Notice of Commission Staff Attendance, 64982-64983 [2012-26140]

Download as PDF 64982 Federal Register / Vol. 77, No. 206 / Wednesday, October 24, 2012 / Notices Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 18, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–26182 Filed 10–23–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13–1–000] wreier-aviles on DSK5TPTVN1PROD with WBI Energy Transmission, Inc.; Notice of Request Under Blanket Authorization Take notice that on October 4, 2012 WBI Energy Transmission, Inc (WBI Energy), 1250 West Century Avenue, Bismark, North Dakota, 58503, filed in Docket No. CP13–1–000, a Prior Notice request pursuant to sections 157.205 and 157.216 of the Commission’s Regulations under the Natural Gas Act for authorization to abandon storage facilities at its Baker Storage Reservoir in Fallon County, Montana. Specifically, WBI Energy proposes to abandon one natural gas storage well (Well 23) and its associated 4-inch diameter well line measuring approximately 125 feet (Well Line 23). Well 23 has not been utilized since November 2011 due to sub-surface damage and unsuccessful repair attempts. WBI Energy has determined that plugging and abandoning the well is the best course of action, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https://www. ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this Application should be directed to Keith A. Tiggelaar, Director of Regulatory Affairs, WBI Energy Transmission, Inc., P.O. Box 5601, Bismark, North Dakota, 58506, or call (701) 530–1560, or by email: keith.tiggelaar@wbienergy.com. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of VerDate Mar<15>2010 14:21 Oct 23, 2012 Jkt 229001 the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Dated: October 17, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–26137 Filed 10–23–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission’s staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): Midwest ISO–PJM Interregional Coordination Workshop October 24, 2012, 8:00 a.m.–3:00 p.m., Local Time. PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 PJM Regional Transmission Planning Task Force/PJM Interconnection Process Senior Task Force November 16, 2012, 9:30 a.m.–3:00 p.m., Local Time; December 17, 2012, 9:30 a.m.–3:00 p.m., Local Time. The above-referenced meetings will be held over conference call or at: The PJM Conference & Training Center, Norristown, PA. or Midwest ISO, Carmel, IN. The above-referenced meetings are open to stakeholders. Further information may be found at www.pjm.com. The discussions at the meetings described above may address matters at issue in the following proceedings: Docket No. EL05–121, PJM Interconnection, L.L.C. Docket No. EL07–56, Allegheny Electric Cooperative, Inc., et a., v PJM Interconnection, L.L.C. Docket No. EL07–58, Organization of PJM States, Inc., et al., v. PJM Interconnection, L.L.C. Docket No. EL08–14, Black Oak Energy LLC, et al., v. FERC Docket No. EL10–52, Central Transmission, LLC v. PJM Interconnection, L.L.C. Docket No. EL12–45, PJM Interconnection, L.L.C. Docket No. EL12–50, First Energy Solutions Corporation et al v. PJM Interconnection, L.L.C. Docket No. EL12–54, Viridity Energy, Inc. v. PJM Interconnection, L.L.C. Docket No. EL12–69, Primary Power LLC v. PJM Interconnection, L.L.C. Docket No. EL12–8, DC Energy, L.L.C. and DC Energy Mid-Atlantic, L.L.C. vs. PJM Interconnection, L.L.C. Docket No. AD12–1 and ER11–4081, Midwest Independent Transmission System Operator, Inc. Docket No. AD12–16, Capacity Deliverability Across the Midwest Independent Transmission System Operator, Inc./PJM Interconnection, L.L.C. Seam Docket No. EL13–10, North American Natural Resources, Inc. v. PJM Interconnection, L.L.C. et. al. Docket No. ER08–194–000, et al., Duquesne Light Company et al. Docket No. ER09–1063, PJM Interconnection, L.L.C. Docket No. ER09–1148, PPL Electric Utilities Corporation Docket No. ER09–1256, PotomacAppalachian Transmission Highline, L.L.C. Docket Nos. ER09–1589 and EL10–6, FirstEnergy Service Company E:\FR\FM\24OCN1.SGM 24OCN1 wreier-aviles on DSK5TPTVN1PROD with Federal Register / Vol. 77, No. 206 / Wednesday, October 24, 2012 / Notices Docket No. ER10–253 and EL10–14, Primary Power, L.L.C. Docket No. ER10–549, PJM Interconnection, L.L.C. Docket No. ER11–1844, Midwest Independent Transmission System Operator, Inc. Docket Nos. ER11–2814 and ER11–2815, PJM Interconnection, L.L.C. and American Transmission Systems, Inc. Docket No. ER11–2875 and EL11–20, PJM Interconnection, L.L.C. Docket No. ER11–4106, PJM Interconnection, L.L.C. Docket No. ER11–4628, PJM