Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC, National Enrichment Facility, Eunice, NM, Prior to the Commencement of Operations, 65729-65730 [2012-26630]
Download as PDF
Federal Register / Vol. 77, No. 210 / Tuesday, October 30, 2012 / Notices
‘‘Guidelines for Preparing and
Reviewing Applications for the
Licensing of Non-Power Reactors:
Format and Content’’ (ADAMS
Accession No. ML111160058), and
NUREG–1537, Part 2, ‘‘Guidelines for
Preparing and Reviewing Applications
for the Licensing of Non-Power
Reactors: Standard Review Plan and
Acceptance Criteria’’ (ADAMS
Accession No. ML111810010). On April
10, 2012 (77 FR 21592), the NRC
published for public comment Chapters
7–18 of Part 1 of the draft ISG, ADAMS
Accession No. ML111570224, and
Chapters 7–18 of Part 2 of the draft ISG,
ADAMS Accession No. ML111160065.
The NRC received 75 comments on the
draft ISG, ADAMS Accession Nos.
ML11325A120, ML11325A121,
ML11325A122, ML12136A120, and
ML12135A181. The details of the NRC’s
disposition of the comments are
available at ADAMS Accession No.
ML12156A061. The NRC staff
incorporated the comments in the final
ISG, as appropriate.
Congressional Review Act: In
accordance with the Congressional
Review Act, the NRC has determined
that this action is not a major rule and
has verified this determination with the
Office of Information and Regulatory
Affairs of the Office of Management and
Budget.
ADDRESSES: The NRC maintains
ADAMS, which provides text and image
files of the NRC’s public documents.
Publicly available documents created or
received at the NRC are available online
in the NRC Library at https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS should contact the NRC’s
Public Document Room reference staff
at 1–800–397–4209, 301–415–4737, or
by email at pdr.resource@nrc.gov.
FOR FURTHER INFORMATION CONTACT: Mr.
Marcus Voth, Project Manager, Research
and Test Reactor Licensing Branch,
Division of Policy and Rulemaking,
Office of Nuclear Reactor Regulation,
U.S. Nuclear Regulatory Commission,
Washington, DC, 20555–0001; telephone
at 301–415–1210 or email at
Marcus.Voth@nrc.gov.
The NRC
posts its issued staff guidance on the
NRC external Web page (https://
www.nrc.gov/reading-rm/doccollections/isg/).
wreier-aviles on DSK7SPTVN1PROD with NOTICES
SUPPLEMENTARY INFORMATION:
Dated at Rockville, Maryland, this 17 day
of October 2012.
For the Nuclear Regulatory Commission,
Linh N. Tran,
Acting Chief, Research and Test Reactor
Licensing Branch, Division of Policy and
Rulemaking, Office of Nuclear Reactor
Regulation.
[FR Doc. 2012–26644 Filed 10–29–12; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 70–3103; NRC–2010–0264]
Uranium Enrichment Fuel Cycle
Facility Inspection Reports Regarding
Louisiana Energy Services LLC,
National Enrichment Facility, Eunice,
NM, Prior to the Commencement of
Operations
Nuclear Regulatory
Commission.
ACTION: Notice of availability.
AGENCY:
FOR FURTHER INFORMATION CONTACT:
Michael Raddatz, Project Manager,
Office of Nuclear Material Safety and
Safeguards, U.S. Nuclear Regulatory
Commission, Rockville, Maryland
20852; telephone: 301–492–3108; or
email to: Michael.Raddatz@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The U.S. Nuclear Regulatory
Commission (NRC or the Commission)
has conducted inspections of the
Louisiana Energy Services (LES), LLC,
National Enrichment Facility in Eunice,
New Mexico, and has verified that
cascades numbered 1.9, 1.10, 1.11, 1.12,
2.2, 2.3, 2.5, 2.6, 2.7, 2.8, 2.10, 2.11,
2.12, and 3.1 of the facility have been
constructed in accordance with the
requirements of the approved license.
The NRC staff has prepared inspection
reports documenting its findings in
accordance with the requirements of the
NRC Inspection Manual. As a result of
these inspections, on March 14, 2012,
the Commission authorized the licensee
to start operation of cascades numbered
2.2, 2.3, and 2.5. On March 19, 2012, the
Commission authorized the licensee to
start operation of cascade number 2.6.
On March 27, 2012, the Commission
authorized the licensee to start
operation of cascades numbered 2.7 and
2.8. On May 24, 2012, the Commission
authorized the licensee to start
operation of cascade number 1.9. On
May 31, 2012, the Commission
authorized the licensee to start
operation of cascade number 1.10. On
June 27, 2012, the Commission
authorized the licensee to start
operation of cascade number 1.11. On
July 9, 2012 (clarified by letter July 16,
2012), the Commission authorized the
licensee to start operation of cascade
number 2.12. On August 9, 2012, the
Commission authorized the licensee to
start operation of cascade number 1.12.
