Don W. Gilbert Hydro Power, LLC; Notice of Application Accepted for Filing With the Commission; Intent To Waive Scoping; Soliciting Motions To Intervene and Protests; Ready for Environmental Analysis; and Soliciting Comments, Terms and Conditions, Recommendations, and Prescriptions, 64973-64974 [2012-26133]
Download as PDF
Federal Register / Vol. 77, No. 206 / Wednesday, October 24, 2012 / Notices
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: November 7, 2012.
Dated: October 17, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–26138 Filed 10–23–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14367–001]
wreier-aviles on DSK5TPTVN1PROD with
Don W. Gilbert Hydro Power, LLC;
Notice of Application Accepted for
Filing With the Commission; Intent To
Waive Scoping; Soliciting Motions To
Intervene and Protests; Ready for
Environmental Analysis; and Soliciting
Comments, Terms and Conditions,
Recommendations, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original
Minor License.
b. Project No.: 14367–001.
c. Date filed: May 30, 2012.
d. Applicant: Don W. Gilbert Hydro
Power, LLC.
e. Name of Project: Gilbert
Hydroelectric Project.
VerDate Mar<15>2010
14:21 Oct 23, 2012
Jkt 229001
f. Location: The project would utilize
unnamed springs near the Bear River,
eight miles southwest of Grace, Caribou
County, Idaho. The project would not
occupy any federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r). (2006).
h. Applicant Contact: Don W. Gilbert
and DeAnn G. Somonich, Don W.
Gilbert Hydro Power, LLC, 1805 Grace
Power Plant Road, Grace, Idaho 83241.
Phone: (801) 725–1754.
i. FERC Contact: Kelly Wolcott, (202)
502–6480 or kelly.wolcott@ferc.gov.
j. Deadline for filing motions to
intervene and protests, requests for
cooperating agency status, comments,
terms and conditions,
recommendations, and prescriptions: 60
days from the issuance date of this
notice; reply comments are due 105
days from the issuance date of this
notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. The Gilbert Project would consist of
the following new features: (1) A 8-footlong, 3-foot-wide, 3-foot-deep drop inlet
structure; (2) a 2-foot-diameter, 700-footlong partially buried steel or plastic
penstock; (3) a powerhouse containing
two 45-kilowatt (kW) turbine/generator
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
64973
units for a total installed capacity of 90
kW; (4) a tailrace to convey flows from
the powerhouse to the Bear River; (5) a
150-foot-long, 480-kilovolt transmission
line; and (6) appurtenant facilities. The
project is estimated to generate an
average of 550 megawatthours annually.
The project would be located on lands
owned by the applicant.
m. Due to the applicant’s close
coordination with federal and state
agencies during the preparation of the
application, completed studies, and
agency comments, we intend to waive
scoping. Based on a review of the
application, resource agency
consultation letters, and comments filed
to date, Commission staff intends to
prepare a single environmental
assessment (EA). Commission staff
determined that the issues that need to
be addressed in its EA have been
adequately identified during the prefiling period, which included a public
meeting and site visit, and no new
issues are likely to be identified through
additional scoping. The EA will
consider assessing the potential effects
of project construction and operation on
geology and soils, aquatic, terrestrial,
threatened and endangered species, and
cultural and historic resources.
n. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
E:\FR\FM\24OCN1.SGM
24OCN1
wreier-aviles on DSK5TPTVN1PROD with
64974
Federal Register / Vol. 77, No. 206 / Wednesday, October 24, 2012 / Notices
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) Bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘NOTICE OF
INTENT TO FILE COMPETING
APPLICATION,’’ ‘‘COMPETING
APPLICATION,’’ ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
p. Procedural schedule: We intend to
accept the consultation that has
occurred on this project during the prefiling period as satisfying our
requirements for the standard threestage consultation process under 18 CFR
VerDate Mar<15>2010
14:21 Oct 23, 2012
Jkt 229001
4.38 and for the National Environmental
Policy Act scoping and the application
will be processed according to the
following procedural schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Target date
Comments, recommendations, and
terms and conditions
due.
