San Gabriel Valley Water Company dba, Fontana Water Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions, 63302-63303 [2012-25395]
Download as PDF
63302
Federal Register / Vol. 77, No. 200 / Tuesday, October 16, 2012 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14448–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Jay A. Moyle; Notice of Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene,
Protests, Recommendations, and
Terms and Conditions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Conduit
Exemption.
b. Project No.: 14448–000.
c. Date filed: August 20, 2012.
d. Applicant: Jay A. Moyle.
e. Name of Project: P Coulee Power
Plant Project.
f. Location: The proposed P Coulee
Power Plant Project would be located on
a pressurized irrigation sprinkler
pipeline in Twin Falls County, Idaho.
The land on which all the project
structures are located is owned by the
applicant.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Jack J.
Straubhar, P.O. Box 5071, Twin Falls, ID
83303–5071 phone (208) 736–8255.
i. FERC Contact: Robert Bell, (202)
502–6062, robert.bell@ferc.gov.
j. Status of Environmental Analysis:
This application is ready for
environmental analysis at this time, and
the Commission is requesting
comments, reply comments,
recommendations, terms and
conditions, and prescriptions.
k. Deadline for filing responsive
documents: Due to the small size of the
proposed project, as well as the resource
agency consultation letters filed with
the application, the 60-day timeframe
specified in 18 CFR 4.34(b) for filing all
comments, motions to intervene,
protests, recommendations, terms and
conditions, and prescriptions is
shortened to 30 days from the issuance
date of this notice. All reply comments
filed in response to comments
submitted by any resource agency,
Indian tribe, or person, must be filed
with the Commission within 45 days
from the issuance date of this notice.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. The Commission strongly
encourages electronic filings.
The Commission’s Rules of Practice
and Procedure require all intervenors
VerDate Mar<15>2010
16:06 Oct 15, 2012
Jkt 229001
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
l. Description of the project: The
proposed P Coulee Power Plant Project
would consist of: (1) A proposed
powerhouse containing one proposed
generating unit with an installed
capacity of 60 kilowatts; and (2)
appurtenant facilities. The applicant
estimates the project would have an
average annual generation of 0.500
gigawatt-hours.
m. This filing is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the Web at https://www.ferc.gov/docsfiling/elibrary.asp using the ‘‘eLibrary’’
link. Enter the docket number, P–14448,
in the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for review and reproduction at
the address in item h above.
n. Development Application—Any
qualified applicant desiring to file a
competing application must submit to
the Commission, on or before the
specified deadline date for the
particular application, a competing
development application, or a notice of
intent to file such an application.
Submission of a timely notice of intent
allows an interested person to file the
competing development application no
later than 120 days after the specified
deadline date for the particular
application. Applications for
preliminary permits will not be
accepted in response to this notice.
p. Protests or Motions to Intervene—
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
q. All filings must (1) bear in all
capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’,
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
‘‘COMMENTS’’, ‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading, the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Any of these documents
must be filed by providing the original
and seven copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. An additional copy must be sent
to Director, Division of Hydropower
Administration and Compliance, Office
of Energy Projects, Federal Energy
Regulatory Commission, at the above
address. A copy of any protest or motion
to intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: October 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–25396 Filed 10–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14428–000]
San Gabriel Valley Water Company
dba, Fontana Water Company; Notice
of Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, Protests,
Recommendations, and Terms and
Conditions
October 10, 2012.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Conduit
Exemption.
b. Project No.: 14428–000.
E:\FR\FM\16OCN1.SGM
16OCN1
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 200 / Tuesday, October 16, 2012 / Notices
c. Date filed: June 27, 2012, and
supplemented on September 4, 2012.
d. Applicant: San Gabriel Valley
Water Company dba, Fontana Water
Company.
e. Name of Project: Sandhill Water
Treatment Plant In-Conduit
Hydroelectric Project.
f. Location: The proposed Sandhill
Water Treatment Plant In-Conduit
Hydroelectric Project would be located
on a water supply pipeline in San
Bernardino County, California. The land
on which all the project structures are
located is owned by the applicant.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Lon House,
NLine Energy, Inc., 533 Airport Road,
Suite 400, Burlingame, CA 94010,
phone (650) 7356–2025.
