Gulf South Pipeline Company, L.P.; Notice of Request Under Blanket Authorization, 65680 [2012-26592]

Download as PDF 65680 Federal Register / Vol. 77, No. 210 / Tuesday, October 30, 2012 / Notices There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on November 23, 2012. Dated: October 23, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–26593 Filed 10–29–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13–4–000] wreier-aviles on DSK7SPTVN1PROD with NOTICES Gulf South Pipeline Company, L.P.; Notice of Request Under Blanket Authorization Take notice that on October 11, 2012, Gulf South Pipeline Company, L.P. (Gulf South), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, pursuant to the blanket certificate issued to Gulf South’s predecessor in Docket No. CP82–430–000,1 filed an application in accordance to sections 157.205(b), 157.208(c), and 157(213) of the Commission’s Regulations under the Natural Gas Act (NGA) as amended, to construct, own, operate, and maintain a horizontal injection and withdrawal well at Gulf South’s Bistineau Storage Facility located in Bienville Parish, Louisiana, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Bistineau Storage Facility is a converted gas producing reservoir and many of the original producing wells were converted to storage service by Gulf South in the late 1960’s. Some of the existing well bores are over 50 years old and have begun to deteriorate either mechanically or operationally. Gulf South proposed to construct a new horizontal well to replace one or more 1 United Gas Pipe Line, Co., 20 FERC ¶ 62,416 (1982). VerDate Mar<15>2010 13:17 Oct 29, 2012 Jkt 229001 of the existing vertical wells, which will be Gulf South D–21H drilled near the end of the D-lateral in Bienville Parish, Louisiana. Gulf South also proposes to construct approximately 0.06 miles of associated 8-inch lateral and appurtenant facilities. The proposed facilities will be used as an injection and withdrawal well. The project will not alter the Bistineau Storage Facility’s total inventory, working gas/cushion gas ratio, reservoir pressure, reservoir or buffer boundaries, or certificated capacities, including injection and withdrawal capacity. The estimated cost of the proposed project is $3,500,000. Any questions concerning this application may be directed to J. Kyle Stephens, Gulf South Pipeline Company, L.P., 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, (713) 479– 8033, or email at kyle.stephens@bwpmlp.com. This filing is available for review at the Commission or may be viewed on the Commission’s web site at https:// www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number filed to access the document. For assistance, please contact FERC Online Support at FERC OnlineSupport@ferc.gov or call toll-free at (866) 206–3676, or, for TTY, contact (202) 502–8659. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s web site under the ‘‘e-Filing’’ link. The Commission strongly encourages intervenors to file electronically. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA. Dated: October 23, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–26592 Filed 10–29–12; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission’s staff may attend the following meetings related to the interregional transmission planning activities of the Southwest Power Pool (SPP): SPP Seams FERC Order 1000 Task Force Meeting—November 2, 2012. The above-referenced meeting will be a teleconference. The above-referenced meeting is open to the public. Further information may be found at www.spp.org. The discussions at the meeting described above may address matters at issue in the following proceedings: Docket No. ER09–35–001, Tallgrass Transmission, LLC Docket No. ER09–36–001, Prairie Wind Transmission, LLC Docket No. ER09–548–001, ITC Great Plains, LLC Docket No. ER09–659–002, Southwest Power Pool, Inc. Docket No. ER11–4105–000, Southwest Power Pool, Inc. Docket No. EL11–34–001, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–1401–000, Southwest Power Pool, Inc. Docket No. ER12–1402–000, Southwest Power Pool, Inc. Docket No. ER12–1415–000, Southwest Power Pool, Inc. Docket No. ER12–1460–000, Southwest Power Pool, Inc. Docket No. ER12–1586–000 et al., Southwest Power Pool, Inc. Docket No. ER12–1610–000, Southwest Power Pool, Inc. Docket No. ER12–1772–000, Southwest Power Pool, Inc. Docket No. ER12–2366–000, Southwest Power Pool, Inc. Docket No. EL12–2–000, Southwest Power Pool, Inc. Docket No. EL12–60–000, Southwest Power Pool, Inc., et al. Docket No. ER12–2387–000 et al., Southwest Power Pool, Inc. For more information, contact Luciano Lima, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 288–6738 or Luciano.Lima@ferc.gov. E:\FR\FM\30OCN1.SGM 30OCN1

Agencies

[Federal Register Volume 77, Number 210 (Tuesday, October 30, 2012)]
[Notices]
[Page 65680]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-26592]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP13-4-000]


Gulf South Pipeline Company, L.P.; Notice of Request Under 
Blanket Authorization

    Take notice that on October 11, 2012, Gulf South Pipeline Company, 
L.P. (Gulf South), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, 
pursuant to the blanket certificate issued to Gulf South's predecessor 
in Docket No. CP82-430-000,\1\ filed an application in accordance to 
sections 157.205(b), 157.208(c), and 157(213) of the Commission's 
Regulations under the Natural Gas Act (NGA) as amended, to construct, 
own, operate, and maintain a horizontal injection and withdrawal well 
at Gulf South's Bistineau Storage Facility located in Bienville Parish, 
Louisiana, all as more fully set forth in the application, which is on 
file with the Commission and open to public inspection. The filing may 
also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC at OnlineSupport@ferc.gov">FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or 
TYY, (202) 502-8659.
---------------------------------------------------------------------------

    \1\ United Gas Pipe Line, Co., 20 FERC ] 62,416 (1982).
---------------------------------------------------------------------------

    The Bistineau Storage Facility is a converted gas producing 
reservoir and many of the original producing wells were converted to 
storage service by Gulf South in the late 1960's. Some of the existing 
well bores are over 50 years old and have begun to deteriorate either 
mechanically or operationally. Gulf South proposed to construct a new 
horizontal well to replace one or more of the existing vertical wells, 
which will be Gulf South D-21H drilled near the end of the D-lateral in 
Bienville Parish, Louisiana. Gulf South also proposes to construct 
approximately 0.06 miles of associated 8-inch lateral and appurtenant 
facilities. The proposed facilities will be used as an injection and 
withdrawal well. The project will not alter the Bistineau Storage 
Facility's total inventory, working gas/cushion gas ratio, reservoir 
pressure, reservoir or buffer boundaries, or certificated capacities, 
including injection and withdrawal capacity. The estimated cost of the 
proposed project is $3,500,000.
    Any questions concerning this application may be directed to J. 
Kyle Stephens, Gulf South Pipeline Company, L.P., 9 Greenway Plaza, 
Suite 2800, Houston, Texas 77046, (713) 479-8033, or email at 
kyle.stephens@bwpmlp.com.
    This filing is available for review at the Commission or may be 
viewed on the Commission's web site at https://www.ferc.gov, using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number filed to access the document. For 
assistance, please contact FERC Online Support at OnlineSupport@ferc.gov">FERCOnlineSupport@ferc.gov or call toll-free at (866) 206-3676, or, for 
TTY, contact (202) 502-8659. Comments, protests and interventions may 
be filed electronically via the Internet in lieu of paper. See, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's web site 
under the ``e-Filing'' link. The Commission strongly encourages 
intervenors to file electronically.
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to Section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to Section 7 of the NGA.

    Dated: October 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-26592 Filed 10-29-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.