Southwestern Power Administration; Notice of Filing, 65679-65680 [2012-26593]
Download as PDF
wreier-aviles on DSK7SPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 210 / Tuesday, October 30, 2012 / Notices
Comments Due: 5 p.m. ET 11/13/12.
Docket Numbers: ER13–169–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: SA 2236 CapX-Fargo T–
T to be effective 10/23/2012.
Filed Date: 10/22/12.
Accession Number: 20121022–5152.
Comments Due: 5 p.m. ET 11/13/12.
Docket Numbers: ER13–170–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: SA 2386 CapX Fargo
Phase 3 to be effective 10/23/2012.
Filed Date: 10/22/12.
Accession Number: 20121022–5169.
Comments Due: 5 p.m. ET 11/13/12.
Docket Numbers: ER13–171–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Carmel Data Center
Amendment Filing to be effective 9/1/
2012.
Filed Date: 10/23/12.
Accession Number: 20121023–5082.
Comments Due: 5 p.m. ET 11/13/12.
Docket Numbers: ER13–172–000.
Applicants: Midland Cogeneration
Venture Limited Partnership.
Description: Midland Cogeneration
Venture Limited Partnership submits
tariff filing per 35.13(a)(2)(iii: Midland
Cogeneration Venture Limited
Partnership Baseline MBR Tariff to be
effective 9/22/2010.
Filed Date: 10/23/12.
Accession Number: 20121023–5095.
Comments Due: 5 p.m. ET 11/13/12.
Docket Numbers: ER13–173–000.
Applicants: PSEG Fossil LLC.
Description: PSEG Fossil LLC submits
tariff filing per 35.1: Rate Schedules and
Service Agreements Tariff to be effective
10/23/2012.
Filed Date: 10/23/12.
Accession Number: 20121023–5096.
Comments Due: 5 p.m. ET 11/13/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
VerDate Mar<15>2010
13:17 Oct 29, 2012
Jkt 229001
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 23, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
65679
For further information, please
contact Jonathan First, 202–502–8529,
or jonathan.first@ferc.gov.
[FR Doc. 2012–26720 Filed 10–29–12; 8:45 am]
Dated: October 23, 2012.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
[FR Doc. 2012–26594 Filed 10–29–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commissioner and Staff
Attendance at North American Electric
Reliability Corporation Meetings
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and/or
Commission staff may attend the
following meetings:
North American Electric Reliability
Corporation
Member Representatives Committee and
Board of Trustees Meetings
Board of Trustees Compliance
Committee and Standards Oversight
and Technology Committee Meetings
JW Marriott New Orleans Hotel 614
Canal Street New Orleans, La 70130.
Nov. 6 (7:00 a.m.–5:00 p.m.) and Nov.
7 (8:00 a.m.–1:00 p.m.), 2012
Further information regarding these
meetings may be found at: https://
www.nerc.com/calendar.php.
The discussions at the meetings,
which are open to the public, may
address matters at issue in the following
Commission proceedings:
Docket No. RC08–5, North American
Electric Reliability Corporation
Docket No. RC11–5, North American
Electric Reliability Corporation
Docket No. RR08–4, North American
Electric Reliability Corporation
Docket No. RR12–8, North American
Electric Reliability Corporation
Docket No. RR12–10, North American
Electric Reliability Corporation
Docket No. RR12–11, North American
Electric Reliability Corporation
Docket No. RR12–12, North American
Electric Reliability Corporation
Docket No. RR12–13, North American
Electric Reliability Corporation
Docket No. RD09–11, North American
Electric Reliability Corporation
Docket No. RD10–2, North American
Electric Reliability Corporation
Docket No. RD12–3, North American
Electric Reliability Corporation
Docket No. RD12–5, North American
Electric Reliability Corporation
Docket No. RD12–6, North American
Electric Reliability Corporation
Docket No. NP11–238, North American
Electric Reliability Corporation
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. EF13–1–000]
Southwestern Power Administration;
Notice of Filing
Take notice that on October 18, 2012,
the Deputy Secretary of the Department
of Energy, pursuant to the authority
vested by sections 301(b), 302(a), 402(e),
641, 642, 643, and 644, of the
Department of Energy Organization Act
(Pub. L. 95–91), and by Delegation
Order Nos. 00–037.00 (December 6,
2001) and 00–001.00D (January 22,
2010), confirmed, approved, and placed
in effect on an interim basis in Rate
Order SWPA–64, Southwestern Power
Administration annual rate for the sale
of power and energy from the Willis
Project to the Sam Rayburn Municipal
Power Agency.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
E:\FR\FM\30OCN1.SGM
30OCN1
65680
Federal Register / Vol. 77, No. 210 / Tuesday, October 30, 2012 / Notices
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on November 23, 2012.
Dated: October 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–26593 Filed 10–29–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–4–000]
wreier-aviles on DSK7SPTVN1PROD with NOTICES
Gulf South Pipeline Company, L.P.;
Notice of Request Under Blanket
Authorization
Take notice that on October 11, 2012,
Gulf South Pipeline Company, L.P.
