Environmental Impacts Statements; Notice of Availability, 64334 [2012-25829]
Download as PDF
64334
Federal Register / Vol. 77, No. 203 / Friday, October 19, 2012 / Notices
Western’s action. Western’s action does
not affect floodplains or wetlands.
ENVIRONMENTAL PROTECTION
AGENCY
Alternatives Considered
[ER–FRL–9005–6]
FHWA examined several road
alignment alternatives, ultimately
selecting Alternative D as their preferred
alternative. Western had to wait for
FHWA to decide on its course of action
before determining which transmission
structures and lines would be affected
and need to be modified. The no action
alternative assumed that the Project
would not be constructed and no
transmission structures or lines would
need to be modified. FHWA did not
select the no action alternative since it
did not meet their purpose and need.
Mitigation Measures
Western will adhere to its
Construction Standard 13
‘‘Environmental Quality Protection.’’
Long-term operations of the
transmission line will follow Western’s
standard operating procedures and will
not be affected by this action. In
addition to Construction Standard 13,
the following measures apply to the
modifications that will be made to
Western’s transmission system:
1. Protection of the desert tortoise
through compliance with the FHWA
Biological Opinion.
2. Protection of cultural and historical
resources as signatories to the
Programmatic Agreement.
Decision
Western’s decision is to modify its
transmission system as described above
in support of FHWA’s decision to
construct Alternative D.1 This ROD was
prepared following the requirements of
the Council on Environmental Quality
Regulations for Implementing NEPA (40
CFR parts 1500–1508) and DOE’s
Procedures for Implementing NEPA (10
CFR part 1021).
Dated: September 19, 2012.
Anita J. Decker,
Acting Administrator.
[FR Doc. 2012–25783 Filed 10–18–12; 8:45 am]
tkelley on DSK3SPTVN1PROD with NOTICES
BILLING CODE 6450–01–P
1 On November 16, 2011, DOE’s Acting General
Counsel delegated to Western’s Administrator all
the authorities of the General Counsel respecting
environmental impact statements.
VerDate Mar<15>2010
16:06 Oct 18, 2012
Jkt 229001
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements Filed 10/08/2012
Through 10/12/2012 Pursuant to 40
CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
As of
October 1, 2012, EPA will not accept
paper copies or CDs of EISs for filing
purposes; all submissions on or after
October 1, 2012 must be made through
e-NEPA. While this system eliminates
the need to submit paper or CD copies
to EPA to meet filing requirements,
electronic submission does not change
requirements for distribution of EISs for
public review and comment. To begin
using e-NEPA, you must first register
with EPA’s electronic reporting site—
https://cdx.epa.gov/epa_home.asp.
EIS No. 20120326, Draft EIS, USFS, WI,
Lakewood Southeast Project,
Proposes to Manage Vegetation and
Habitat, Lakewood-Laona Ranger
District, Chequamegon-Nicolet
National Forest, Oconto County,
WI, Comment Period Ends: 12/03/
2012, Contact: Marilee Houtler 715–
276–6333.
EIS No. 20120327, Final EIS, FHWA,
CA, Interstate 80/Interstate 680/
State Route 12 Interchange Project,
Improvements, Solano County, CA,
Review Period Ends: 11/19/2012,
Contact: Melanie Brent 510–286–
5907.
EIS No. 20120328, Draft EIS, FHWA,
TN, James White Parkway (State
Route 71) Construction, from
Chapman Highway to Moody
Avenue, Knox County, TN,
Comment Period Ends: 12/03/2012,
Contact: Theresa Claxton 615–781–
5770.
EIS No. 20120329, Draft EIS, FAA, AK,
Kodiak Airport Runway Safety Area
Improvements, Kodiak, AK,
Comment Period Ends: 12/18/2012,
Contact: Leslie Grey 907–271–5453.
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
EIS No. 20120330, Draft EIS, USFS, MT,
Flint Foothills Vegetation
Management Project, BeaverheadDeerlodge National Forest, Pintler
Ranger District, Granite and Powell
Counties, MT, Comment Period
Ends: 12/03/2012, Contact: Karen
Gallogly 208–756–5103.
EIS No. 20120331, Draft EIS, BLM, OR,
West Eugene Wetlands Resource
Management Plan, Proposes to
Adopt a Resource Management Plan
for the BLM-Administered Lands,
Lane County, OR, Comment Period
Ends: 01/17/2013, Contact: Richard
Hardt 541–683–6600.