On August 14, 2012, the Commission
authorized the licensee to start
operation of cascade number 3.1. On
August 24, 2012, the Commission
authorized the licensee to start
operation of cascade number 2.11.
Finally, on September 14, 2012, the
Commission authorized the licensee to
start operation of cascade number 2.10.
The publication of this Notice satisfies
the requirements of Title 10 of the Code
of Federal Regulations (10 CFR) 70.32
(k) and section 193(c) of the Atomic
Energy Act of 1954, as amended.
The introduction of uranium
hexafluoride into any module of the
National Enrichment Facility is not
permitted until the Commission
completes an operational readiness and
management measures verification
review to verify that management
measures that ensure compliance with
the performance requirements of 10 CFR
70.61 have been implemented and
confirms that the facility has been
constructed in accordance with the
license and will be operated safely.
Subsequent operational readiness and
management measures verification
reviews will continue throughout the
various phases of plant construction
and, upon completion of these
subsequent phases, additional notices
will be posted to verify that the phase
in question has been constructed in
accordance with the license and to
acknowledge licensee readiness for
operations.
II. Further Information
Documents related to this action are
available online at the NRC Library at
https://www.nrc.gov/reading-rm/
adams.html. From this site, you can
access the NRC’s Agencywide
Documents Access and Management
System (ADAMS), which provides text
and image files of NRC’s public
documents. The ADAMS accession
numbers for the documents related to
this document are:
ADAMS
accession No.
Inspection report numbers
Date
70–3103/2006–001 ....................................................................
January 19, 2007 .....................................................................
VerDate Mar<15>2010
13:17 Oct 29, 2012
Jkt 229001
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
65729
E:\FR\FM\30OCN1.SGM
30OCN1
ML070190661.
65730
Federal Register / Vol. 77, No. 210 / Tuesday, October 30, 2012 / Notices
Inspection report numbers
70–3103/2007–001
70–3103/2007–002
70–3103/2007–003
70–3103/2007–004
70–3103/2008–001
70–3103/2008–002
70–3103/2008–003
70–3103/2008–004
70–3103/2008–006
70–3103/2009–001
70–3103/2009–002
70–3103/2009–003
70–3103/2009–004
70–3103/2009–006
70–3103/2010–005
70–3103/2010–012
70–3103/2011–002
70–3103/2011–003
70–3103/2011–004
70–3103/2012–002
70–3103/2012–003
70–3103/2012–004
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
....................................................................
If you do not have access to ADAMS
or if there are problems in accessing the
documents located in ADAMS, contact
the NRC Public Document Room (PDR)
Reference staff at 1–800–397–4209, 301–
415–4737, or by email to
pdr.resource@nrc.gov.
These documents may also be viewed
electronically on the public computers
located at the NRC’s PDR, O 1 F21, One
White Flint North, 11555 Rockville
Pike, Rockville, MD 20852. The PDR
reproduction contractor will copy
documents for a fee.
Dated at Rockville, Maryland this 19th day
of October 2012.
For the U.S. Nuclear Regulatory
Commission
Brian W. Smith,
Chief, Uranium Enrichment Branch, Division
of Fuel Cycle Safety and Safeguards, Office
of Nuclear Material Safety and Safeguards.
[FR Doc. 2012–26630 Filed 10–29–12; 8:45 am]
BILLING CODE 7590–01–P
SECURITIES AND EXCHANGE
COMMISSION
wreier-aviles on DSK7SPTVN1PROD with NOTICES
Sunshine Act Meeting Notice
Notice is hereby given, pursuant to
the provisions of the Government in the
Sunshine Act, Public Law 94–409, that
the Securities and Exchange
Commission will hold a Closed Meeting
on Thursday, November 1, 2012 at 2:00
p.m.
Commissioners, Counsel to the
Commissioners, the Secretary to the
Commission, and recording secretaries
will attend the Closed Meeting. Certain
staff members who have an interest in
the matters also may be present.
VerDate Mar<15>2010
13:17 Oct 29, 2012
Jkt 229001
ADAMS
accession No.
Date
May 24, 2007 ...........................................................................
August 16, 2007 .......................................................................
November 2, 2007 ...................................................................
March 7, 2008 ..........................................................................
April 24, 2008 ...........................................................................
July 10, 2008 ............................................................................
October 30, 2008 .....................................................................
December 19, 2008 .................................................................
March 20, 2009 ........................................................................
March 26, 2009 ........................................................................
June 26, 2009 ..........................................................................