Interconnection, L.L.C. Docket No. ER12–1173, PJM Interconnection, L.L.C., et. al. Docket No. ER12–1178, PJM Interconnection, L.L.C. Docket No. ER12–92, PJM Interconnection, L.L.C., et. al Docket No. ER12–1204, PJM Interconnection, L.L.C. Docket No. ER12–1761, PJM Interconnection, L.L.C. Docket No. ER12–2080, GenOn Power Midwest, LP Docket No. ER12–2260, New York Independent System Operator, Inc Docket No. ER12–2262, PJM Interconnection, L.L.C. Docket No. ER12–2274, Public Service Electric and Gas Company Docket No. ER12–2391, PJM Interconnection, L.L.C. Docket No. ER12–2399, PJM Interconnection, L.L.C. Docket No. ER12–2417, PJM Interconnection, L.L.C. Docket No. ER12–2440, PJM Interconnection, L.L.C. Docket No. ER12–2442, PJM Interconnection, L.L.C. Docket No. ER12–2469, PJM Interconnection, L.L.C. Docket No. ER12–2486, PJM Interconnection, L.L.C. Docket No. ER12–2518, PJM Interconnection, L.L.C. Docket No. ER12–2527, PJM Interconnection, L.L.C. Docket No. ER12–2550, PJM Interconnection, L.L.C. Docket No. ER12–2574, PJM Interconnection, L.L.C. Docket No. ER12–2594, PJM Interconnection, L.L.C. Docket No. ER12–2599, PJM Interconnection, L.L.C. Docket No. ER12–2604, PJM Interconnection, L.L.C. Docket No. ER12–2606, PJM Interconnection, L.L.C. Docket No. ER12–2610, PJM Interconnection, L.L.C. Docket No. ER12–2616, PJM Interconnection, L.L.C. Docket No. ER12–2624, PJM Interconnection, L.L.C. VerDate Mar<15>2010 14:21 Oct 23, 2012 Jkt 229001 Docket No. ER12–2661, PJM Interconnection, L.L.C. Docket No. ER12–2663, PJM Interconnection, L.L.C. Docket No. ER12–2664, PJM Interconnection, L.L.C. Docket No. ER12–2671, PJM Interconnection, L.L.C. Docket No. ER12–2688, PJM Interconnection, L.L.C. Docket No. ER12–2815, PJM Interconnection, L.L.C. Docket No. ER12–469, PJM Interconnection, L.L.C. Docket No. ER12–513, PJM Interconnection, L.L.C. Docket No. ER12–718, New York Independent System Operator, Inc. Docket No. ER12–91, PJM Interconnection, L.L.C. Docket No. ER12–92, PJM Interconnection, L.L.C. Docket No. ER12–469, PJM Interconnection, L.L.C., Docket Nos. ER11–2183 and EL11–32, American Electric Power Service Corporation Docket No. ER12–2085, PJM Interconnection, L.L.C. Docket No. ER12–2707, PJM Interconnection, L.L.C. Docket No. ER12–2708, PJM Interconnection, L.L.C. Docket No. ER13–27, PJM Interconnection, L.L.C. Docket No. ER13–51, PJM Interconnection, L.L.C. Docket No. ER13–52, PJM Interconnection, L.L.C. Docket No. ER13–53, PJM Interconnection, L.L.C. Docket No. ER13–66, PJM Interconnection, L.L.C. Docket No. ER13–74, PJM Interconnection, L.L.C. Docket No. ER13–90, Public Service Electric and Gas Company and PJM Interconnection, L.L.C. Docket No. ER13–116, PJM Interconnection, L.L.C. Docket No. ER13–124, PJM Interconnection, L.L.C. Docket No. ER13–126, PJM Interconnection, L.L.C. For more information, contact Jonathan Fernandez, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502– 6604 or jonathan.fernandez@ferc.gov. Dated: October 17, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–26140 Filed 10–23–12; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 64983 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission’s staff may attend the following meetings related to the transmission planning activities of the Midwest Independent Transmission System Operator, Inc. (MISO): MISO–PJM Order 1000 Interregional Coordination Workshop—October 24, 2012 The above-referenced meeting will be held at: MISO Headquarters, 720 City Center Drive, Carmel, IN 46032. The above-referenced meeting is open to the public. Further information may be found at www.misoenergy.org. The discussions at the meeting described above may address matters at issue in the following proceedings: Docket No. ER10–1791, Midwest Independent Transmission System Operator, Inc. Docket No. ER11–1844, Midwest Independent Transmission System Operator, Inc. Docket No. ER11–2700, Midwest Independent Transmission System Operator, Inc. Docket No. ER11–4081, Midwest Independent Transmission System Operator, Inc. Docket No. ER11–4514, Midwest Independent Transmission System Operator, Inc. Docket No. ER11–2777, Midwest Independent Transmission System Operator, Inc. and Ameren Illinois Company Docket No. ER12–427, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–480, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–678, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–715, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–1265, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–1266, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–1586, Southwest Power Pool, Inc. E:\FR\FM\24OCN1.SGM 24OCN1