EIS No. 20120332, Draft EIS, USFS, MT,
Jack Rabbit to Big Sky Meadow
Village 161 kV Transmission Line
Upgrade, Bozeman Ranger District,
Gallatin National Forest, Gallatin
County, MT, Comment Period Ends:
12/03/2012, Contact: Amy Waring
406–255–1451.
EIS No. 20120333, Final Supplement,
USFS, APHIS, 00, Gypsy Moth
Management in the United States, A
Cooperative Approach—Proposing
New Treatment Options, United
States, Review Period Ends: 11/19/
2012, Contact: Noel Schneeberger
610–557–4121.
The U.S. Department of Agriculture’s
Forest Service and the Animal Plant
Health Inspection Service are joint lead
agencies for the above project.
Dated: October 16, 2012.
Cliff Rader,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2012–25829 Filed 10–18–12; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL—9743–3]
Notification of a Public Teleconference
of the Clean Air Scientific Advisory
Committee (CASAC) Ozone Review
Panel
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The EPA Science Advisory
Board (SAB) Staff Office announces a
public teleconference of the CASAC
Ozone Review Panel to discuss its draft
reviews of four EPA documents:
Integrated Science Assessment for
Ozone and Related Photochemical
Oxidants (Third External Review
Draft—June 2012), Health Risk and
Exposure Assessment for Ozone (First
External Review Draft—Updated August
SUMMARY:
E:\FR\FM\19OCN1.SGM
19OCN1
Agencies
[Federal Register Volume 77, Number 203 (Friday, October 19, 2012)]
[Notices]
[Page 64334]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-25829]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9005-6]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 10/08/2012
Through 10/12/2012 Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
SUPPLEMENTARY INFORMATION: As of October 1, 2012, EPA will not accept
paper copies or CDs of EISs for filing purposes; all submissions on or
after October 1, 2012 must be made through e-NEPA. While this system
eliminates the need to submit paper or CD copies to EPA to meet filing
requirements, electronic submission does not change requirements for
distribution of EISs for public review and comment. To begin using e-
NEPA, you must first register with EPA's electronic reporting site--
https://cdx.epa.gov/epa_home.asp.
EIS No. 20120326, Draft EIS, USFS, WI, Lakewood Southeast Project,
Proposes to Manage Vegetation and Habitat, Lakewood-Laona Ranger
District, Chequamegon-Nicolet National Forest, Oconto County, WI,
Comment Period Ends: 12/03/2012, Contact: Marilee Houtler 715-276-6333.
EIS No. 20120327, Final EIS, FHWA, CA, Interstate 80/Interstate 680/
State Route 12 Interchange Project, Improvements, Solano County, CA,
Review Period Ends: 11/19/2012, Contact: Melanie Brent 510-286-5907.
EIS No. 20120328, Draft EIS, FHWA, TN, James White Parkway (State Route
71) Construction, from Chapman Highway to Moody Avenue, Knox County,
TN, Comment Period Ends: 12/03/2012, Contact: Theresa Claxton 615-781-
5770.
EIS No. 20120329, Draft EIS, FAA, AK, Kodiak Airport Runway Safety Area
Improvements, Kodiak, AK, Comment Period Ends: 12/18/2012, Contact:
Leslie Grey 907-271-5453.
EIS No. 20120330, Draft EIS, USFS, MT, Flint Foothills Vegetation
Management Project, Beaverhead-Deerlodge National Forest, Pintler
Ranger District, Granite and Powell Counties, MT, Comment Period Ends:
12/03/2012, Contact: Karen Gallogly 208-756-5103.
EIS No. 20120331, Draft EIS, BLM, OR, West Eugene Wetlands Resource
Management Plan, Proposes to Adopt a Resource Management Plan for the
BLM-Administered Lands, Lane County, OR, Comment Period Ends: 01/17/
2013, Contact: Richard Hardt 541-683-6600.
EIS No. 20120332, Draft EIS, USFS, MT, Jack Rabbit to Big Sky Meadow
Village 161 kV Transmission Line Upgrade, Bozeman Ranger District,
Gallatin National Forest, Gallatin County, MT, Comment Period Ends: 12/
03/2012, Contact: Amy Waring 406-255-1451.
EIS No. 20120333, Final Supplement, USFS, APHIS, 00, Gypsy Moth
Management in the United States, A Cooperative Approach--Proposing New
Treatment Options, United States, Review Period Ends: 11/19/2012,
Contact: Noel Schneeberger 610-557-4121.
The U.S. Department of Agriculture's Forest Service and the Animal
Plant Health Inspection Service are joint lead agencies for the above
project.
Dated: October 16, 2012.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2012-25829 Filed 10-18-12; 8:45 am]