Reply comments due ..
Notice of the availability of the EA.
December 17, 2012.
January 30, 2013.
April 15, 2013.
Dated: October 17, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–26133 Filed 10–23–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC13–16–000.
Applicants: Chisholm View Wind
Project, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, Request for
Expedited Consideration and
Confidential Treatment of Chisholm
View Wind Project, LLC.
Filed Date: 10/15/12.
Accession Number: 20121015–5221.
Comments Due: 5 p.m. ET 11/5/12.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–90–000.
Applicants: Public Service Electric
and Gas Company, PJM Interconnection,
L.L.C.
Description: PJM TOs—Revisions to
the PJM Tariff to Modify Cost Allocation
to be effective 2/1/2013.
Filed Date: 10/11/12.
Accession Number: 20121011–5112.
Comments Due: 5 p.m. ET 11/9/12.
Docket Numbers: ER13–132–000.
Applicants: Southwestern Public
Service Company.
Description: 2012–10–16–SPSSherman 3–CA–657–0 0 0 to be effective
10/17/2012.
Filed Date: 10/16/12.
Accession Number: 20121016–5026.
Comments Due: 5 p.m. ET 11/6/12.
Docket Numbers: ER13–133–000.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Applicants: Sycamore Cogeneration
Company, Southern California Edison
Company.
Description: Application of Sycamore
Cogeneration Company and Southern
California Edison Company for affiliate
transaction.
Filed Date: 10/16/12.
Accession Number: 20121016–5049.
Comments Due: 5 p.m. ET 11/6/12.
Docket Numbers: ER13–134–000.
Applicants: GP Big Island, LLC.
Description: GP Big Island, LLC
submits tariff filing per 35.1: GeorgiaPacific Entities to be effective 10/17/
2012.
Filed Date: 10/16/12.
Accession Number: 20121016–5092.
Comments Due: 5 p.m. ET 11/6/12.
Docket Numbers: ER13–135–000.
Applicants: Brunswick Cellulose LLC.
Description: Brunswick Cellulose LLC
submits tariff filing per 35.1: GeorgiaPacific Entities to be effective 10/17/
2012.
Filed Date: 10/16/12.
Accession Number: 20121016–5093.
Comments Due: 5 p.m. ET 11/6/12.
Docket Numbers: ER13–136–000.
Applicants: Georgia-Pacific Brewton
LLC.
Description: Georgia-Pacific Brewton
LLC submits tariff filing per 35.1:
Georgia-Pacific Entities to be effective
10/17/2012.
Filed Date: 10/16/12.
Accession Number: 20121016–5094.
Comments Due: 5 p.m. ET 11/6/12.
Docket Numbers: ER13–137–000.
Applicants: Georgia-Pacific Cedar
Springs LLC.
Description: Georgia-Pacific Cedar
Springs LLC submits tariff filing per
35.1: Georgia-Pacific Entities to be
effective 10/17/2012.
Filed Date: 10/16/12.
Accession Number: 20121016–5095.
Comments Due: 5 p.m. ET 11/6/12.
Docket Numbers: ER13–138–000.
Applicants: Georgia-Pacific Consumer
Operations LLC.
Description: Georgia-Pacific
Consumer Operations LLC, Palatka
submits tariff filing per 35.1: GeorgiaPacific Entities to be effective 10/17/
2012.
Filed Date: 10/16/12.
Accession Number: 20121016–5096.
Comments Due: 5 p.m. ET 11/6/12.
Docket Numbers: ER13–139–000.
Applicants: Lockhart Power
Company.
Description: Lockhart Power
Company submits Notice of
Cancellation of its OATT.
Filed Date: 10/16/12.
Accession Number: 20121016–5101.
