Questar Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed ML 41 Compression Project and Request for Comments on Environmental Issues, 64503-64505 [2012-25813]
Download as PDF
Federal Register / Vol. 77, No. 204 / Monday, October 22, 2012 / Notices
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on November 9, 2012. 2
Dated: October 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–25815 Filed 10–19–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Docket Nos.
wreier-aviles on DSK5TPTVN1PROD with
A V Solar Ranch 1, LLC ......
EG12–83–000
2011), FERC Stats. & Regs. ¶ 31,323 (2011), order
on reh’g, Order No. 1000–A, 77 FR 32,184 (May 31,
2012), 139 FERC ¶ 61,132 (2012).
2 This notice is not being issued in response to
any motion for extension of time for the submission
of interventions or protests. Specific motions for
extension of time will be addressed separately.
VerDate Mar<15>2010
15:00 Oct 19, 2012
Jkt 229001
Docket Nos.
Spion Kop Wind, LLC ..........
Shiloh IV Wind Project, LLC
Chisholm View Wind
Project, LLC.
Los Vientos Windpower IA,
LLC.
Los Vientos Windpower IB,
LLC.
Mehoopany Wind Energy
LLC.
Russell City Energy Company, LLC.
Zephyr Wind, LLC ................
Beebe Renewable Energy,
LLC.
Spinning Spur Wind, LLC ....
Laurel Hill Wind Energy,
LLC.
Bobcat Bluff Wind Project,
LLC.
EG12–84–000
EG12–85–000
EG12–86–000
EG12–87–000
EG12–88–000
EG12–89–000
EG12–90–000
EG12–91–000
EG12–92–000
EG12–93–000
EG12–94–000
EG12–95–000
Take notice that during the month of
September 2012, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: October 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–25814 Filed 10–19–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[Docket No. CP12–524–000]
Questar Pipeline Company; Notice of
Intent To Prepare an Environmental
Assessment for the Proposed ML 41
Compression Project and Request for
Comments on Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the ML 41 Compression Project (Project)
involving construction and operation of
facilities by Questar Pipeline Company
(Questar) in Utah and Carbon Counties,
Utah. The Commission will use this EA
in its decision-making process to
determine whether the project is in the
public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on November
14, 2012.
Frm 00042
Fmt 4703
Sfmt 4703
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed Project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
Questar provided landowners with a
fact sheet prepared by the FERC entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’.
This fact sheet addresses a number of
typically-asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC Web site
(www.ferc.gov).
Summary of the Proposed Project
Federal Energy Regulatory
Commission
PO 00000
64503
Questar proposes to modify existing
natural gas facilities on its southern
pipeline transmission system in Utah
and Carbon Counties, Utah. The Project
would provide higher delivery pressures
at Questar’s existing Payson Gate Meter
Station for the downstream Lake Side 2
Power Plant. No incremental capacity
would be created from the Project.
The Project would consist of the
following facilities in Utah County:
• A second compressor package at its
existing Thistle Creek Compressor
Station;
• Replacement of approximately 0.9
miles of existing 18-inch-diameter
pipeline to establish a higher maximum
allowed operating pressure; and
• Metering and ancillary facility
upgrades at Questar’s existing Payson
Gate Meter Station.
In addition, Questar would make
piping and meter modifications at its
existing Oak Spring Compressor Station
in Carbon County.
The general location of the project
facilities is shown in appendix 1.1
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
E:\FR\FM\22OCN1.SGM
Continued
22OCN1
64504
Federal Register / Vol. 77, No. 204 / Monday, October 22, 2012 / Notices
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 19.2 acres of land
for the aboveground facilities and the
pipeline. All pipeline and new
aboveground facilities would be
installed and operated within the
boundaries of existing permanent rightof-way or existing facility sites.
