Gulf South Pipeline Company, L.P.; Notice of Request Under Blanket Authorization, 65680 [2012-26592]
Download as PDF
65680
Federal Register / Vol. 77, No. 210 / Tuesday, October 30, 2012 / Notices
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on November 23, 2012.
Dated: October 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–26593 Filed 10–29–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–4–000]
wreier-aviles on DSK7SPTVN1PROD with NOTICES
Gulf South Pipeline Company, L.P.;
Notice of Request Under Blanket
Authorization
Take notice that on October 11, 2012,
Gulf South Pipeline Company, L.P.
(Gulf South), 9 Greenway Plaza, Suite
2800, Houston, Texas 77046, pursuant
to the blanket certificate issued to Gulf
South’s predecessor in Docket No.
CP82–430–000,1 filed an application in
accordance to sections 157.205(b),
157.208(c), and 157(213) of the
Commission’s Regulations under the
Natural Gas Act (NGA) as amended, to
construct, own, operate, and maintain a
horizontal injection and withdrawal
well at Gulf South’s Bistineau Storage
Facility located in Bienville Parish,
Louisiana, all as more fully set forth in
the application, which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Bistineau Storage Facility is a
converted gas producing reservoir and
many of the original producing wells
were converted to storage service by
Gulf South in the late 1960’s. Some of
the existing well bores are over 50 years
old and have begun to deteriorate either
mechanically or operationally. Gulf
South proposed to construct a new
horizontal well to replace one or more
1 United Gas Pipe Line, Co., 20 FERC ¶ 62,416
(1982).
VerDate Mar<15>2010
13:17 Oct 29, 2012
Jkt 229001
of the existing vertical wells, which will
be Gulf South D–21H drilled near the
end of the D-lateral in Bienville Parish,
Louisiana. Gulf South also proposes to
construct approximately 0.06 miles of
associated 8-inch lateral and
appurtenant facilities. The proposed
facilities will be used as an injection
and withdrawal well. The project will
not alter the Bistineau Storage Facility’s
total inventory, working gas/cushion gas
ratio, reservoir pressure, reservoir or
buffer boundaries, or certificated
capacities, including injection and
withdrawal capacity. The estimated cost
of the proposed project is $3,500,000.
Any questions concerning this
application may be directed to J. Kyle
Stephens, Gulf South Pipeline
Company, L.P., 9 Greenway Plaza, Suite
2800, Houston, Texas 77046, (713) 479–
8033, or email at
kyle.stephens@bwpmlp.com.
This filing is available for review at
the Commission or may be viewed on
the Commission’s web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document. For
assistance, please contact FERC Online
Support at FERC
OnlineSupport@ferc.gov or call toll-free
at (866) 206–3676, or, for TTY, contact
(202) 502–8659. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
intervenors to file electronically.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to Section 7 of
the NGA.
Dated: October 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–26592 Filed 10–29–12; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meetings related to
the interregional transmission planning
activities of the Southwest Power Pool
(SPP):
SPP Seams FERC Order 1000 Task Force
Meeting—November 2, 2012.
The above-referenced meeting will be
a teleconference.
The above-referenced meeting is open
to the public.
Further information may be found at
www.spp.org.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. ER09–35–001, Tallgrass
Transmission, LLC
Docket No. ER09–36–001, Prairie Wind
Transmission, LLC
Docket No. ER09–548–001, ITC Great
Plains, LLC
Docket No. ER09–659–002, Southwest
Power Pool, Inc.
Docket No. ER11–4105–000, Southwest
Power Pool, Inc.
Docket No. EL11–34–001, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–1401–000, Southwest
Power Pool, Inc.
Docket No. ER12–1402–000, Southwest
Power Pool, Inc.
Docket No. ER12–1415–000, Southwest
Power Pool, Inc.
Docket No. ER12–1460–000, Southwest
Power Pool, Inc.
Docket No. ER12–1586–000 et al.,
Southwest Power Pool, Inc.
Docket No. ER12–1610–000, Southwest
Power Pool, Inc.
Docket No. ER12–1772–000, Southwest
Power Pool, Inc.
Docket No. ER12–2366–000, Southwest
Power Pool, Inc.
Docket No. EL12–2–000, Southwest
Power Pool, Inc.
Docket No. EL12–60–000, Southwest
Power Pool, Inc., et al.
Docket No. ER12–2387–000 et al.,
Southwest Power Pool, Inc.
For more information, contact
Luciano Lima, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (202) 288–6738 or
Luciano.Lima@ferc.gov.
E:\FR\FM\30OCN1.SGM
30OCN1
Agencies
[Federal Register Volume 77, Number 210 (Tuesday, October 30, 2012)]
[Notices]
[Page 65680]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-26592]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP13-4-000]
Gulf South Pipeline Company, L.P.; Notice of Request Under
Blanket Authorization
Take notice that on October 11, 2012, Gulf South Pipeline Company,
L.P. (Gulf South), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046,
pursuant to the blanket certificate issued to Gulf South's predecessor
in Docket No. CP82-430-000,\1\ filed an application in accordance to
sections 157.205(b), 157.208(c), and 157(213) of the Commission's
Regulations under the Natural Gas Act (NGA) as amended, to construct,
own, operate, and maintain a horizontal injection and withdrawal well
at Gulf South's Bistineau Storage Facility located in Bienville Parish,
Louisiana, all as more fully set forth in the application, which is on
file with the Commission and open to public inspection. The filing may
also be viewed on the web at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC at OnlineSupport@ferc.gov">FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or
TYY, (202) 502-8659.
---------------------------------------------------------------------------
\1\ United Gas Pipe Line, Co., 20 FERC ] 62,416 (1982).
---------------------------------------------------------------------------
The Bistineau Storage Facility is a converted gas producing
reservoir and many of the original producing wells were converted to
storage service by Gulf South in the late 1960's. Some of the existing
well bores are over 50 years old and have begun to deteriorate either
mechanically or operationally. Gulf South proposed to construct a new
horizontal well to replace one or more of the existing vertical wells,
which will be Gulf South D-21H drilled near the end of the D-lateral in
Bienville Parish, Louisiana. Gulf South also proposes to construct
approximately 0.06 miles of associated 8-inch lateral and appurtenant
facilities. The proposed facilities will be used as an injection and
withdrawal well. The project will not alter the Bistineau Storage
Facility's total inventory, working gas/cushion gas ratio, reservoir
pressure, reservoir or buffer boundaries, or certificated capacities,
including injection and withdrawal capacity. The estimated cost of the
proposed project is $3,500,000.
Any questions concerning this application may be directed to J.
Kyle Stephens, Gulf South Pipeline Company, L.P., 9 Greenway Plaza,
Suite 2800, Houston, Texas 77046, (713) 479-8033, or email at
kyle.stephens@bwpmlp.com.
This filing is available for review at the Commission or may be
viewed on the Commission's web site at https://www.ferc.gov, using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number filed to access the document. For
assistance, please contact FERC Online Support at OnlineSupport@ferc.gov">FERCOnlineSupport@ferc.gov or call toll-free at (866) 206-3676, or, for
TTY, contact (202) 502-8659. Comments, protests and interventions may
be filed electronically via the Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's web site
under the ``e-Filing'' link. The Commission strongly encourages
intervenors to file electronically.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the NGA.
Dated: October 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-26592 Filed 10-29-12; 8:45 am]
BILLING CODE 6717-01-P