September 30, 2009 ................................................................
December 17, 2009 .................................................................
October 8, 2009 .......................................................................
March 26, 2010 ........................................................................
July 21, 2010 ............................................................................
April 29, 2011 ...........................................................................
July 26, 2011 ............................................................................
October 28, 2011 .....................................................................
April 30, 2012 ...........................................................................
July 6, 2012 ..............................................................................
...................................................................................................
The General Counsel of the
Commission, or his designee, has
certified that, in his opinion, one or
more of the exemptions set forth in 5
U.S.C. 552b(c)(3), (5), (7), 9(B) and (10)
and 17 CFR 200.402(a)(3), (5), (7), 9(ii)
and (10), permit consideration of the
scheduled matters at the Closed
Meeting.
Commissioner Walter, as duty officer,
voted to consider the items listed for the
Closed Meeting in a closed session.
The subject matter of the Closed
Meeting scheduled for Thursday,
November 1, 2012 will be:
Institution and settlement of injunctive
actions;
Institution and settlement of
administrative proceedings;
Other matters relating to enforcement
proceedings.
At times, changes in Commission
priorities require alterations in the
scheduling of meeting items.
For further information and to
ascertain what, if any, matters have been
added, deleted or postponed, please
contact:
The Office of the Secretary at (202)
551–5400.
Dated: October 25, 2012.
Elizabeth M. Murphy,
Secretary.
[FR Doc. 2012–26715 Filed 10–26–12; 11:15 am]
BILLING CODE 8011–01–P
PO 00000
SECURITIES AND EXCHANGE
COMMISSION
[Release No. 34–68093; File No. SR–CME–
2012–42]
Self-Regulatory Organizations;
Chicago Mercantile Exchange Inc.;
Notice of Filing of Proposed Rule
Change Regarding the Valuation of
Securities on Deposit
October 24, 2012.
Pursuant to Section 19(b)(1) of the
Securities Exchange Act of 1934
(‘‘Act’’),1 and Rule 19b–4 thereunder,2
notice is hereby given that on October
10, 2012, Chicago Mercantile Exchange
Inc. (‘‘CME’’) filed with the Securities
and Exchange Commission
(‘‘Commission’’) the proposed rule
change as described in Items I, II and III
below, which Items have been prepared
primarily by CME. The Commission is
publishing this notice to solicit
comments on the proposed rule change
from interested persons.
I. Self-Regulatory Organization’s
Statement of the Terms of Substance of
the Proposed Rule Change
CME is proposing to make certain
changes to the way CME values
securities on deposit. The text of the
proposed changes is available on the
CME’s Web site at https://
www.cmegroup.com, at the principal
office of CME, and at the Commission’s
Public Reference Room.
1 15
2 17
Frm 00069
Fmt 4703
Sfmt 4703
ML071440430.
ML072280647.
ML073060571.
ML080670475.
ML081160345.
ML081930118.
ML083040618.
ML083540709.
ML090790642.
ML090850669.
ML091770643.
ML092730612.
ML093511013.
ML092820188.
ML100850424.
ML102020385.
ML111190268.
ML112070634.
ML11301A218.
ML12121A579.
ML12188A105.
Pending.
E:\FR\FM\30OCN1.SGM
U.S.C. 78s(b)(1).
CFR 240.19b–4.
30OCN1
Agencies
[Federal Register Volume 77, Number 210 (Tuesday, October 30, 2012)]
[Notices]
[Pages 65729-65730]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-26630]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 70-3103; NRC-2010-0264]
Uranium Enrichment Fuel Cycle Facility Inspection Reports
Regarding Louisiana Energy Services LLC, National Enrichment Facility,
Eunice, NM, Prior to the Commencement of Operations
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of availability.
-----------------------------------------------------------------------
FOR FURTHER INFORMATION CONTACT: Michael Raddatz, Project Manager,
Office of Nuclear Material Safety and Safeguards, U.S. Nuclear
Regulatory Commission, Rockville, Maryland 20852; telephone: 301-492-
3108; or email to: Michael.Raddatz@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The U.S. Nuclear Regulatory Commission (NRC or the Commission) has
conducted inspections of the Louisiana Energy Services (LES), LLC,
National Enrichment Facility in Eunice, New Mexico, and has verified
that cascades numbered 1.9, 1.10, 1.11, 1.12, 2.2, 2.3, 2.5, 2.6, 2.7,
2.8, 2.10, 2.11, 2.12, and 3.1 of the facility have been constructed in
accordance with the requirements of the approved license. The NRC staff
has prepared inspection reports documenting its findings in accordance
with the requirements of the NRC Inspection Manual. As a result of
these inspections, on March 14, 2012, the Commission authorized the
licensee to start operation of cascades numbered 2.2, 2.3, and 2.5. On
March 19, 2012, the Commission authorized the licensee to start
operation of cascade number 2.6. On March 27, 2012, the Commission
authorized the licensee to start operation of cascades numbered 2.7 and
2.8. On May 24, 2012, the Commission authorized the licensee to start
operation of cascade number 1.9. On May 31, 2012, the Commission
authorized the licensee to start operation of cascade number 1.10. On
June 27, 2012, the Commission authorized the licensee to start
operation of cascade number 1.11. On July 9, 2012 (clarified by letter
July 16, 2012), the Commission authorized the licensee to start
operation of cascade number 2.12. On August 9, 2012, the Commission
authorized the licensee to start operation of cascade number 1.12. On
August 14, 2012, the Commission authorized the licensee to start
operation of cascade number 3.1. On August 24, 2012, the Commission
authorized the licensee to start operation of cascade number 2.11.