Agencies

[Federal Register Volume 77, Number 206 (Wednesday, October 24, 2012)]
[Notices]
[Pages 64982-64983]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-26140]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Commission Staff Attendance

    The Federal Energy Regulatory Commission hereby gives notice that 
members of the Commission's staff may attend the following meetings 
related to the transmission planning activities of the PJM 
Interconnection, L.L.C. (PJM):

Midwest ISO-PJM Interregional Coordination Workshop

October 24, 2012, 8:00 a.m.-3:00 p.m., Local Time.

PJM Regional Transmission Planning Task Force/PJM Interconnection 
Process Senior Task Force

November 16, 2012, 9:30 a.m.-3:00 p.m., Local Time;
December 17, 2012, 9:30 a.m.-3:00 p.m., Local Time.

    The above-referenced meetings will be held over conference call or 
at:

The PJM Conference & Training Center, Norristown, PA.

     or

Midwest ISO, Carmel, IN.

    The above-referenced meetings are open to stakeholders.
    Further information may be found at www.pjm.com.
    The discussions at the meetings described above may address matters 
at issue in the following proceedings:

Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. EL07-56, Allegheny Electric Cooperative, Inc., et a., v PJM 
Interconnection, L.L.C.
Docket No. EL07-58, Organization of PJM States, Inc., et al., v. PJM 
Interconnection, L.L.C.
Docket No. EL08-14, Black Oak Energy LLC, et al., v. FERC
Docket No. EL10-52, Central Transmission, LLC v. PJM Interconnection, 
L.L.C.
Docket No. EL12-45, PJM Interconnection, L.L.C.
Docket No. EL12-50, First Energy Solutions Corporation et al v. PJM 
Interconnection, L.L.C.
Docket No. EL12-54, Viridity Energy, Inc. v. PJM Interconnection, 
L.L.C.
Docket No. EL12-69, Primary Power LLC v. PJM Interconnection, L.L.C.
Docket No. EL12-8, DC Energy, L.L.C. and DC Energy Mid-Atlantic, L.L.C. 
vs. PJM Interconnection, L.L.C.
Docket No. AD12-1 and ER11-4081, Midwest Independent Transmission 
System Operator, Inc.
Docket No. AD12-16, Capacity Deliverability Across the Midwest 
Independent Transmission System Operator, Inc./PJM Interconnection, 
L.L.C. Seam
Docket No. EL13-10, North American Natural Resources, Inc. v. PJM 
Interconnection, L.L.C. et. al.
Docket No. ER08-194-000, et al., Duquesne Light Company et al.
Docket No. ER09-1063, PJM Interconnection, L.L.C.
Docket No. ER09-1148, PPL Electric Utilities Corporation
Docket No. ER09-1256, Potomac-Appalachian Transmission Highline, L.L.C.
Docket Nos. ER09-1589 and EL10-6, FirstEnergy Service Company

[[Page 64983]]