E:\FR\FM\24OCN1.SGM
24OCN1
Agencies
[Federal Register Volume 77, Number 206 (Wednesday, October 24, 2012)]
[Notices]
[Pages 64973-64974]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-26133]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14367-001]
Don W. Gilbert Hydro Power, LLC; Notice of Application Accepted
for Filing With the Commission; Intent To Waive Scoping; Soliciting
Motions To Intervene and Protests; Ready for Environmental Analysis;
and Soliciting Comments, Terms and Conditions, Recommendations, and
Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Minor License.
b. Project No.: 14367-001.
c. Date filed: May 30, 2012.
d. Applicant: Don W. Gilbert Hydro Power, LLC.
e. Name of Project: Gilbert Hydroelectric Project.
f. Location: The project would utilize unnamed springs near the
Bear River, eight miles southwest of Grace, Caribou County, Idaho. The
project would not occupy any federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
(2006).
h. Applicant Contact: Don W. Gilbert and DeAnn G. Somonich, Don W.
Gilbert Hydro Power, LLC, 1805 Grace Power Plant Road, Grace, Idaho
83241. Phone: (801) 725-1754.
i. FERC Contact: Kelly Wolcott, (202) 502-6480 or
kelly.wolcott@ferc.gov.
j. Deadline for filing motions to intervene and protests, requests
for cooperating agency status, comments, terms and conditions,
recommendations, and prescriptions: 60 days from the issuance date of
this notice; reply comments are due 105 days from the issuance date of
this notice.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. The Gilbert Project would consist of the following new features:
(1) A 8-foot-long, 3-foot-wide, 3-foot-deep drop inlet structure; (2) a
2-foot-diameter, 700-foot-long partially buried steel or plastic
penstock; (3) a powerhouse containing two 45-kilowatt (kW) turbine/
generator units for a total installed capacity of 90 kW; (4) a tailrace
to convey flows from the powerhouse to the Bear River; (5) a 150-foot-
long, 480-kilovolt transmission line; and (6) appurtenant facilities.
The project is estimated to generate an average of 550 megawatthours
annually. The project would be located on lands owned by the applicant.
m. Due to the applicant's close coordination with federal and state
agencies during the preparation of the application, completed studies,
and agency comments, we intend to waive scoping. Based on a review of
the application, resource agency consultation letters, and comments
filed to date, Commission staff intends to prepare a single
environmental assessment (EA). Commission staff determined that the
issues that need to be addressed in its EA have been adequately
identified during the pre-filing period, which included a public
meeting and site visit, and no new issues are likely to be identified
through additional scoping. The EA will consider assessing the
potential effects of project construction and operation on geology and
soils, aquatic, terrestrial, threatened and endangered species, and
cultural and historic resources.
n. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before the specified intervention
deadline date, a competing development application, or a notice of
intent to file such an application. Submission of a timely notice of
intent allows an interested person to file the competing development
application no later than 120 days after the specified intervention
deadline date. Applications for preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the exact name, business address,
and telephone number of the prospective applicant, and must include an
[[Page 64974]]
unequivocal statement of intent to submit a development application. A
notice of intent must be served on the applicant(s) named in this
public notice.
Anyone may submit comments, a protest, or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, .211, and .214. In determining the appropriate action to
take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on or
before the specified comment date for the particular application.
All filings must (1) Bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,''
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or
``PRESCRIPTIONS;'' (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments,
recommendations, terms and conditions or prescriptions must set forth
their evidentiary basis and otherwise comply with the requirements of
18 CFR 4.34(b). Agencies may obtain copies of the application directly
from the applicant. A copy of any protest or motion to intervene must
be served upon each representative of the applicant specified in the
particular application. A copy of all other filings in reference to
this application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
o. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
p. Procedural schedule: We intend to accept the consultation that
has occurred on this project during the pre-filing period as satisfying
our requirements for the standard three-stage consultation process
under 18 CFR 4.38 and for the National Environmental Policy Act scoping
and the application will be processed according to the following
procedural schedule. Revisions to the schedule may be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Comments, recommendations, and terms December 17, 2012.
and conditions due.
Reply comments due................... January 30, 2013.
Notice of the availability of the EA. April 15, 2013.
------------------------------------------------------------------------
Dated: October 17, 2012.
Kimberly D. Bose,
Secretary.