The EA Process
wreier-aviles on DSK5TPTVN1PROD with
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed Project under these general
headings:
• Geology and soils;
• Land use;
• Water resources, fisheries, and
wetlands;
• Cultural resources;
• Vegetation and wildlife;
• Socioeconomics;
• Air quality and noise;
• Endangered and threatened species;
and
• Public safety.
We will also evaluate reasonable
alternatives to the proposed Project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Depending on the comments
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before making our
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
VerDate Mar<15>2010
15:00 Oct 19, 2012
Jkt 229001
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section
beginning on page 4.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues of this project to
formally cooperate with us in the
preparation of the EA.3 Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with Utah
State Historic Preservation Office
(SHPO), and to solicit their views and
those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.4 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project develops. On natural gas
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). Our EA for this
project will document our findings on
the impacts on historic properties and
summarize the status of consultations
under section 106.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, § 1501.6.
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
Washington, DC on or before November
14, 2012.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP12–524–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You can file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed Project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
E:\FR\FM\22OCN1.SGM
22OCN1
Federal Register / Vol. 77, No. 204 / Monday, October 22, 2012 / Notices
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
DEPARTMENT OF ENERGY
Becoming an Intervenor
[Project No. 14449–000]
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site.
Archon Energy 1, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
Additional Information
wreier-aviles on DSK5TPTVN1PROD with
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP12–524). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: October 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–25813 Filed 10–19–12; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
15:00 Oct 19, 2012
Jkt 229001
Federal Energy Regulatory
Commission
On August 30, 2012, Archon Energy 1,
Inc. filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Kings
River Drop 6 Hydroelectric Project
(Kings River Drop 6 Project or project)
at the Peoples Weir on the Kings River,
near the city of Kingsburg in King
County, California. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new gated water
intake structure and canal adjacent to
the north abutment of the existing dam;
(2) a 70-foot by 55-foot by 35-foot
turbine structure enclosing five 400kilowatt Archimedes-screw-type
turbines, each 13 feet in diameter and
45 feet in length; (3) a 900-foot-long,
12.4-kilovolt primary transmission line
connecting the project with Pacific Gas
and Electric’s transmission lines; and (4)
appurtenant facilities. The proposed
project would have a capacity of 2.0
megawatts and generate an estimated
average of 14,500 megawatt-hours
annually by passing stream flow
through the powerhouse that normally
would pass over the dam.
Applicant Contact: Mr. Paul Grist,
Archon Energy 1, Inc., 101 E. Kennedy
Blvd., Suite 2800, Tampa, Florida
33602, phone: (403) 618–2018.
FERC Contact: Joseph Hassell; phone:
(202) 502–8079.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
64505
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14449) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: October 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–25880 Filed 10–19–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Staff Attendance at
Southwest Power Pool Regional Entity
Trustee, Regional State Committee and
Board of Directors Meetings
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of its staff may
attend the meetings of the Southwest
Power Pool, Inc. (SPP) Regional Entity
Trustee (RE), Regional State Committee
(RSC) and Board of Directors, as noted
below. Their attendance is part of the
Commission’s ongoing outreach efforts.
All meetings will be held at the SPP
Corporate Offices, 201 Worthen Drive,
Little Rock, AR 722111. The phone
number is (501) 312–9000.
SPP RE
October 29, 2012 (8:00 a.m.–12:00
p.m.)
SPP RSC
October 29, 2012 (1:00 p.m.–5:00
p.m.)
E:\FR\FM\22OCN1.SGM
22OCN1
Agencies
[Federal Register Volume 77, Number 204 (Monday, October 22, 2012)]
[Notices]
[Pages 64503-64505]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-25813]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP12-524-000]
Questar Pipeline Company; Notice of Intent To Prepare an
Environmental Assessment for the Proposed ML 41 Compression Project and
Request for Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the ML 41 Compression Project
(Project) involving construction and operation of facilities by Questar
Pipeline Company (Questar) in Utah and Carbon Counties, Utah. The
Commission will use this EA in its decision-making process to determine
whether the project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues they need to evaluate in the EA. Please note that
the scoping period will close on November 14, 2012.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
Project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable agreement. However, if
the Commission approves the project, that approval conveys with it the
right of eminent domain. Therefore, if easement negotiations fail to
produce an agreement, the pipeline company could initiate condemnation
proceedings where compensation would be determined in accordance with
state law.
