Download as PDF Federal Register / Vol. 77, No. 200 / Tuesday, October 16, 2012 / Notices document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on November 5, 2012. Dated: October 9, 2012. Kimberly D. Bose, Secretary. docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 25, 2012. Dated: October 9, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–25392 Filed 10–15–12; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2012–25389 Filed 10–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. PF12–9–000] [Docket No. PA10–13–000] tkelley on DSK3SPTVN1PROD with NOTICES ITC Holdings Corp.; Notice of Filing Take notice that on September 28, 2012, ITC Holdings Corp. and ITC Midwest LLC (collectively ITC) filed its Refund Report in the above-docketed proceeding in compliance with the May 11, 2012 Order on Paper Hearing (Order), 139 FERC ¶ 61,112, issued by the Commission. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed VerDate Mar<15>2010 17:31 Oct 15, 2012 Jkt 229001 Constitution Pipeline Company, LLC; Notice of Public Scoping Meeting and Extension of Scoping Period for the Planned Constitution Pipeline Project On October 24, 2012, the Federal Energy Regulatory Commission (FERC or Commission) will hold an additional public scoping meeting for Constitution Pipeline Company’s (Constitution) Constitution Pipeline Project. This notice also extends the scoping period for the project, which will now close on November 9, 2012. The project would consist of a 120.6-mile-long natural gas pipeline in Susquehanna County, Pennsylvania; and Broome, Chenango, Delaware, and Schoharie Counties, New York. FERC staff will conduct this public scoping meeting as part of our preparation of an environmental impact statement (EIS) for the project. The scoping meeting is designed to provide the public with an opportunity to offer verbal comments on the project and on the issues they believe should be addressed in the EIS. More information about this project and the Commission’s EIS process is available in the Notice of Intent to Prepare an Environmental Impact Statement for the Planned Constitution Pipeline Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings (NOI), issued on September 7, 2012. The NOI also provides details on how to submit written comments in lieu of or in addition to verbal comments on the project.1 We ask that you submit your comments so that we receive them by November 9, 2012. Constitution representatives will be present one hour before the meeting with maps of the potential routes. The 1 The NOI can be viewed on the Commission’s eLibrary link under Accession Number 20120907– 3012. PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 63309 additional public scoping meeting is scheduled as follows: Wednesday, October 24, 2012, Beginning at 7:00–10:00 p.m. EDT, Foothills Performing Arts & Civic Center Atrium, 24 Market Street, Oneonta, New York 13820 This and all public meetings will be posted on the Commission’s calendar located at www.ferc.gov/EventCalendar/ EventsList.aspx along with other related information. This notice is being sent to the Commission’s current environmental mailing list for this project. Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site at www.ferc.gov using the ‘‘eLibrary’’ link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., PF12–9). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. Dated: October 9, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–25388 Filed 10–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meetings The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission, DOE. DATE AND TIME: October 18, 2012. 9:00 a.m. *NOTE: There has been a time change for this meeting only. Room 2C, 888 First Street NE., Washington, DC 20426. STATUS: Open. MATTERS TO BE CONSIDERED: Agenda. PLACE: *NOTE: Items listed on the agenda may be deleted without further notice. CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. E:\FR\FM\16OCN1.SGM 16OCN1 63310 Federal Register / Vol. 77, No. 200 / Tuesday, October 16, 2012 / Notices This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 985TH—MEETING; REGULAR MEETING [October 18, 2012, 9:00 a.m.] Item No. Docket No. Company ADMINISTRATIVE A–1 ............... A–2 ............... AD02–1–000 AD02–7–000 Agency Business Matters. Customer Matters, Reliability, Security and Market Operations. ELECTRIC E–1 ............... E–2 ............... E–3 ............... E–4 ............... E–5 ............... E–6 ............... E–7 ............... E–8 ............... E–9 ............... E–10 ............. E–11 ............. E–12 ............. E–13 ............. E–14 ............. RM10–23– 002 RM12–22– 000 RM12–4–000 ER12–1179– 000 ER12–1179– 001. ER12–550– 000 OMITTED. ER12–2506– 000 EL12–100– 000 OMITTED. OMITTED. EL12–75–000 OMITTED. EC11–60– 004 ER12–1339– 001. ER12–1340– 001. ER12–1341– 001. ER12–1342– 001 ER11–3839– 000 ER11–3839– 001. Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities. Reliability Standards for Geomagnetic Disturbances. Revisions to Reliability Standard for Transmission Vegetation Management. Southwest Power Pool, Inc. Southwest Power Pool, Inc. Southern California Edison Company. Benjamin Riggs v. Rhode Island Public Utilities Commission. Pepco Holdings, Inc. Duke Energy Corporation Progress Energy, Inc. Carolina Power & Light Company. Duke Energy Carolinas, LLC. Nevada Power Company. MISCELLANEOUS M–1 ............... RM12–2–000 Filing of Privileged Materials and Answers to Motions. GAS G–1 ............... G–2 ............... G–3 ............... G–4 ............... OMITTED. RM12–14– 000 RM12–15– 000 RM12–17– 000 Annual Charge Filing Procedures for Natural Gas Pipelines. Filing, Indexing and Service Requirements for Oil Pipelines. Revisions to Procedural Regulations Governing Transportation by Intrastate Pipelines. tkelley on DSK3SPTVN1PROD with NOTICES HYDRO H–1 ............... H–2 ............... H–3 ............... P–13944–002 P–82–026 DI11–13–001 Valley Affordable Housing Corporation. Alabama Power Company. Cottonwood Hydro, LLC. CERTIFICATES C–1 ............... VerDate Mar<15>2010 CP11–56– 001 16:06 Oct 15, 2012 Texas Eastern Transmission, LP and Algonquin Gas Transmission, LLC. Jkt 229001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\16OCN1.SGM 16OCN1 Federal Register / Vol. 77, No. 200 / Tuesday, October 16, 2012 / Notices 63311 985TH—MEETING; REGULAR MEETING—Continued [October 18, 2012, 9:00 a.m.] Item No. C–2 ............... Docket No. Company CP12–11– 000 CP12–11– 001. Elba Express Company, L.L.C. Dated: October 11, 2012. Kimberly D. Bose, Secretary. A free webcast of this event is available through www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2012–25490 Filed 10–12–12; 11:15 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR13–1–000] tkelley on DSK3SPTVN1PROD with NOTICES Acacia Natural Gas Corporation; Notice of Petition for Rate Approval Take notice that on October 9, 2012, Acacia Natural Gas Corporation (Acacia) filed a Petition for Rate Approval pursuant to 284.123(b)(2) of the Commissions regulations for approval of a new rate applicable to interruptible transportation service and to revise its Statement of Operating Conditions, as more fully detailed in the petition. Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and VerDate Mar<15>2010 16:06 Oct 15, 2012 Jkt 229001 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on Monday, October 22, 2012. Dated: October 10, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–25393 Filed 10–15–12; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13432–002] Lake Clementine Hydro, LLC; Notice of Successive Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 2, 2012, Lake Clementine Hydro, LLC (Lake Clementine Hydro) filed an application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA). Lake Clementine Hydro proposes to study the feasibility of the Lake Clementine Small Hydroelectric Project to be located at the U.S. Corps of Engineer’s North Fork Dam on the North Fork of the American River, near the City of Auburn, Placer County, California. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. By harnessing the water that now flows over the spillway of the North Fork Dam, Lake Clementine Hydro plans to install two 7.5 megawatt (MW) generation units, for a total installed capacity of 15 MW and an estimated annual generation of 42.0 gigawatthours. The applicant plans to study three alternative designs for the project. Applicant Contact: Mr. Magnus Johannesson, America Renewables, LLC, 46–E Peninsula Center, Palos Verdes Estates, California, 90274; phone: (310) 699–6400. FERC Contact: Jim Fargo at james.fargo@ferc.gov; phone: (202) 502– 6095. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 E:\FR\FM\16OCN1.SGM 16OCN1

