Download as PDF 64982 Federal Register / Vol. 77, No. 206 / Wednesday, October 24, 2012 / Notices Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 18, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–26182 Filed 10–23–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13–1–000] wreier-aviles on DSK5TPTVN1PROD with WBI Energy Transmission, Inc.; Notice of Request Under Blanket Authorization Take notice that on October 4, 2012 WBI Energy Transmission, Inc (WBI Energy), 1250 West Century Avenue, Bismark, North Dakota, 58503, filed in Docket No. CP13–1–000, a Prior Notice request pursuant to sections 157.205 and 157.216 of the Commission’s Regulations under the Natural Gas Act for authorization to abandon storage facilities at its Baker Storage Reservoir in Fallon County, Montana. Specifically, WBI Energy proposes to abandon one natural gas storage well (Well 23) and its associated 4-inch diameter well line measuring approximately 125 feet (Well Line 23). Well 23 has not been utilized since November 2011 due to sub-surface damage and unsuccessful repair attempts. WBI Energy has determined that plugging and abandoning the well is the best course of action, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https://www. ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this Application should be directed to Keith A. Tiggelaar, Director of Regulatory Affairs, WBI Energy Transmission, Inc., P.O. Box 5601, Bismark, North Dakota, 58506, or call (701) 530–1560, or by email: keith.tiggelaar@wbienergy.com. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of VerDate Mar<15>2010 14:21 Oct 23, 2012 Jkt 229001 the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Dated: October 17, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–26137 Filed 10–23–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission’s staff may attend the following meetings related to the transmission planning activities of the PJM Interconnection, L.L.C. (PJM): Midwest ISO–PJM Interregional Coordination Workshop October 24, 2012, 8:00 a.m.–3:00 p.m., Local Time. PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 PJM Regional Transmission Planning Task Force/PJM Interconnection Process Senior Task Force November 16, 2012, 9:30 a.m.–3:00 p.m., Local Time; December 17, 2012, 9:30 a.m.–3:00 p.m., Local Time. The above-referenced meetings will be held over conference call or at: The PJM Conference & Training Center, Norristown, PA. or Midwest ISO, Carmel, IN. The above-referenced meetings are open to stakeholders. Further information may be found at www.pjm.com. The discussions at the meetings described above may address matters at issue in the following proceedings: Docket No. EL05–121, PJM Interconnection, L.L.C. Docket No. EL07–56, Allegheny Electric Cooperative, Inc., et a., v PJM Interconnection, L.L.C. Docket No. EL07–58, Organization of PJM States, Inc., et al., v. PJM Interconnection, L.L.C. Docket No. EL08–14, Black Oak Energy LLC, et al., v. FERC Docket No. EL10–52, Central Transmission, LLC v. PJM Interconnection, L.L.C. Docket No. EL12–45, PJM Interconnection, L.L.C. Docket No. EL12–50, First Energy Solutions Corporation et al v. PJM Interconnection, L.L.C. Docket No. EL12–54, Viridity Energy, Inc. v. PJM Interconnection, L.L.C. Docket No. EL12–69, Primary Power LLC v. PJM Interconnection, L.L.C. Docket No. EL12–8, DC Energy, L.L.C. and DC Energy Mid-Atlantic, L.L.C. vs. PJM Interconnection, L.L.C. Docket No. AD12–1 and ER11–4081, Midwest Independent Transmission System Operator, Inc. Docket No. AD12–16, Capacity Deliverability Across the Midwest Independent Transmission System Operator, Inc./PJM Interconnection, L.L.C. Seam Docket No. EL13–10, North American Natural Resources, Inc. v. PJM Interconnection, L.L.C. et. al. Docket No. ER08–194–000, et al., Duquesne Light Company et al. Docket No. ER09–1063, PJM Interconnection, L.L.C. Docket No. ER09–1148, PPL Electric Utilities Corporation Docket No. ER09–1256, PotomacAppalachian Transmission Highline, L.L.C. Docket Nos. ER09–1589 and EL10–6, FirstEnergy Service Company E:\FR\FM\24OCN1.SGM 24OCN1

Agencies

[Federal Register Volume 77, Number 206 (Wednesday, October 24, 2012)]
[Notices]
[Page 64982]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-26137]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP13-1-000]


WBI Energy Transmission, Inc.; Notice of Request Under Blanket 
Authorization

    Take notice that on October 4, 2012 WBI Energy Transmission, Inc 
(WBI Energy), 1250 West Century Avenue, Bismark, North Dakota, 58503, 
filed in Docket No. CP13-1-000, a Prior Notice request pursuant to 
sections 157.205 and 157.216 of the Commission's Regulations under the 
Natural Gas Act for authorization to abandon storage facilities at its 
Baker Storage Reservoir in Fallon County, Montana. Specifically, WBI 
Energy proposes to abandon one natural gas storage well (Well 23) and 
its associated 4-inch diameter well line measuring approximately 125 
feet (Well Line 23). Well 23 has not been utilized since November 2011 
due to sub-surface damage and unsuccessful repair attempts. WBI Energy 
has determined that plugging and abandoning the well is the best course 
of action, all as more fully set forth in the application which is on 
file with the Commission and open to public inspection. The filing may 
also be viewed on the Web at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or 
TTY, (202) 502-8659.
    Any questions regarding this Application should be directed to 
Keith A. Tiggelaar, Director of Regulatory Affairs, WBI Energy 
Transmission, Inc., P.O. Box 5601, Bismark, North Dakota, 58506, or 
call (701) 530-1560, or by email: keith.tiggelaar@wbienergy.com.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the NGA (18 CFR 157.205) file a protest to the request. If no protest 
is filed within the time allowed therefore, the proposed activity shall 
be deemed to be authorized effective the day after the time allowed for 
protest. If a protest is filed and not withdrawn within 30 days after 
the time allowed for filing a protest, the instant request shall be 
treated as an application for authorization pursuant to section 7 of 
the NGA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenter's will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenter's will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentary, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (www.ferc.gov) under the ``e-Filing'' link.

    Dated: October 17, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-26137 Filed 10-23-12; 8:45 am]
BILLING CODE 6717-01-P