Questar provided landowners with a fact sheet prepared by the FERC
entitled ``An Interstate Natural Gas Facility On My Land? What Do I
Need To Know?''. This fact sheet addresses a number of typically-asked
questions, including the use of eminent domain and how to participate
in the Commission's proceedings. It is also available for viewing on
the FERC Web site (www.ferc.gov).
Summary of the Proposed Project
Questar proposes to modify existing natural gas facilities on its
southern pipeline transmission system in Utah and Carbon Counties,
Utah. The Project would provide higher delivery pressures at Questar's
existing Payson Gate Meter Station for the downstream Lake Side 2 Power
Plant. No incremental capacity would be created from the Project.
The Project would consist of the following facilities in Utah
County:
A second compressor package at its existing Thistle Creek
Compressor Station;
Replacement of approximately 0.9 miles of existing 18-
inch-diameter pipeline to establish a higher maximum allowed operating
pressure; and
Metering and ancillary facility upgrades at Questar's
existing Payson Gate Meter Station.
In addition, Questar would make piping and meter modifications at
its existing Oak Spring Compressor Station in Carbon County.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE., Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
[[Page 64504]]
Land Requirements for Construction
Construction of the proposed facilities would disturb about 19.2
acres of land for the aboveground facilities and the pipeline. All
pipeline and new aboveground facilities would be installed and operated
within the boundaries of existing permanent right-of-way or existing
facility sites.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as ``scoping.'' The main goal of
the scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. We will
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the proposed Project under these
general headings:
Geology and soils;
Land use;
Water resources, fisheries, and wetlands;
Cultural resources;
Vegetation and wildlife;
Socioeconomics;
Air quality and noise;
Endangered and threatened species; and
Public safety.
We will also evaluate reasonable alternatives to the proposed
Project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments received during the scoping process, we may also publish
and distribute the EA to the public for an allotted comment period. We
will consider all comments on the EA before making our recommendations
to the Commission. To ensure we have the opportunity to consider and
address your comments, please carefully follow the instructions in the
Public Participation section beginning on page 4.
With this notice, we are asking agencies with jurisdiction by law
and/or special expertise with respect to the environmental issues of
this project to formally cooperate with us in the preparation of the
EA.\3\ Agencies that would like to request cooperating agency status
should follow the instructions for filing comments provided under the
Public Participation section of this notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Sec. 1501.6.
---------------------------------------------------------------------------
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with Utah State Historic Preservation Office (SHPO), and to solicit
their views and those of other government agencies, interested Indian
tribes, and the public on the project's potential effects on historic
properties.\4\ We will define the project-specific Area of Potential
Effects (APE) in consultation with the SHPO as the project develops. On
natural gas facility projects, the APE at a minimum encompasses all
areas subject to ground disturbance (examples include construction
right-of-way, contractor/pipe storage yards, compressor stations, and
access roads). Our EA for this project will document our findings on
the impacts on historic properties and summarize the status of
consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that the Commission receives them in Washington, DC on or before
November 14, 2012.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number (CP12-524-000) with your
submission. The Commission encourages electronic filing of comments and
has expert staff available to assist you at (202) 502-8258 or
efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for interested persons to
submit brief, text-only comments on a project;
(2) You can file your comments electronically using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
You can file a paper copy of your comments by mailing them to the
following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed Project.
If we publish and distribute the EA, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of
[[Page 64505]]
the CD version or would like to remove your name from the mailing list,
please return the attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are in
the User's Guide under the ``e-filing'' link on the Commission's Web
site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., CP12-
524). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: October 15, 2012.
Kimberly D. Bose,
Secretary.