Agencies

[Federal Register Volume 77, Number 200 (Tuesday, October 16, 2012)]
[Notices]
[Pages 63309-63311]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-25490]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meetings

    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

AGENCY HOLDING MEETING: Federal Energy Regulatory Commission, DOE.

DATE AND TIME: October 18, 2012. 9:00 a.m.

*Note: There has been a time change for this meeting only.

PLACE: Room 2C, 888 First Street NE., Washington, DC 20426.

STATUS: Open.

MATTERS TO BE CONSIDERED: Agenda.

*Note: Items listed on the agenda may be deleted without further 
notice.

CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.


[[Page 63310]]


    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at https://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.

                     985th--Meeting; Regular Meeting
                      [October 18, 2012, 9:00 a.m.]
------------------------------------------------------------------------
       Item No.               Docket No.                Company
------------------------------------------------------------------------
                             ADMINISTRATIVE
------------------------------------------------------------------------
A-1...................  AD02-1-000             Agency Business Matters.
A-2...................  AD02-7-000             Customer Matters,
                                                Reliability, Security
                                                and Market Operations.
------------------------------------------------------------------------
                                ELECTRIC
------------------------------------------------------------------------
E-1...................  RM10-23-002            Transmission Planning and
                                                Cost Allocation by
                                                Transmission Owning and
                                                Operating Public
                                                Utilities.
E-2...................  RM12-22-000            Reliability Standards for
                                                Geomagnetic
                                                Disturbances.
E-3...................  RM12-4-000             Revisions to Reliability
                                                Standard for
                                                Transmission Vegetation
                                                Management.
E-4...................  ER12-1179-000          Southwest Power Pool,
                                                Inc.
                        ER12-1179-001.
E-5...................  ER12-550-000           Southwest Power Pool,
                                                Inc.
E-6...................  OMITTED.               .........................
E-7...................  ER12-2506-000          Southern California
                                                Edison Company.
E-8...................  EL12-100-000           Benjamin Riggs v. Rhode
                                                Island Public Utilities
                                                Commission.
E-9...................  OMITTED.               .........................
E-10..................  OMITTED.               .........................
E-11..................  EL12-75-000            Pepco Holdings, Inc.
E-12..................  OMITTED.               .........................
E-13..................  EC11-60-004            Duke Energy Corporation
                                                Progress Energy, Inc.
                        ER12-1339-001.         Carolina Power & Light
                                                Company.
                        ER12-1340-001.
                        ER12-1341-001.
                        ER12-1342-001          Duke Energy Carolinas,
                                                LLC.
E-14..................  ER11-3839-000          Nevada Power Company.
                        ER11-3839-001.
------------------------------------------------------------------------
                              MISCELLANEOUS
------------------------------------------------------------------------
M-1...................  RM12-2-000             Filing of Privileged
                                                Materials and Answers to
                                                Motions.
------------------------------------------------------------------------
                                   GAS
------------------------------------------------------------------------
G-1...................  OMITTED.
G-2...................  RM12-14-000            Annual Charge Filing
                                                Procedures for Natural
                                                Gas Pipelines.
G-3...................  RM12-15-000            Filing, Indexing and
                                                Service Requirements for
                                                Oil Pipelines.
G-4...................  RM12-17-000            Revisions to Procedural
                                                Regulations Governing
                                                Transportation by
                                                Intrastate Pipelines.
------------------------------------------------------------------------
                                  HYDRO
------------------------------------------------------------------------
H-1...................  P-13944-002            Valley Affordable Housing
                                                Corporation.
H-2...................  P-82-026               Alabama Power Company.
H-3...................  DI11-13-001            Cottonwood Hydro, LLC.
------------------------------------------------------------------------
                              CERTIFICATES
------------------------------------------------------------------------
C-1...................  CP11-56-001            Texas Eastern
                                                Transmission, LP and
                                                Algonquin Gas
                                                Transmission, LLC.

[[Page 63311]]

 
C-2...................  CP12-11-000            Elba Express Company,
                                                L.L.C.
                        CP12-11-001.
------------------------------------------------------------------------


    Dated: October 11, 2012.
 Kimberly D. Bose,
 Secretary.
    A free webcast of this event is available through www.ferc.gov. 
Anyone with Internet access who desires to view this event can do so by 
navigating to www.ferc.gov's Calendar of Events and locating this event 
in the Calendar. The event will contain a link to its webcast. The 
Capitol Connection provides technical support for the free webcasts. It 
also offers access to this event via television in the DC area and via 
phone bridge for a fee. If you have any questions, visit 
www.CapitolConnection.org or contact Danelle Springer or David 
Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 2012-25490 Filed 10-12-12; 11:15 am]