i. FERC Contact: Robert Bell, (202)
502–6062, robert.bell@ferc.gov.
j. Status of Environmental Analysis:
This application is ready for
environmental analysis at this time, and
the Commission is requesting
comments, reply comments,
recommendations, terms and
conditions, and prescriptions.
k. Deadline for filing responsive
documents: Due to the small size of the
proposed project, as well as the resource
agency consultation letters filed with
the application, the 60-day timeframe
specified in 18 CFR 4.34(b) for filing all
comments, motions to intervene,
protests, recommendations, terms and
conditions, and prescriptions is
shortened to 30 days from the issuance
date of this notice. All reply comments
filed in response to comments
submitted by any resource agency,
Indian tribe, or person, must be filed
with the Commission within 45 days
from the issuance date of this notice.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. The Commission strongly
encourages electronic filings.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
l. Description of the project: The
proposed Sandhill Water Treatment
Plant In-Conduit Hydroelectric Project
VerDate Mar<15>2010
16:06 Oct 15, 2012
Jkt 229001
would consist of: (1) A 24-inchdiameter, 24-foot-long intake pipeline,
(2) two inlet pipelines, one 12-inchdiameter, 18-foot-long intake pipeline
and one 12-inch-diameter, 14-foot-long
intake pipeline, (3) a proposed
powerhouse containing two proposed
generating units with a total installed
capacity of 310 kilowatts; (4) two outlet
pipelines, one 12-inch-diameter, 6-footlong intake pipeline and one 12-inchdiameter, 14-foot-long intake pipeline;
(5) a 24-inch-diameter, 22-foot-long
discharge pipeline and (6) appurtenant
facilities. The applicant estimates the
project would have an average annual
generation of 1.155 gigawatt-hours.
m. This filing is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the Web at https://www.ferc.gov/docsfiling/elibrary.asp using the ‘‘eLibrary’’
link. Enter the docket number, P–14428,
in the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for review and reproduction at
the address in item h above.
n. Development Application—Any
qualified applicant desiring to file a
competing application must submit to
the Commission, on or before the
specified deadline date for the
particular application, a competing
development application, or a notice of
intent to file such an application.
Submission of a timely notice of intent
allows an interested person to file the
competing development application no
later than 120 days after the specified
deadline date for the particular
application. Applications for
preliminary permits will not be
accepted in response to this notice.
p. Protests or Motions to Intervene—
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
q. All filings must (1) bear in all
capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’,
‘‘COMMENTS’’, ‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
63303
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading, the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Any of these documents
must be filed by providing the original
and seven copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. An additional copy must be sent
to Director, Division of Hydropower
Administration and Compliance, Office
of Energy Projects, Federal Energy
Regulatory Commission, at the above
address. A copy of any protest or motion
to intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: October 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–25395 Filed 10–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2335–035]
FPL Energy Maine Hydro LLC; Notice
of Intent To File License Application,
Filing of Pre-Application Document
(PAD), Commencement of Pre-Filing
Process, and Scoping; Request for
Comments on the PAD and Scoping
Document, and Identification of Issues
and Associated Study Requests
a. Type of Filing: Notice of Intent to
File License Application for a New
License and Commencing Pre-filing
Process.
b. Project No.: 2335–035.
c. Dated Filed: August 17, 2012.
d. Submitted By: FPL Energy Maine
Hydro LLC.
e. Name of Project: Williams
Hydroelectric Project.
E:\FR\FM\16OCN1.SGM
16OCN1
Agencies
[Federal Register Volume 77, Number 200 (Tuesday, October 16, 2012)]
[Notices]
[Pages 63302-63303]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-25395]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14428-000]
San Gabriel Valley Water Company dba, Fontana Water Company;
Notice of Application Accepted for Filing and Soliciting Comments,
Motions To Intervene, Protests, Recommendations, and Terms and
Conditions
October 10, 2012.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Conduit Exemption.
b. Project No.: 14428-000.