(Gulf South), 9 Greenway Plaza, Suite
2800, Houston, Texas 77046, pursuant
to the blanket certificate issued to Gulf
South’s predecessor in Docket No.
CP82–430–000,1 filed an application in
accordance to sections 157.205(b),
157.208(c), and 157(213) of the
Commission’s Regulations under the
Natural Gas Act (NGA) as amended, to
construct, own, operate, and maintain a
horizontal injection and withdrawal
well at Gulf South’s Bistineau Storage
Facility located in Bienville Parish,
Louisiana, all as more fully set forth in
the application, which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Bistineau Storage Facility is a
converted gas producing reservoir and
many of the original producing wells
were converted to storage service by
Gulf South in the late 1960’s. Some of
the existing well bores are over 50 years
old and have begun to deteriorate either
mechanically or operationally. Gulf
South proposed to construct a new
horizontal well to replace one or more
1 United Gas Pipe Line, Co., 20 FERC ¶ 62,416
(1982).
VerDate Mar<15>2010
13:17 Oct 29, 2012
Jkt 229001
of the existing vertical wells, which will
be Gulf South D–21H drilled near the
end of the D-lateral in Bienville Parish,
Louisiana. Gulf South also proposes to
construct approximately 0.06 miles of
associated 8-inch lateral and
appurtenant facilities. The proposed
facilities will be used as an injection
and withdrawal well. The project will
not alter the Bistineau Storage Facility’s
total inventory, working gas/cushion gas
ratio, reservoir pressure, reservoir or
buffer boundaries, or certificated
capacities, including injection and
withdrawal capacity. The estimated cost
of the proposed project is $3,500,000.
Any questions concerning this
application may be directed to J. Kyle
Stephens, Gulf South Pipeline
Company, L.P., 9 Greenway Plaza, Suite
2800, Houston, Texas 77046, (713) 479–
8033, or email at
kyle.stephens@bwpmlp.com.
This filing is available for review at
the Commission or may be viewed on
the Commission’s web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document. For
assistance, please contact FERC Online
Support at FERC
OnlineSupport@ferc.gov or call toll-free
at (866) 206–3676, or, for TTY, contact
(202) 502–8659. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
intervenors to file electronically.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to Section 7 of
the NGA.
Dated: October 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–26592 Filed 10–29–12; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meetings related to
the interregional transmission planning
activities of the Southwest Power Pool
(SPP):
SPP Seams FERC Order 1000 Task Force
Meeting—November 2, 2012.
The above-referenced meeting will be
a teleconference.
The above-referenced meeting is open
to the public.
Further information may be found at
www.spp.org.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. ER09–35–001, Tallgrass
Transmission, LLC
Docket No. ER09–36–001, Prairie Wind
Transmission, LLC
Docket No. ER09–548–001, ITC Great
Plains, LLC
Docket No. ER09–659–002, Southwest
Power Pool, Inc.
Docket No. ER11–4105–000, Southwest
Power Pool, Inc.
Docket No. EL11–34–001, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1401–000, Southwest
Power Pool, Inc.
Docket No. ER12–1402–000, Southwest
Power Pool, Inc.
Docket No. ER12–1415–000, Southwest
Power Pool, Inc.
Docket No. ER12–1460–000, Southwest
Power Pool, Inc.
Docket No. ER12–1586–000 et al.,
Southwest Power Pool, Inc.
Docket No. ER12–1610–000, Southwest
Power Pool, Inc.
Docket No. ER12–1772–000, Southwest
Power Pool, Inc.
Docket No. ER12–2366–000, Southwest
Power Pool, Inc.
Docket No. EL12–2–000, Southwest
Power Pool, Inc.
Docket No. EL12–60–000, Southwest
Power Pool, Inc., et al.
Docket No. ER12–2387–000 et al.,
Southwest Power Pool, Inc.
For more information, contact
Luciano Lima, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (202) 288–6738 or
Luciano.Lima@ferc.gov.
E:\FR\FM\30OCN1.SGM
30OCN1
Agencies
[Federal Register Volume 77, Number 210 (Tuesday, October 30, 2012)]
[Notices]
[Pages 65679-65680]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-26593]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EF13-1-000]
Southwestern Power Administration; Notice of Filing
Take notice that on October 18, 2012, the Deputy Secretary of the
Department of Energy, pursuant to the authority vested by sections
301(b), 302(a), 402(e), 641, 642, 643, and 644, of the Department of
Energy Organization Act (Pub. L. 95-91), and by Delegation Order Nos.
00-037.00 (December 6, 2001) and 00-001.00D (January 22, 2010),
confirmed, approved, and placed in effect on an interim basis in Rate
Order SWPA-64, Southwestern Power Administration annual rate for the
sale of power and energy from the Willis Project to the Sam Rayburn
Municipal Power Agency.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC.
[[Page 65680]]
There is an ``eSubscription'' link on the web site that enables
subscribers to receive email notification when a document is added to a
subscribed docket(s). For assistance with any FERC Online service,
please email FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll
free). For TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on November 23, 2012.
Dated: October 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-26593 Filed 10-29-12; 8:45 am]