Finally, on September 14, 2012, the Commission authorized the licensee
to start operation of cascade number 2.10. The publication of this
Notice satisfies the requirements of Title 10 of the Code of Federal
Regulations (10 CFR) 70.32 (k) and section 193(c) of the Atomic Energy
Act of 1954, as amended.
The introduction of uranium hexafluoride into any module of the
National Enrichment Facility is not permitted until the Commission
completes an operational readiness and management measures verification
review to verify that management measures that ensure compliance with
the performance requirements of 10 CFR 70.61 have been implemented and
confirms that the facility has been constructed in accordance with the
license and will be operated safely. Subsequent operational readiness
and management measures verification reviews will continue throughout
the various phases of plant construction and, upon completion of these
subsequent phases, additional notices will be posted to verify that the
phase in question has been constructed in accordance with the license
and to acknowledge licensee readiness for operations.
II. Further Information
Documents related to this action are available online at the NRC
Library at https://www.nrc.gov/reading-rm/adams.html. From this site,
you can access the NRC's Agencywide Documents Access and Management
System (ADAMS), which provides text and image files of NRC's public
documents. The ADAMS accession numbers for the documents related to
this document are:
------------------------------------------------------------------------
Inspection report numbers Date ADAMS accession No.
------------------------------------------------------------------------
70-3103/2006-001............ January 19, 2007.... ML070190661.
[[Page 65730]]
70-3103/2007-001............ May 24, 2007........ ML071440430.
70-3103/2007-002............ August 16, 2007..... ML072280647.
70-3103/2007-003............ November 2, 2007.... ML073060571.
70-3103/2007-004............ March 7, 2008....... ML080670475.
70-3103/2008-001............ April 24, 2008...... ML081160345.
70-3103/2008-002............ July 10, 2008....... ML081930118.
70-3103/2008-003............ October 30, 2008.... ML083040618.
70-3103/2008-004............ December 19, 2008... ML083540709.
70-3103/2008-006............ March 20, 2009...... ML090790642.
70-3103/2009-001............ March 26, 2009...... ML090850669.
70-3103/2009-002............ June 26, 2009....... ML091770643.
70-3103/2009-003............ September 30, 2009.. ML092730612.
70-3103/2009-004............ December 17, 2009... ML093511013.
70-3103/2009-006............ October 8, 2009..... ML092820188.
70-3103/2010-005............ March 26, 2010...... ML100850424.
70-3103/2010-012............ July 21, 2010....... ML102020385.
70-3103/2011-002............ April 29, 2011...... ML111190268.
70-3103/2011-003............ July 26, 2011....... ML112070634.
70-3103/2011-004............ October 28, 2011.... ML11301A218.
70-3103/2012-002............ April 30, 2012...... ML12121A579.
70-3103/2012-003............ July 6, 2012........ ML12188A105.
70-3103/2012-004............ .................... Pending.
------------------------------------------------------------------------
If you do not have access to ADAMS or if there are problems in
accessing the documents located in ADAMS, contact the NRC Public
Document Room (PDR) Reference staff at 1-800-397-4209, 301-415-4737, or
by email to pdr.resource@nrc.gov.
These documents may also be viewed electronically on the public
computers located at the NRC's PDR, O 1 F21, One White Flint North,
11555 Rockville Pike, Rockville, MD 20852. The PDR reproduction
contractor will copy documents for a fee.
Dated at Rockville, Maryland this 19th day of October 2012.
For the U.S. Nuclear Regulatory Commission
Brian W. Smith,
Chief, Uranium Enrichment Branch, Division of Fuel Cycle Safety and
Safeguards, Office of Nuclear Material Safety and Safeguards.
[FR Doc. 2012-26630 Filed 10-29-12; 8:45 am]
BILLING CODE 7590-01-P