[[Page 63303]]
c. Date filed: June 27, 2012, and supplemented on September 4,
2012.
d. Applicant: San Gabriel Valley Water Company dba, Fontana Water
Company.
e. Name of Project: Sandhill Water Treatment Plant In-Conduit
Hydroelectric Project.
f. Location: The proposed Sandhill Water Treatment Plant In-Conduit
Hydroelectric Project would be located on a water supply pipeline in
San Bernardino County, California. The land on which all the project
structures are located is owned by the applicant.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Lon House, NLine Energy, Inc., 533
Airport Road, Suite 400, Burlingame, CA 94010, phone (650) 7356-2025.
i. FERC Contact: Robert Bell, (202) 502-6062, robert.bell@ferc.gov.
j. Status of Environmental Analysis: This application is ready for
environmental analysis at this time, and the Commission is requesting
comments, reply comments, recommendations, terms and conditions, and
prescriptions.
k. Deadline for filing responsive documents: Due to the small size
of the proposed project, as well as the resource agency consultation
letters filed with the application, the 60-day timeframe specified in
18 CFR 4.34(b) for filing all comments, motions to intervene, protests,
recommendations, terms and conditions, and prescriptions is shortened
to 30 days from the issuance date of this notice. All reply comments
filed in response to comments submitted by any resource agency, Indian
tribe, or person, must be filed with the Commission within 45 days from
the issuance date of this notice.
Comments, protests, and interventions may be filed electronically
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov/docs-filing/efiling.asp. The Commission strongly encourages electronic
filings.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
l. Description of the project: The proposed Sandhill Water
Treatment Plant In-Conduit Hydroelectric Project would consist of: (1)
A 24-inch-diameter, 24-foot-long intake pipeline, (2) two inlet
pipelines, one 12-inch-diameter, 18-foot-long intake pipeline and one
12-inch-diameter, 14-foot-long intake pipeline, (3) a proposed
powerhouse containing two proposed generating units with a total
installed capacity of 310 kilowatts; (4) two outlet pipelines, one 12-
inch-diameter, 6-foot-long intake pipeline and one 12-inch-diameter,
14-foot-long intake pipeline; (5) a 24-inch-diameter, 22-foot-long
discharge pipeline and (6) appurtenant facilities. The applicant
estimates the project would have an average annual generation of 1.155
gigawatt-hours.
m. This filing is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may also be viewed on the Web at
https://www.ferc.gov/docs-filing/elibrary.asp using the ``eLibrary''
link. Enter the docket number, P-14428, in the docket number field to
access the document. For assistance, call toll-free 1-866-208-3676 or
email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy
is also available for review and reproduction at the address in item h
above.
n. Development Application--Any qualified applicant desiring to
file a competing application must submit to the Commission, on or
before the specified deadline date for the particular application, a
competing development application, or a notice of intent to file such
an application. Submission of a timely notice of intent allows an
interested person to file the competing development application no
later than 120 days after the specified deadline date for the
particular application. Applications for preliminary permits will not
be accepted in response to this notice.
p. Protests or Motions to Intervene--Anyone may submit a protest or
a motion to intervene in accordance with the requirements of Rules of
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In
determining the appropriate action to take, the Commission will
consider all protests filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any protests or motions to intervene must be
received on or before the specified deadline date for the particular
application.
q. All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS'', ``REPLY COMMENTS,''
``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;''
(2) set forth in the heading, the name of the applicant and the project
number of the application to which the filing responds; (3) furnish the
name, address, and telephone number of the person protesting or
intervening; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All comments, recommendations, terms and
conditions or prescriptions must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may
obtain copies of the application directly from the applicant. Any of
these documents must be filed by providing the original and seven
copies to: The Secretary, Federal Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426. An additional copy must be sent
to Director, Division of Hydropower Administration and Compliance,
Office of Energy Projects, Federal Energy Regulatory Commission, at the
above address. A copy of any protest or motion to intervene must be
served upon each representative of the applicant specified in the
particular application. A copy of all other filings in reference to
this application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Dated: October 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-25395 Filed 10-15-12; 8:45 am]
BILLING CODE 6717-01-P