 
Company (Middle Lake), New Milford Township, Susquehanna County, Pa. 
Application for surface water withdrawal of up to 0.720 mgd (peak day).

    Authority:  Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 
806, 807, and 808.

    Dated: October 19, 2012.
Thomas W. Beauduy,
Deputy Executive Director.
[FR Doc. 2012-26877 Filed 11-1-12; 8:45 am]
BILLING CODE 7040-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.