Docket No. ER10-253 and EL10-14, Primary Power, L.L.C.
Docket No. ER10-549, PJM Interconnection, L.L.C.
Docket No. ER11-1844, Midwest Independent Transmission System Operator, 
Inc.
Docket Nos. ER11-2814 and ER11-2815, PJM Interconnection, L.L.C. and 
American Transmission Systems, Inc.
Docket No. ER11-2875 and EL11-20, PJM Interconnection, L.L.C.
Docket No. ER11-4106, PJM Interconnection, L.L.C.
Docket No. ER11-4628, PJM Interconnection, L.L.C.
Docket No. ER12-1173, PJM Interconnection, L.L.C., et. al.
Docket No. ER12-1178, PJM Interconnection, L.L.C.
Docket No. ER12-92, PJM Interconnection, L.L.C., et. al
Docket No. ER12-1204, PJM Interconnection, L.L.C.
Docket No. ER12-1761, PJM Interconnection, L.L.C.
Docket No. ER12-2080, GenOn Power Midwest, LP
Docket No. ER12-2260, New York Independent System Operator, Inc
Docket No. ER12-2262, PJM Interconnection, L.L.C.
Docket No. ER12-2274, Public Service Electric and Gas Company
Docket No. ER12-2391, PJM Interconnection, L.L.C.
Docket No. ER12-2399, PJM Interconnection, L.L.C.
Docket No. ER12-2417, PJM Interconnection, L.L.C.
Docket No. ER12-2440, PJM Interconnection, L.L.C.
Docket No. ER12-2442, PJM Interconnection, L.L.C.
Docket No. ER12-2469, PJM Interconnection, L.L.C.
Docket No. ER12-2486, PJM Interconnection, L.L.C.
Docket No. ER12-2518, PJM Interconnection, L.L.C.
Docket No. ER12-2527, PJM Interconnection, L.L.C.
Docket No. ER12-2550, PJM Interconnection, L.L.C.
Docket No. ER12-2574, PJM Interconnection, L.L.C.
Docket No. ER12-2594, PJM Interconnection, L.L.C.
Docket No. ER12-2599, PJM Interconnection, L.L.C.
Docket No. ER12-2604, PJM Interconnection, L.L.C.
Docket No. ER12-2606, PJM Interconnection, L.L.C.
Docket No. ER12-2610, PJM Interconnection, L.L.C.
Docket No. ER12-2616, PJM Interconnection, L.L.C.
Docket No. ER12-2624, PJM Interconnection, L.L.C.
Docket No. ER12-2661, PJM Interconnection, L.L.C.
Docket No. ER12-2663, PJM Interconnection, L.L.C.
Docket No. ER12-2664, PJM Interconnection, L.L.C.
Docket No. ER12-2671, PJM Interconnection, L.L.C.
Docket No. ER12-2688, PJM Interconnection, L.L.C.
Docket No. ER12-2815, PJM Interconnection, L.L.C.
Docket No. ER12-469, PJM Interconnection, L.L.C.
Docket No. ER12-513, PJM Interconnection, L.L.C.
Docket No. ER12-718, New York Independent System Operator, Inc.
Docket No. ER12-91, PJM Interconnection, L.L.C.
Docket No. ER12-92, PJM Interconnection, L.L.C.
Docket No. ER12-469, PJM Interconnection, L.L.C.,
Docket Nos. ER11-2183 and EL11-32, American Electric Power Service 
Corporation
Docket No. ER12-2085, PJM Interconnection, L.L.C.
Docket No. ER12-2707, PJM Interconnection, L.L.C.
Docket No. ER12-2708, PJM Interconnection, L.L.C.
Docket No. ER13-27, PJM Interconnection, L.L.C.
Docket No. ER13-51, PJM Interconnection, L.L.C.
Docket No. ER13-52, PJM Interconnection, L.L.C.
Docket No. ER13-53, PJM Interconnection, L.L.C.
Docket No. ER13-66, PJM Interconnection, L.L.C.
Docket No. ER13-74, PJM Interconnection, L.L.C.
Docket No. ER13-90, Public Service Electric and Gas Company and PJM 
Interconnection, L.L.C.
Docket No. ER13-116, PJM Interconnection, L.L.C.
Docket No. ER13-124, PJM Interconnection, L.L.C.
Docket No. ER13-126, PJM Interconnection, L.L.C.

    For more information, contact Jonathan Fernandez, Office of Energy 
Market Regulation, Federal Energy Regulatory Commission at (202) 502-
6604 or jonathan.fernandez@ferc.gov.

    Dated: October 17, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-26140 Filed 10-23-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.